This document is a conformed contract award for Cable Assemblies, Copper, Fiber and Hybrid, Contract Number N6660424DL400. The contract was awarded to L3HARRIS MARITIME SERVICES INC on 2024-09-13 for a total potential value of $29,444,235.41.
The contractor shall manufacture, inspect, test, package, and deliver production build-to-print items in accordance with their respective drawings and applicable documents as detailed in the Statement of Work. The contract includes a variety of copper, fiber, and hybrid cable assemblies for the SSN688i, SSN21, SSN774, and SSBN826 submarine platforms. The delivery orders will be issued over a 60-month ordering period. Pricing is structured with firm fixed prices based on quantity ranges and ordering years. The contract is funded by Operation & Maintenance, Navy (O&MN), Other Procurement, Navy (OPN), Shipbuilding and Conversion, Navy (SCN), National Sea-Based Deterrence Fund (NSBDF), and Service Cost Center (SCC) appropriations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6660424DL400
Section SF 30 - BLOCK 14 CONTINUATION PAGE
GENERAL INFORMATION
Distribution: FILE, KR, NUWC 01/115, DCMA: S1102A DFAS: HQ0338 TPOC: 15/J. Madden 15/A. Lodge 15/K. Koepke, 15/S. Dziekan, 15/L. Mundy WAWF: 15/C. Lee; TDAA: 159/D. Young; 159/C. Lockwood
NUWCDIVNPT PID#: N66604-23-RFPREQ-NPT-15-0020
NUWCDIVNPT POC: Donovan Montville; donovan.l.montville.civ@us.navy.mil The North American Industrial Classifications System (NAICS) Code for this requirement is 334511.
The first delivery order is forthcoming and will satisfy the minimum guarantee referred to in paragraph (b) of FAR Clause 52.216-22 INDEFINITE QUANTITY.
The following funds will be obligated against the first delivery order:
Lines of Accounting (LOA):
1741810 88JC 260 240V0 0 050120 2D 000000 A00008522455
97X4930 NH6A 260 77777 0 050120 2F 000000 A00008486531
1741810 Z1SE 260 00024 0 050120 2D 000000 A00008486190
1721611 H232 260 SB450 0 050120 2D 000000 A00008458270
1741810 H8NS 260 00024 0 050120 2D 000000 A00008449265
The following changes from the solicitation document are made in this Award:
Section B-
1. Fill in CLIN structure with award specific information.
2. Fill in stepladder pricing tables with award specific information.
Section F-
1. Update Clause 52.211-8 “TIME OF DELIVERY (JUN 1997)- ALTERNATE III (APR 1984)” to reflect award specific information.
2. Fill in Clause F-247-H003 “F.O.B. Origin (NAVSEA)(OCT 2018)” with award specific information.
Section G-
1. Update Clause 252.232-7006 “WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)” to reflect award specific information.
2. Update G-242-H001 “GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA) (OCT 2018)” to reflect award specific information.
3. Add Clause 252.232-7013 “PERFORMANCE-BASED PAYMENTS--DELIVERABLE-ITEM BASIS (DEC 2022)” by full text.
Section I-
1. Add Clause 52.232-32 “PERFORMANCE-BASED PAYMENTS (APR 2012)” by full text.
2. Add Clause 52.204-47 “Prohibition on a ByteDance Covered Application (JUN 2023)”
Section J-
1. Add Attachment #1 “Performance-Based Payments Milestone Table” in its entirety.
Sections K, L and M-
1. Delete in their entirety.
The total potential value of this contract is $29,444,235.41.
All other terms and conditions remain unchanged.
The conformed contract is contained in EDA.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $2,607,405.89 |
| $2,607,405.89 |
POWER/COMMAND CLOCK CABLE- 688i
FFP
Power/Command Clock Cable- 688i, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part #:8323270-100 Drawing #:8323270 Rev. H
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
PSC CD: 6150
MAX
NET AMT
$2,607,405.89
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $4,357,309.83 |
| $4,357,309.83 |
TELEMETRY OUTBOARD CABLE- 688i
Telemetry Outboard Cable- 688i, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part #:8323265-100 Drawing #:8323265 Rev. J
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$4,357,309.83
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $3,238,064.69 |
| $3,238,064.69 |
ACOUSTIC MODULE INTERFACE CABLE- 688i
Acoustic Module Interface Cable- 688i, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:8323275-100 Drawing#:8323275 Rev. F
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$3,238,064.69
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $2,555,386.74 |
| $2,555,386.74 |
POWER/COMMAND CLOCK CABLE- SSN 21
Power/Command Clock Cable- SSN 21, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:8323270-200 Drawing#:8323270 Rev. H
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$2,555,386.74
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $4,359,387.17 |
| $4,359,387.17 |
TELEMETRY OUTBOARD CABLE- SSN 21
Telemetry Outboard Cable- SSN 21, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:8323265-200 Drawing #:8323265 Rev. J
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PSC CD: 6020
MAX
$4,359,387.17
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $3,237,519.30 |
| $3,237,519.30 |
ACOUSTIC MODULE INTERFACE CABLE- SSN 21
Acoustic Module Interface Cable- SSN 21, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:8323275-200 Drawing#:8323275 Rev. F
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$3,237,519.30
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $2,410,391.48 |
| $2,410,391.48 |
WLY-1 KEEL CABLE- SSN 774
WLY-1 Keel Cable- SSN 774, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:7487574-1 Drawing#:7487574 Rev. H
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PSC CD: 5995
MAX
$2,410,391.48
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $1,772,986.38 |
| $1,772,986.38 |
WLY-1 KEEL CABLE- SSBN 826
WLY-1 Keel Cable- SSBN 826, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#: 7487574-2 Drawing#:7487574 Rev. H
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$1,772,986.38
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $2,276,611.10 |
| $2,276,611.10 |
WLY-1 SAIL CABLE- SSN 774
WLY-1 Sail Cable- SSN 774, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:7335239-1 Drawing#:7335239 Rev. H
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$2,276,611.10
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| $2,344,333.03 |
| $2,344,333.03 |
WLY-1 SAIL CABLE- SSBN 826
WLY-1 Sail Cable- SSBN 826, in accordance with the Statement of Work in Section C.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
Part#:7335239-2 Drawing#:7335239 Rev. H
All deliveries shall include the following 'Mark For' information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract and its orders:
Mark for:
DoDAAC N60138 Naval Weapons Station Cheatham Annex 1 C Street Williamsburg, VA 23185-8792 Contract #: N6660424DL400
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
$2,344,333.03
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lot |
| $284,839.80 |
| $284,839.80 |
Non-Reoccurring Engineering Services
One time costs of Non-Reoccurring engineering services.
NOTE: The unit price reflected above is required due to contract writing system constraints. The pricing included in the pricing tables in Section B will be used for all delivery orders issued against this CLIN.
FOB: Destination
PSC CD: R425
MAX
$284,839.80
PRICING TABLES
(a) This is an Indefinite Delivery/Indefinite Quantity contract with Firm Fixed Price Provisions. The Contractor shall deliver items according to the orders issued hereunder, using the prices in the individual Contract Line Items (CLINs).
(b) Offerors shall fill in the CLINs by stating the unit price for each item by quantity and CLIN (See Pricing Table Below).
(c) The Tables below contain pricing according to each Ordering Period and Quantity Range. The Government will determine each quantity to be purchased by issuing a delivery order. Multiple items may be purchased multiple times via individual orders.
TABLES (OFFEROR TO FILL IN)
| CLIN 0001 |
| Production Power/Command Clock Cables- 688i |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-20 Each |
| Year 1 |
| $46,388.96 |
| $17,769.88 |
| $14,901.81 |
| Year 2 |
| $52,776.07 |
| $19,952.09 |
| $16,661.62 |
| Year 3 |
| $60,093.39 |
| $22,439.02 |
| $18,663.25 |
| Year 4 |
| $68,485.01 |
| $25,276.43 |
| $20,942.61 |
| Year 5 |
| $78,103.11 |
| $28,515.48 |
| $23,540.64 |
| CLIN 0002 |
| Telemetry Outboard Cables-688i |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-20 Each |
| Year 1 |
| $87,552.69 |
| $28,297.07 |
| $22,440.42 |
| Year 2 |
| $99,987.20 |
| $31,935.83 |
| $25,208.90 |
| Year 3 |
| $114,261.43 |
| $36,093.56 |
| $28,365.67 |
| Year 4 |
| $130,643.00 |
| $40,846.00 |
| $31,967.44 |
| Year 5 |
| $149,450.34 |
| $46,282.59 |
| $36,080.99 |
| CLIN 0003 |
| Acoustic Module Interface Cables-688i |
| Quantity |
| 1-9 Each |
| 10-19 Each |
| 20-29 Each |
| Year 1 |
| $44,037.19 |
| $13,403.47 |
| $11,839.20 |
| Year 2 |
| $50,074.83 |
| $14,934.18 |
| $13,139.79 |
| Year 3 |
| $56,988.99 |
| $16,672.04 |
| $14,613.35 |
| Year 4 |
| $64,914.69 |
| $18,647.63 |
| $16,285.13 |
| Year 5 |
| $74,000.57 |
| $20,896.38 |
| $18,184.78 |
| CLIN 0004 |
| Power/Command Clock Cables-SSN21 |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-20 Each |
| Year 1 |
| $46,261.80 |
| $16,875.11 |
| $14,541.39 |
| Year 2 |
| $52,642.71 |
| $19,710.91 |
| $16,923.46 |
| Year 3 |
| $59,953.48 |
| $21,255.69 |
| $18,186.60 |
| Year 4 |
| $68,338.13 |
| $23,915.60 |
| $20,394.45 |
| Year 5 |
| $77,948.88 |
| $26,950.53 |
| $22,910.27 |
| CLIN 0005 |
| Telemetry Outboard Cables-SSN21 |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-20 Each |
| Year 1 |
| $87,425.55 |
| $28,403.01 |
| $22,440.42 |
| Year 2 |
| $99,853.84 |
| $32,057.67 |
| $25,208.90 |
| Year 3 |
| $114,121.51 |
| $36,233.67 |
| $28,365.67 |
| Year 4 |
| $130,496.12 |
| $41,007.12 |
| $31,967.44 |
| Year 5 |
| $149,296.09 |
| $46,467.89 |
| $36,080.99 |
| CLIN 0006 |
| Acoustic Module Interface Cables-SSN21 |
| Quantity |
| 1-9 Each |
| 10-19 Each |
| 20-29 Each |
| Year 1 |
| $44,037.19 |
| $13,403.47 |
| $11,839.20 |
| Year 2 |
| $50,074.83 |
| $14,934.18 |
| $13,139.79 |
| Year 3 |
| $56,988.99 |
| $16,672.04 |
| $14,613.35 |
| Year 4 |
| $64,914.69 |
| $18,647.63 |
| $16,285.13 |
| Year 5 |
| $74,000.57 |
| $20,839.96 |
| $18,184.78 |
| CLIN 0007 |
| WLY-1 Kneel Cables-SSN 774 |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-15 Each |
| Year 1 |
| $58,220.31 |
| $21,232.61 |
| $16,345.38 |
| Year 2 |
| $66,265.56 |
| $23,733.93 |
| $18,201.84 |
| Year 3 |
| $75,481.12 |
| $26,670.93 |
| $20,309.21 |
| Year 4 |
| $86,046.50 |
| $30,020.31 |
| $22,704.32 |
| Year 5 |
| $98,167.07 |
| $33,844.41 |
| $25,429.80 |
| CLIN 0008 |
| WLY-1 Kneel Cables-SSBN 826 |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-15 Each |
| Year 1 |
| $58,232.35 |
| $12,825.41 |
| $9,306.90 |
| Year 2 |
| $66,279.39 |
| $14,146.09 |
| $10,107.61 |
| Year 3 |
| $75,497.05 |
| $15,636.95 |
| $11,000.73 |
| Year 4 |
| $86,064.86 |
| $17,322.74 |
| $11,999.79 |
| Year 5 |
| $98,188.22 |
| $19,232.20 |
| $13,120.27 |
| CLIN 0009 |
| WLY-1 Sail Cables- SSN 774 |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-15 Each |
| Year 1 |
| $58,212.29 |
| $19,082.30 |
| $15,101.12 |
| Year 2 |
| $66,256.32 |
| $21,342.06 |
| $16,771.25 |
| Year 3 |
| $75,470.50 |
| $23,912.20 |
| $18,664.06 |
| Year 4 |
| $86,034.28 |
| $26,839.31 |
| $20,812.53 |
| Year 5 |
| $98,153.01 |
| $30,177.15 |
| $23,255.04 |
| CLIN 0010 |
| WLY-1 Sail Cables- SSBN 826 |
| Quantity |
| 1-5 Each |
| 6-10 Each |
| 11-15 Each |
| Year 1 |
| $58,212.30 |
| $19,082.30 |
| $16,440.26 |
| Year 2 |
| $66,256.34 |
| $21,342.06 |
| $18,311.41 |
| Year 3 |
| $75,470.50 |
| $23,912.20 |
| $20,435.19 |
| Year 4 |
| $86,034.29 |
| $26,839.31 |
| $22,849.28 |
| Year 5 |
| $98,153.01 |
| $30,177.16 |
| $25,597.43 |
| CLIN 0011 |
| Non-Reoccurring Engineering Services |
| Amount |
| $284,839.80 |
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
Cables Assemblies: Copper, Fiber, and Hybrid
1.0 Background
The Fleet Sensors & Cables Engineering Branch (Code 1535) of the Sensors and Arrays Division (Code 153) of the Naval Undersea Warfare Center Division Newport serves as the Navy's Technical Design Agent (TDA) and In-Service Engineering Agent (ISEA), and assists with Acquisition Engineering Agent (AEA) activities for surface ship and submarine transducers, hydrophones and cables. Code 1535 maintains the Navy's outboard SONAR cable inventory in large part through contract vehicles established to procure the cables which are delivered to the stock system and are available to support new construction and fleet needs.
1.1 Places of Performance
All work performed under this contract will be performed at the contractor’s facility.
1.2 Authorized Users
Sensor and SONAR Systems Department, Code 15 or the Naval Undersea Warfare Center, Division Newport, RI is the only authorized user of this contract.
1.3 Sponsors
· PMS 401 Submarine Acoustic Systems
· PMS 450 Virginia Class Program Office
· PMS 397 Columbia Class Program Office
· Type Commanders
· Naval Shipyards
1.4 Types of Funding
· Operation & Maintenance, Navy (O&MN)
· Other Procurement, Navy (OPN)
· Shipbuilding and Conversion, Navy (SCN)
· National Sea-Based Deterrence Fund (NSBDF)
· Service Cost Center (SCC)
2.0 Scope
This SOW reflects a build-to-print approach. The contractor shall manufacture, inspect, test, package, and deliver production build-to-print items in accordance with their respective drawings and applicable documents as detailed below.
3.0 Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with the below Applicable Documents.
The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs).
| Number |
| Title |
| Description |
| Task Number |
| 3.1 |
| See Table 1 below |
| Cable Assemblies NAVSEA Drawings |
| 4.1.1 |
| 3.2 |
| NAVSEA S9320- |
AM-PRO-020/MLDG
REV 2
UNDERWATER CABLE ASSEMBLY AND
ENCAPSULATED COMPONENTS,
FABRICATION, REPAIR, AND INSTALLATION
MANUAL
4.1.1
| 3.3 |
| NAVSEA S9320- |
AM-PRO-030/MLDG
REV 03
UNDERWATER CABLE ASSEMBLY AND
ENCAPSULATED COMPONENTS,
FABRICATION, REPAIR, AND INSTALLATION
MANUAL, VOLUME III PLASMA SPRAY
PROCEDURE
4.1.1
Table 1. Cable Assemblies
| No. |
| Cable Type |
| Description |
| NSN |
| Part # |
| Drawing # |
| Drawing Rev |
| 1 |
| Copper |
| POWER/COMMAND CLOCK CABLE (SSN688i) |
| 6150-01-593-1910 |
| 8323270-100 |
| 8323270 |
| H |
| 2 |
| Fiber |
| TELEMETRY OUTBOARD CABLE (SSN688i) |
| 6150-01-593-2362 |
| 8323265-100 |
| 8323265 |
| J |
| 3 |
| Copper |
| ACOUSTIC MODULE INTERFACE CABLE (SSN688i) |
| 6150-01-593-1216 |
| 8323275-100 |
| 8323275 |
| F |
| 4 |
| Copper |
| POWER/COMMAND CLOCK CABLE (SSN21) |
| 6150-01-632-9987 |
| 8323270-200 |
| 8323270 |
| H |
| 5 |
| Fiber |
| TELEMETRY OUTBOARD CABLE (SSN21) |
| 6020-01-632-9986 |
| 8323265-200 |
| 8323265 |
| J |
| 6 |
| Copper |
| ACOUSTIC MODULE INTERFACE CABLE (SSN21) |
| 6150-01-632-8757 |
| 8323275-200 |
| 8323275 |
| F |
| 7 |
| Hybrid (Copper/Fiber) |
| WLY-1 KEEL CABLE (SSN774) |
| 5995-01-527-8531 |
| 7487574-1 |
| 7487574 |
| H |
| 8 |
| Hybrid (Copper/Fiber) |
| WLY-1 KEEL CABLE (SSBN826) |
| 5995-01-699-3271 |
| 7487574-2 |
| 7487574 |
| H |
| 9 |
| Hybrid (Copper/Fiber) |
| WLY-1 SAIL CABLE (SSN774) |
| 5995-01-527-8533 |
| 7335239-1 |
| 7335239 |
| H |
| 10 |
| Hybrid (Copper/Fiber) |
| WLY-1 SAIL CABLE (SSBN826) |
| 5995-01-698-4705 |
| 7335239-2 |
| 7335239 |
| H |
4.0 Technical Requirements
The contractor shall manufacture, inspect, test, package, handle and deliver Cable Assemblies in accordance with ADs 3.1 – 3.3.
4.1. Production Hardware
4.1.1 The contractor shall manufacture, inspect, test, package, handle and deliver production units in accordance with ADs 3.1-3.3.
5.0 Exception from Information and Communication Technology (ICT) Accessibility Requirements
The Government has determined that this procurement is not Information and Communication Technology (ICT) or exempt from Accessibility Standards (36 C.F.R. Part 1194, Appendix A).
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal N66604-23-R-0306 L3 Harris – Volume V Cost Price (Factor 3) dated _28 August 2024 in response to Solicitation N6660423R0306.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen. No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL-DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
(End of Text)
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (NOV 2022)
(a) Baseline Definition All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.
(b) General Requirement (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation. The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract. If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow noncompliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639E approved 11 Feb 2020, EIA-649-1A of Aug 2020, and MIL-HDBK-61B of 7 Apr 2020 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline designrelated documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a designrelated issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed rewrite, to facilitate baseline documentation changes.
(d) NonEngineering Change Proposals (NECPs) – An NECP shall be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations/Waivers In the event that a baseline designrelated document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance. The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of noncompliance and the effect on ship equipment or system operation.
(f) Equitable Adjustments for Change Documentation Preparations For its effort expended in preparing ECPs, NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.2331).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.2481) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.
C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I (NAVSEA) (MAY 2019)
(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.
(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:
(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or
(ii) add items of data or information to the attachment identified in Section J; or
(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or
(2) By submitting a request to the
Department of Defense Single Stock Point (DoDSSP) Building 4, Section D
| 700 Robbins Avenue |
| Philadelphia, Pennsylvania 19111-5094 |
| Telephone (215) 697-6396 |
| Facsimile (215) 697-9398. |
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)
The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.
Section D - Packaging and Marking
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM-D-3951-18 approved 1 May 2018, Standard Practice for Commercial Packing.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
D-247-W002 UNPACKING INSTRUCTIONS (NAVSEA) (OCT 2018)
(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked "UNPACKING INFORMATION" and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked "UNPACKING INFORMATION".
(b) Marking Containers. When unpacking instructions are provided, shipping containers will be stenciled "CAUTION-THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS ARE CAREFULLY FOLLOWED. UNPACKING INSTRUCTIONS ARE LOCATED ______________________" When practical, this marking will be applied adjacent to the identification marking on the side of the container.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Origin |
| Government |
| Origin |
| Government |
| 0002 |
| Origin |
| Government |
| Origin |
| Government |
| 0003 |
| Origin |
| Government |
| Origin |
| Government |
| 0004 |
| Origin |
| Government |
| Origin |
| Government |
| 0005 |
| Origin |
| Government |
| Origin |
| Government |
| 0006 |
| Origin |
| Government |
| Origin |
| Government |
| 0007 |
| Origin |
| Government |
| Origin |
| Government |
| 0008 |
| Origin |
| Government |
| Origin |
| Government |
| 0009 |
| Origin |
| Government |
| Origin |
| Government |
| 0010 |
| Origin |
| Government |
| Origin |
| Government |
| 0011 |
| Origin |
| Government |
| Origin |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001- 2015
NAVSEA S9320-AM-PRO-020/MLDG REV 2
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness.