About this file

This document is an amendment to a solicitation for a construction project to upgrade the HVAC system for Building 111 at the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT).

The key details are:

  • The solicitation number is N6660424R0275.
  • The project involves HVAC upgrades to Building 111.
  • The solicitation due date has been extended from April 30, 2024 to June 28, 2024.
  • A second site visit has been scheduled for June 12, 2024.
  • The project is a 100% small business set-aside under NAICS code 236220, with an estimated value between $500,000 and $1,000,000.
  • Payment will be made electronically through Wide Area Workflow (WAWF).
  • Offerors must be registered in the System for Award Management (SAM) to be considered for award.
  • The government has provided responses to 24 questions regarding the technical requirements and construction approach.

View the file

Other files for this federal contract opportunity

Other files attached to Construction - B111 HVAC upgrade, newest first.
File Type Posted
N6660424R0275 Amendment 0003.pdf PDF
Attachment_3_Davis Bacon Act WD RI20240001 20240621.pdf PDF
N6660424R0275 Amendment 0002.pdf PDF
Attachment_3_Davis Bacon RI Wage Determination 05312024.pdf PDF
Attachment_3_Davis Bacon Wage Determination RI20240001 03_22_2024.pdf PDF
N6660424R0275.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301140278

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660424R0275

X 9B. DATED (SEE ITEM 11)

29-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Jun-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL NORMAN OUELLETTE , CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660424R0275

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 30-Apr-2024 02:00 PM to 28-Jun-2024 02:00 PM.

The required performance has changed from PROJECT TITLE AND DESCRIPTION: B111 HVAC upgrade projectProposal Due: April 30, 2024 at 2:00PM EST, Email to Michael.N.Ouellette.civ@us.navy.mil and alexander.olarte.civ@us.navy.mil NOTE: Offeror MUST be registered in the System for Award Management (SAM) to be considered for award.Magnitude per FAR 36.204: Between $500,000 and $1,000,000Method of Payment: Electronic Payment through Wide Area Workflow (WAWF) will be used.This requirement is 100% small business set aside, NAICS 236220; $45 millionSITE VISIT DATE and TIME: April 15, 2024 at 10:00AM EST, Meet at Building 80 NUWC Division New port. Please allow for sufficient time to process site visit request. See Section A for complete details.IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS

REQUIRED WITH SUBMISSION OF OFFER. PLEASE SEE SECTIONS L AND M FOR SPECIFIC

REQUIRMENTS. OFFERORS NOT SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM

CONSIDERATION FOR AWARD. to PROJECT TITLE AND DESCRIPTION: B111 HVAC upgrade projectProposal Due: June 28, 2024 at 2:00PM EST, Email to Michael.N.Ouellette.civ@us.navy.mil and alexander.olarte.civ@us.navy.mil NOTE: Offeror MUST be registered in the System for Award Management (SAM) to be considered for award.Magnitude per FAR 36.204: Between $500,000 and $1,000,000Method of Payment: Electronic Payment through Wide Area Workflow (WAWF) will be used.This requirement is 100% small business set aside, NAICS 236220; $45 millionSITE VISIT DATE and TIME: June 12, 2024 at 2:00PM EST, Meet at Building 80 NUWC Division New port. Please allow for sufficient time to process site visit request. See Section A for complete details.IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS REQUIRED

WITH SUBMISSION OF OFFER. PLEASE SEE SECTIONS L AND M FOR SPECIFIC REQUIRMENTS.

OFFERORS NOT SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM CONSIDERATION

FOR AWARD..

The following have been modified:

GENERAL INFORMATION

Distribution: TBD NUWCDIVNPT Requisition Number: TBD NUWCDIVNPT PID Number: N66604-24-RFPREQ-NPT-10-0197 NUWCDIVNPT POC: Michael Ouellette; Email: Michael.n.ouellette.civ@us.navy.mil

AMENDMENT 0001:

The purpose of this amendment is to:

1. Extend the solicitation due date to 28 June 2024.

2. Establish a second site visit on 12 June 2024 @ 2:00 PM EST.

3. Provide answers to RFI 0001 as seen below.

RFI 0001:

1. Note 3 on MD-1 states that the existing chiller and ceiling units are to be removed after the new HVAC system is installed as shown in drawing M-1. Units 2,4,6 per note 1 on M-1. Room 104 has a substantial amount of new ductwork that is connected to the new CRAC units CRU-4A and CRU-5A that is required to disperse the supply air into the room. Note 2 on M-2 states for ducts to be installed once the demo work is completed. Can we assume the CRU-4A can discharge directly into the room and be started up to run to proceed with demolition of the existing chilled water units/piping followed by installation of CRU-5A and all new ductwork from both units and then tied into the units one at a time? Correct, CRU-4A will temporarily discharge cooled air directly into the room before new duct installation.

2. As alluded in notes 8 on M-1/M-2 and note 1 on MD-1, there are obstacles that must either be routed around or relocated. The note states that the contractor shall visit the site prior to the bid and that differing field conditions is not eligible for additional compensation. Emails previously sent requesting confirmation of 1st scheduled site visit was not confirmed in a response email by the government. We request another more invasive walkthrough to perform review of utility routing and above ceiling to establish if there is anything that is immovable or that must be performed by other contractors. Will government allow this 2nd site visit and proposal extension due date? Yes. Coordinate 2nd site visit with CO.

3. Drawings do not show any ceilings, light fixtures and other devices called out to be remove and reinstalled.

Will that be done by government or contractor? If contractor is responsible for this will this be phased, or will we be able to remove all the ceiling fixtures at once if we were to carry that scope? Contractor is responsible for removal and installation. Ceiling fixtures can removed at once while providing temporary light inside the rooms.

4. Will the government forgo the requirement of FAR 52-225.9 (BAA)? Currently forecasted at 26-36 week lead times for equipment specified in drawings.

Note: if made in Mexico is acceptable, the lead times would be better. BAA requirement to be followed.

5. Plan E-4 notes all the panels are shown as type GE, but I think the ones we made modifications to last time during previous Liebert project, we recall them being Square D. Please clarify. Contractor should verify and confirm the information listed in the drawings.

6. REF M-3 Room 104 basis of design calls for model number is a DS042A in the schedule. This is a downflow system. We recommend providing model VS042A in liue of DS042A as VSO42A is a top duct supply connection. Note that the ECs fans for the units must be field mounted in a factory provided, but field assembled, 24” tall discharge plenum that will sit on the main unit. Please provide clarity. VS024A is the correct model number.

EC fans preferred for their efficiency.

7. Condensers are selected for -20F, not -30F as noted. -30F would require receivers with separately power heaters. Please provide clarity. -20F is acceptable. No need for -30F.

8. REF M-3 Notes: The displays are on the front of each unit, not in a wall mounted digital display. A network switch enclosure needing 120V would need to be provided for room 104. The other rooms will just need a network cable between the units for unit-to-unit comms and/or lead/lag. Please provide clarity. A network switch is needed to connect more than 2 units. Room 104 has 3 units thus requires a network switch. No wall mounted displays required.

9. REF M-1 Piping shows to come out of right side of units however units called out in specs would need to have piping out the left side of the room 104 units. It is not available out the right side. Please advise. Piping to match actual units.

10. REF M-1- The control of the damper between the 2 ducted units in room 104 will need to be determined. It would be good to have a damper at each unit to prevent air from traveling back through a non-operating unit. Please provide clarity. The reason why separate dampers were not used for each unit is the lack of vertical clearance.

Contractor is encouraged to show feasible improved alternate air damping between the 2 units in room 104.

11. 2.1.6 – The electric reheat on these units is not available with SCR control. Larger units have 3 stage electric reheat. The PX018 have 2 stages. Please provide clarity. Provide what the manufacturer offers in the units.

12. 2.1.9.1 – Condenser mentions -30F. We can do -20F without heated receivers. Please provide clarity. -20F condenser is acceptable. No need for -30F.

13. 2.2.1 Mentions temp/humidity recorder. This is not an option for these units. Please provide clarity.

Temp/Humidity recorder not required.

14. 2.2.2 – Might not need a device to network units together unless there are 3 units in a room. Please provide clarity. A network switch is only needed when connecting more than 2 units, as is the case for room 104.

15. 2.6.1 – Standard Factory Testing is included. We have EXCLUDED the extensive factory testing the witnessing of the testing by the engineer, owner, or others. Please advise if this is required and we will work to determine the cost for such testing. Extensive factory testing is not required.

16. 2.7 – Standard floor stands (non-Seismic) are provided. We don’t believe that the base typically bolts stands to the floor and units to the stands. Advise if this has changed and confirm floor stand heigh required in rooms 103, 104, and 105. All units to be installed on top of 12” factory provided stands.

17. 3.3 - We have included typical field startup and warranty inspection as well as up to 8 hours of normal working hours’ time for our tech to spend with the commissioning team to put the unit into various modes of operation. We have not included the extensive field test plans as noted or temp load banks to simulate heat loads.

Please provide clarity. Extensive field testing and temp load banks are not required.

18. We have included the Vertiv standard sound insulation, cabinet construction. Please confirm if this is acceptable or provide further guidance. Vertiv standard sound insulation & cabinet construction is acceptable.

19. Will all the servers in these rooms be in full operation during construction or will they be at decreased operating capacity? If so, will the government protect these items (covering, tarping, etc.) once construction begins.

All servers to be operating as usual during construction. Servers cannot be covered as it blocks cooling. Contractor to have precautions to avoid any damage.

20. Non-ducted systems in Room 103 and 105 are 8 feet tall (without stand). Please clarify what would be allowed if height of drop ceiling is an issue. Units in rooms 103 & 105 are 6.5’. there will be enough clearance to add 10” high plenum on top of each of these units.

21. Will the government allow usage of Armaflex insulation with a PVC jack for RS/RL lines? Yes.

22. Will the government allow invoicing/payments to the awarded contractor once units are delivered to the site prior to instillation? See 52.232-5, The Contractor may obtain additional regarding invoicing after award.

23. Will the government allow for the usage of ProPress RSL fittings to connect RS/RL lines to limit/excuse the need of hot work for welding/soldering? No, RSL fittings are NOT acceptable. Only brazing.

24. Will the government provide space for all units once delivered? No, space is a premium.

ALL OTHER SOLICITAION TERMS AND CONDITIONS REMAIN UNCHANGED

(End of Summary of Changes)