N6660423RN300.pdf
PDF 1 MB Posted
- Solicitation number
- N6660423RN300
About this file
This solicitation requests proposals for the procurement of OK-410(V)4 Handling and Stowage Group systems, spare parts, assemblies, and engineering services from the Department of the Navy Naval Sea Systems Command. Key requirements include the delivery of production readiness reviews, production hardware, factory acceptance tests, engineering support, and program management. The contractor shall provide OK-410(V)4 H&SG systems, fairlead assemblies, spare parts, and engineering services to support deployment of AN/SQQ-89A(V)15 Anti-Submarine Warfare Combat Systems aboard DDG-51 and other ship classes. The solicitation outlines applicable specifications and standards, technical requirements, and contract line items for firm fixed price, cost plus fixed fee, and cost reimbursement work over a five-year ordering period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - ListofKeyPersonnel.docx | DOCX document | |
| Attachment 2 - GFP N6660423RN300_14JUN23.pdf | ||
| Exhibit A - Contract Data Requirements Listing (CDRLs).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local t ime 14 Aug 2023
X
A X B X C X D
EX
X
G F 81 - 96
97 - 116 X H 117 keri.l.gunn.civ@us.navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53 214( )
DO-C9 1 126
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N66604 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
SEE SECTION A
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KERI L GUNN 401-832-6779
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
14 - 36 37 - 39
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
40 - 43
44 - 46 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 47 - 55 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 56 - 57 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
58 - 79
PART II - CO NTRACT CLAUSES
NAVAL UNDERSEA WARFARE CTR. DIV., NPT.
KERI L. GUNN, CODE 0221
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841
(401) 832-6779
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
13 Jul 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6660423RN300
FOR OFFICIAL USE ONLY
Section SF 30 - BLOCK 14 CONTINUATION PAGE
GENERAL INFORMATION
Distribution: FILE, KR, NUWC 0121, DCMA, DFAS, COR
NUWCDIVNPT PID #: N66604-22-RFPREQ-NPT-15-0003
NUWCDIVNPT POC: Keri Gunn, Email: keri.l.gunn.civ@us.navy.mil
NOTE 1: For all clauses where no CLIN applicability is called out, that clause is applicable to all CLINs.
NOTE 2: The Government is aware of four (4) obsolete parts under CLIN 0002 (H&SG System). The affected TDPs will be updated to include replacement parts after contract award in accordance with FAR clause 52.243-1 Changes- Fixed Price. See DFARS clause 252.243-7002 Requests for Equitable Adjustment and provision C-233-H001 Documentation of Requests for Equitable Adjustment--Basic (NAVSEA) for details on equitable adjustments.
For pricing purposes, the Government hereby provides estimated prices on the existing parts as follows:
Obsolete Part
Part Number Impacted TDP Document
Find No. Qty per
H&SG
System
Estimated Price Per Unit
Notes
Power Supply
S8VK-T96024 79501089-2
DWG & PL
P46 1 $542.00 See 79501477-1 DWG & PL for Bracket Power Supply Bracket only impacts S8VK- T96024
S8VK-T48024 79501089-2
DWG & PL
P47 4 $392.00
Power Supply Bracket
79501477-1
DWG & PL
N/A 2 $10.83
Circuit Breaker
N/A 79501089-2
DWG & PL
P5-P8, P14
5 Insulation pad:
$7.92
Insulation Pad added to DWG and PL for CB1-5
Voltage Monitor
LPVRB 79501089-2
DWG & PL
P42 1 $1,500.00
W23 Cable M24643/16-
058UN
(LSTSGU-40)
79501124-X
DWG & PL
P39 1 $15,381.00 Cable is 79501124-6 mailto:keri.l.gunn.civ@us.navy.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Production Readiness Review
FFP
In accordance with the Statement of Work task 4.1 in Section C.
FOB: Destination
PSC CD: L099
NET AMT
0002 28 Each Handling & Stowage Group (H&SG) Systems
FFP
H&SG Systems in accordance with the Statement of Work in Section C.
OFFERORS SHALL FILL IN SECTION B PRICING TABLES
NOTE: The unit price/amount to be added at time of award will solely be for the purpose of establishing the ceiling of this CLIN. Prices will be established in the pricing table in Section B.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PSC CD: 3950
0003 28 Each Overboarding Fairlead Assembly
FFP
Overboarding Fairlead Assembly in accordance with the Statement of Work in Section C.
OFFEROR SHALL FILL IN SECTION B PRICING TABLES
NOTE: The unit price/amount to be added at time of award will solely be for the purpose of establishing the ceiling of this CLIN. Prices will be established in the pricing table in Section B.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0004 1 Lot Spare Parts - Parts Listed
FFP
Spare Parts in accordance with the Statement of Work in Section C.
OFFERORS SHALL FILL IN SECTION B PRICING TABLES
NOTE: The unit price/amount of $4,058,079.00 is solely for the purpose of establishing the ceiling of this CLIN. Unit prices will be established in the pricing tables in Section B.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0005 1 Lot Spare Parts - Parts Not Listed
FFP
Spare Parts in accordance with the Statement of Work in Section C.
NOTE: The unit price/amount of $1,715,427.00 is solely for the purpose of establishing the ceiling of this CLIN. Unit prices will be established via a Request for Quote (RFQ) at the order level.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0006 10 Job Engineering Services
CPFF
In accordance with the Statement of Work task 4.3 in Section C. Estimate of 18,896 labor hours.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0007 1 Lot Other Direct Cost (ODC)
COST
ODCs in support of CLIN 0006.
For the purpose of proposing, Offerors shall propose $10,552 as an estimated unburdened ODC amount and apply applicable burdens.
Offerors shall NOT apply fee or profit to ODCs.
ESTIMATED COST
0008 1 Lot
DATA
FFP
Data in accordance with Contract Data Requirements List (CDRLs), DD Form 1423, Exhibit A.
Not Separately Priced
PRICING TABLES
(a) This is an Indefinite Delivery/Indefinite Quantity contract with Firm Fixed Price, Cost Plus Fixed Fee, and Cost Provisions. The Contractor shall deliver items according to the orders issued hereunder, using the prices in the individual Contract Line Items (CLINs).
(b) The Tables below contain pricing according to each Ordering Period and Quantity Range for CLINs 0002 - 0004. The Government will determine each quantity to be purchased by issuing a delivery order. Multiple items may be purchased multiple times via individual orders.
(c) Offerors shall fill in the CLINs by stating the unit price for each item by quantity and CLIN (See Pricing Table Below).
Ordering Periods:
1 = 27 October 2023 – 26 October 2024 2 = 27 October 2024 – 26 October 2025 3 = 27 October 2025 – 26 October 2026 4 = 27 October 2026 – 26 October 2027 5 = 27 October 2027 – 26 October 2028
ORDERING PERIOD 1 – UNIT PRICES
CLINs 0002 – 0004 H&SG, FAIRLEAD and SPARES
CLIN Description P/N 1 Each 2 Each 3 Each 4 Each 5 Each 6 Each 7 Each
0002 H&SG 79501181-0 $* $* $* $* $* $* $*
0003 Fairlead 79501030-0 $* $* $* $* $* $* $*
0004AA Control Console Assy.
79500693-2 $* $* $* $* $* $* $*
0004AB Electro Optical Slip Ring
(EOSRA)
79500063-0 $* $* $* $* $* $* $*
0004AC Hagglunds Motor
79500202-0 $* $* $* $* $* $* $*
0004AD 40hp Pump 79500863-0 $* $* $* $* $* $* $* 0004AE 7.5hp Electric
Motor 79500139-0 $* $* $* $* $* $* $*
0004AF Hydraulic Pump 79500850-2 $* $* $* $* $* $* $* 0004AG Servo Drive
Assy.
79501446-0 $* $* $* $* $* $* $*
0004AH Levelwind Encoder
2NH-31641 $* $* $* $* $* $* $*
0004AJ Levelwind Motor Assy
79500346-0 $* $* $* $* $* $* $*
0004AK Power Supply 40A
39105 $* $* $* $* $* $* $*
0004AL Power Supply 20A
39106 $* $* $* $* $* $* $*
ORDERING PERIOD 2 – UNIT PRICES
0003 Fairlead 79501030-0 $* $* $* $* $* $* $*
0004AA Control Console Assy.
79500693-2 $* $* $* $* $* $* $*
0004AB Electro Optical Slip Ring
(EOSRA)
79500063-0 $* $* $* $* $* $* $*
0004AC Hagglunds Motor
79500202-0 $* $* $* $* $* $* $*
0004AD 40hp Pump 79500863-0 $* $* $* $* $* $* $* 0004AE 7.5hp Electric
Motor 79500139-0 $* $* $* $* $* $* $*
0004AF Hydraulic Pump 79500850-2 $* $* $* $* $* $* $* 0004AG Servo Drive
Assy.
79501446-0 $* $* $* $* $* $* $*
0004AH Levelwind Encoder
2NH-31641 $* $* $* $* $* $* $*
0004AJ Levelwind Motor Assy
79500346-0 $* $* $* $* $* $* $*
0004AK Power Supply 40A
39105 $* $* $* $* $* $* $*
0004AL Power Supply
ORDERING PERIOD 3 – UNIT PRICES
0003 Fairlead 79501030-0 $* $* $* $* $* $* $*
0004AA Control Console Assy.
79500693-2 $* $* $* $* $* $* $*
0004AB Electro Optical Slip Ring
(EOSRA)
79500063-0 $* $* $* $* $* $* $*
0004AC Hagglunds Motor
79500202-0 $* $* $* $* $* $* $*
0004AD 40hp Pump 79500863-0 $* $* $* $* $* $* $* 0004AE 7.5hp Electric
Motor 79500139-0 $* $* $* $* $* $* $*
0004AF Hydraulic Pump 79500850-2 $* $* $* $* $* $* $* 0004AG Servo Drive
Assy.
79501446-0 $* $* $* $* $* $* $*
0004AH Levelwind Encoder
2NH-31641 $* $* $* $* $* $* $*
0004AJ Levelwind Motor Assy
79500346-0 $* $* $* $* $* $* $*
0004AK Power Supply 40A
39105 $* $* $* $* $* $* $*
0004AL Power Supply
ORDERING PERIOD 4 – UNIT PRICES
0002 H&SG 79501181-0 $* $* $* $* $* $* $*
0003 Fairlead 79501030-0 $* $* $* $* $* $* $*
0004AA Control Console Assy.
79500693-2 $* $* $* $* $* $* $*
0004AB Electro Optical Slip Ring
(EOSRA)
79500063-0 $* $* $* $* $* $* $*
0004AC Hagglunds Motor
79500202-0 $* $* $* $* $* $* $*
0004AD 40hp Pump 79500863-0 $* $* $* $* $* $* $* 0004AE 7.5hp Electric
Motor 79500139-0 $* $* $* $* $* $* $*
0004AF Hydraulic Pump 79500850-2 $* $* $* $* $* $* $* 0004AG Servo Drive
Assy.
79501446-0 $* $* $* $* $* $* $*
0004AH Levelwind Encoder
2NH-31641 $* $* $* $* $* $* $*
0004AJ Levelwind Motor Assy
79500346-0 $* $* $* $* $* $* $*
0004AK Power Supply 40A
39105 $* $* $* $* $* $* $*
0004AL Power Supply
ORDERING PERIOD 5 – UNIT PRICES
0003 Fairlead 79501030-0 $* $* $* $* $* $* $*
0004AA Control Console Assy.
79500693-2 $* $* $* $* $* $* $*
0004AB Electro Optical Slip Ring
(EOSRA)
79500063-0 $* $* $* $* $* $* $*
0004AC Hagglunds Motor
79500202-0 $* $* $* $* $* $* $*
0004AD 40hp Pump 79500863-0 $* $* $* $* $* $* $* 0004AE 7.5hp Electric
Motor 79500139-0 $* $* $* $* $* $* $*
0004AF Hydraulic Pump 79500850-2 $* $* $* $* $* $* $* 0004AG Servo Drive
Assy.
79501446-0 $* $* $* $* $* $* $*
0004AH Levelwind Encoder
2NH-31641 $* $* $* $* $* $* $*
0004AJ Levelwind Motor Assy
79500346-0 $* $* $* $* $* $* $*
0004AK Power Supply 40A
39105 $* $* $* $* $* $* $*
0004AL Power Supply
*TO BE FILLED IN BY OFFEROR
MARK FOR INFORMATION
The Contractor shall include the following “Mark For” information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract:
Mark For Information for NUWCDIVNPT:
Receiving Officer, Naval Station Newport 47 Chandler Street Newport, RI 02841-1716 NUWC Division, Newport, Code: TBD at the delivery/task order level Contract/Order #: TBD at the delivery/task order level
CLAUSES INCORPORATED BY FULL TEXT
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;
however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
(End of text)
Applicable CLIN: 0007
B-232-H003 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be equal to * percent (* %) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost And Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable (percentage of fee payable is based on fee dollars divided by estimated cost dollars including facilities capital cost of money). Fee shall not be applied on Facilities Capital Cost of Money per FAR 15.404-4(c)(3) and DFARS 215-404-71-4. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, per the clause of this contract entitled "Limitation of Funds" (FAR 52.232-22) or "Limitation of Cost" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) per paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.
(End of Text) Applicable CLIN: 0006
* TO BE FILLED IN AT TIME OF AWARD
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Applicable CLINs: 0006 & 0007
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
(SOW)
OK-410 Handling and Stowage Group (H&SG) Procurement
1.0 Background
The Naval Sea Systems (NAVSEA) Command Program Executive Office for Integrated Warfare Systems (PEO- IWS5) is procuring AN/SQQ-89A(V)15 Anti-Submarine Warfare (ASW) Combat Systems for DDG-51 class and other ship classes. This system includes the OK-410(V)4 Handling and Stowage Group (H&SG) which is utilized to stow, deploy, and retrieve surface ship towed arrays like the Multi-Function Towed Array (MFTA). The major assemblies (units) of the H&SG are: Winch Assembly, Level-Wind Assembly, Overboarding Fairlead Assembly, Control Station Assembly, Power Distribution Panel, Maintenance Kit, Control Console Protection Assembly, Safety Rail Assemblies, and Cable Assemblies.
PEO-IWS5 has tasked the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) Sensors and SONAR Systems Department, Code 15, to execute all the procurement efforts for the H&SG. NUWCDIVNPT intends to procure OK-410(V)4 H&SG systems, spare parts, and major assemblies under this contract to support the AN/SQQ-89A(V)15 fielding plan.
1.1 Places of Performance
The primary place of performance will be at the contractor’s facility.
Travel locations will be identified in each individual delivery and task order. Travel locations may include, but are not limited to:
• Bath, ME
• Pascagoula, MS
• Marinette, WI
1.2 Authorized Users
NUWCDIVNPT Sensors and SONAR Department, Code 15.
1.3 Sponsors
• PEO-IWS; Program Executive Office for Integrated Warfare Systems
• PEO-USC; Program Executive Office for Unmanned and Small Combatants
• PEO-SHIPS; Program Executive Office for Ship Building
1.4 Types of Funding
• Operation and Maintenance, Navy (O&MN)
• Shipbuilding and Conversion, Navy (SCN)
• Other Procurement, Navy (OPN)
• Foreign Military Sales (FMS)
2.0 Scope
The contractor shall manufacture, assemble, inspect, integrate, test, package, and deliver H&SG systems and Overboarding Fairlead Assemblies for warfare systems in section 2.1. The contractor shall provide spare parts.
The contractor shall provide engineering services to address issues identified during the production of the H&SG systems and subcomponents.
2.1 Applicable Systems
2.1.1 AN/SQQ-89A(V)15
2.1.2 AN/SQQ-89(V)
2.1.3 AN/SQQ-89(V) FMS
3.0 Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with the below Applicable Documents.
NUMBER TITLE TASK
NUMBER
3.1 DoD Issuances
3.1.1 Surface Ship Undersea Warfare Combat System Configuration Management
Plan (IWS5B-12-CMP-009R6)
4.1
3.1.2 7950-301-3005 Rev.1 Drawing Tree 4.2.1, 4.3
3.1.3 Software Version Description (SVD), ODIM Drawing 7950-306-1011 4.2.1, 4.3
3.1.4 Software Design Description (SDD), ODIM Drawing 7950-306-1002 4.2.1, 4.3
3.1.5 Performance Specification for the AN/SQQ- 89A(V)15 ASW Combat System
Handling and Stowage Group for the Multi-Function Towed Array. H&SG 08- 001 Latest Revision-3, 3 June 2014
4.2.1, 4.2.2., 4.3
3.1.6 OK-410(V)4 Multi-Function Towed Array (MFTA) Electro/Optical Slip Ring Assembly (EOSRA) Test Specification. NAVSEA Drawing 7611297 Rev A
4.2.1, 4.2.2, 4.4
3.1.7 Multi-Function Towed Array (MFTA) Electro/Optical Slip Ring Assembly (EOSRA) Test Specification. NAVSEA Drawing 8293682 Rev F
4.2.1, 4.2.2, 4.4
3.1.8 ELECTRO/OPTICAL SLIP RING ASSEMBLY (EOSRA) TURNAROUND
CABLE ASSEMBLY. NAVSEA Drawing 7611303 Rev -
4.2.1, 4.3
3.1.9 BACKSHELL, EOSRA TURNAROUND CABLE. NAVSEA Drawing
7611304 Rev -
4.2.1, 4.3
3.1.10 THREADED INSERT, EOSRA TURNAROUND CABLE. NAVSEA Drawing 7611304 Rev -
4.2.1, 4.3
3.1.11 RETAINING RING, EOSRA TURNAROUND CABLE. NAVSEA Drawing 7611305 Rev -
4.2.1, 4.3
3.1.12 NUWCDIVNPT Security Manual 5540.4C, 11 December 2019 10.2
3.2 Industry Standards
3.2.1 ISO-9001-2015-STD ANSI/ISO/ASQ Q9001:2015 Quality Management
Systems Requirements Standard
4.2.1
3.2.2 IEEE/EIA Standard 12207 Information Technology - Software Life Cycle Processes (8100771-ISO12207-2017)
4.3
4.0 Technical Requirements
As specified in individual Task and Delivery Orders, the contractor shall perform the tasks in section 4.0 in accordance with Applicable Documents (ADs) in Section 3.0.
4.1 Production Readiness Review
The contractor shall conduct a Production Readiness Review (PRR) at the contractor’s facility prior to production and no later than sixty (60) calendar days after contract award.
The contractor shall address the contractor’s production readiness, knowledge of the product drawings, adequacy of resources, production planning, facilities, material procurement to include identification of long lead-time items, make-or-buy decisions, identification of alternative sources of components for parts no longer available, firmware maintenance, quality assurance, and logistics. The contractor shall demonstrate it has a configuration management plan in accordance with AD 3.1.1, a production plan, that the production schedule is compatible with the delivery requirements, and it has documented production policies and procedures.
The contractor shall establish PRR entrance criteria which shall, at a minimum, include an agenda that identifies items b thru l from the list below, integrates spares into the production plan, and the production schedule is compatible with the Government’s required delivery schedule.
The contractor shall establish PRR exit criteria that shall, at a minimum, demonstrate that manufacturing problems and areas of risk have been adequately resolved, or plans of action to correct are established, concurrence from the Government that all critical system issues have been resolved, and that the production plan is attainable at low risk.
The contractor shall notify the Contracting Officer Representative (COR) of the PRR meeting no later than thirty
(30) calendar days prior to the event occurrence. The contractor shall establish the meeting structure and the meeting agenda.
The contractor shall establish and prepare a PRR Presentation Package which shall include the following items:
a. Agenda;
b. Assessment of Entrance Criteria for PRR;
c. Overview of contractor’s production readiness including parts availability;
d. Schedule – production schedule;
e. Configuration Management Plan;
f. Factory Acceptance Testing (FAT) approach;
g. Issues – identification of any issues that require discussion and resolution;
h. Summary status of deviations; identified in the preceding paragraph, but not limited
i. Risks and Mitigation Strategies;
j. Safety Assessment and Mitigation Strategies;
k. Obsolescence Analysis and Mitigation Strategies; and
l. Assessment of Exit Criteria for PRR.
The contractor shall document, in meeting minutes, all discussions, action items and issues discussed during the
PRR.
Deliverables:
CDRL A001 - DI-ADMIN-81373: PRR Presentation Package CDRL A002 - DI-ADMIN-81249A: Agenda CDRL A003 - DI-ADMN-81250C: PRR Minutes CDRL A004 – DI-SESS-80858D: Configuration Management Plan
4.2 Production
4.2.1 Production Hardware
In accordance with the ADs in section 3.0, the contractor shall manufacture, assemble, inspect, integrate, test, package, and deliver H&SG systems, Overboarding Fairlead Assemblies, and spare parts (identified in the table below and other spare parts required to support installation and maintenance of the H&SG system and Overboarding Fairlead Assembly to be identified in individual orders). A certificate of compliance shall be provided for each H&SG system, Overboarding Fairlead Assembly, and spare part.
Spare Part Part Number Control Console Assy. 79500693-2
Electro Optical Slip Ring (EOSRA) 79500063-0 Hagglunds Motor 79500202-0
40hp Pump 79500863-0 7.5hp Electric Motor 79500139-0
Hydraulic Pump 79500850-2 Servo Drive Assy. 79501446-0
Levelwind Encoder 2NH-31641 Levelwind Motor Assy 79500346-0
Power Supply 40A 39105 Power Supply 20A 39106
Other spare parts to be identified in individual orders
TBD
Deliverables:
CDRL A005 - DI-MISC- 81356A: Certificate of Compliance H&SG systems, Overboarding Fairlead Assemblies, and spare parts.
4.2.2 Factory Acceptance Test Procedure
In accordance with ADs 3.1.5 thru 3.1.7, the contractor shall develop a FAT procedure ensuring compliance with the requirements identified in Table 4-1 of the Performance Specification, AD 3.1.5, and Multi-Function Towed Array (MFTA) Electro/Optical Slip Ring Assembly (EOSRA) Test Specifications, ADs 3.1.6 and 3.1.7.
The contractor shall include in the FAT procedure the test objectives, requirement(s) being tested, how the test method (Inspection/Test/Observation/Analysis) verifies the requirement(s) are met, resources needed to support the testing (e.g., equipment, documentation, personnel, etc.), test schedule, and test acceptance criteria. The contractor shall submit its FAT procedure for Government approval.
The contractor shall perform dry runs on each production H&SG system using the Government approved FAT procedure.
The contractor shall red line, update, and deliver the revised FAT procedure for Government approval.
Deliverable:
CDRL A006 - DI-SESS-81704: FAT Procedure
4.2.3 Test Readiness Review
The contractor shall host, present, and support a Test Readiness Review (TRR) prior to performing the FAT procedure on H&SG Systems, and shall notify the Government thirty (30) days prior to the planned event. The contractor shall demonstrate that the hardware is built in accordance with the Drawings, ADs in section 3.0, and that during dry runs, 90% of Performance Specifications, AD 3.1.5, pass prior to TRR.
The contractor shall prepare and submit a TRR Agenda for Government approval, and shall verify that all resources (e.g., equipment, documentation, and personnel) needed to support testing are available and ready for use, as outlined in the FAT procedure.
The contractor shall establish and submit TRR entrance criteria for Government approval, which shall, at a minimum, include an assessment of system requirements, manufacturing problems, an assessment and resolution of critical system issues, and manufacturing risks identified, to include obsolescence, exit criteria clearly defined, any identified problem or non-compliance reports, a complete summary of dry run test results, and the FAT schedule.
The contractor shall establish and submit TRR exit criteria for Government approval, which shall, at a minimum, include that all criteria have been met or plans of action to correct are established, critical system issues have been resolved, and any system requirement, manufacturing risk assessment or obsolescence review has been completed.
The contractor shall establish and prepare a TRR Presentation Package that shall include the following items:
b. Assessment of Entrance Criteria for TRR;
c. FAT schedule;
d. Issues – identification of any issues that require discussion and resolution;
e. Resources used for Test;
f. Summary of informal dry-run test results;
g. Plans of action for unresolved system issues; and
h. Assessment of exit criteria
The contractor shall document, in meeting minutes, all discussions, action items and issues discussed during the
TRR.
Deliverables:
CDRL A002 - DI-ADMIN-81249A: TRR Agenda CDRL A001 - DI-ADMIN-81373: TRR Presentation Package CDRL A003 - DI-ADMN-81250C: TRR Minutes
4.2.4 Factory Acceptance Test (FAT)
The contractor shall conduct FAT on all H&SG systems in accordance with the Government approved FAT Procedure. The contractor shall prepare and submit Request for Variance (RFV) for any FAT requirement that cannot be met.
The contractor shall prepare a Statement of Findings which shall include issues and problems encountered during each test, and a FAT Test/Inspection Report which shall include an overview of the test objectives, test environment, system configuration under test, documentation of calibrated test equipment, deviations for any failed requirements, and the results of each test.
Deliverables:
CDRL A007 - DI-SESS-80640E: Factory Acceptance Test (FAT) Request for Variance CDRL A008 - DI-NDTI-80809B: FAT Test/Inspection Report and Statement of Findings
4.2.5 Failure Reports
The contractor shall track and report all H&SG systems that fail FAT and Overboarding Fairlead Assemblies that fail a Quality Assurance Check in accordance with AD 3.2.1.
Deliverable:
CDRL A009 - DI-SESS-80255B: Failure Reports
4.2.6 Obsolescence Tracking
The contractor shall develop, modify, update and maintain a system for tracking and forecasting potential component obsolescence that will minimize delivery delays, cost growth and technical complexity. The system shall track the age of all Commercial-Off-The-Shelf (COTS) components; the length the component has been on the market; what updates are available; if a ‘last time to buy’ notice has been released by a supplier; and any other information necessary for tracking and forecasting potential component obsolescence.
Deliverable:
CDRL A00A – DI-MGMT-81948: Component Obsolescence Forecast
4.3 Engineering Services
The contractor shall perform technical investigations on issues identified during production to support engineering changes, and for the investigation and resolution of system level design, performance, implementation, or supportability problems. Technical investigations may be required for, but are not limited to, failures, faults, degraded performance, intermittent operational anomalies, damaged equipment, issues identified by ship’s force, insufficient operability, degraded interface capability, and component obsolescence. The results of technical investigations may be used by the contractor to determine the root cause, generate alternative solutions, and provide recommended courses of action.
The contractor shall perform tests on in-house systems and propose alternate solutions to address obsolescence or operational issues. The contractor shall evaluate alternative solutions, proposed upgrades and recommended courses of action to compare the associated risks, performance, cost, and schedule impacts and trade-offs. The Government will evaluate the proposed alternative solutions and initiate a formal Engineering Change Proposal (ECP) to implement the solution. The contractor shall implement a Government approved engineering change.
Deliverables:
CDRL A00B - DI-MISC-80508B: Technical Investigation CDRL A006 - DI-SESS-81704: Performance Specifications/Test Plans/Test Procedures CDRL A008 - DI-NDTI-80809B: Test/Inspection Report CDRL A00C - DI-CMAN-80639D: Engineering Change Proposal (ECP) CDRL A00A - DI-MGMT-81948: Component Obsolescence Forecast
4.4 Program Management
The contractor shall conduct virtual informal bi-weekly progress meetings with the Government program team members. The contractor shall provide Bi-weekly Status Meeting Presentation Package that address the following:
b. Schedule – production schedule;
c. Completed and planned efforts (e.g., production);
d. Production Plans, Production Status vs. Plan, and Production issues;
e. Obsolescence Issues and Status; and
f. Risks Management Activities.
Deliverables:
CDRL A001 - DI-ADMIN-81373: Bi-weekly Status Meeting Presentation Material CDRL A003 - DI-ADMN-81250C: Bi-weekly Status Meeting Minutes
5.0 Progress Reports
(a) For the Firm Fixed Price (FFP) tasks (4.1, 4.2, and 4.4), the Contractor shall prepare and submit a Contract Status Report that indicates the progress of work, status of the program(s), planned delivery dates for current winch and fairlead contract orders, and existing or potential problem areas for all assigned tasks. The Contractor shall also provide an Integrated Master Schedule of the progress of OK-410(V)4 manufacturing, test, and delivery.
(b) For the Cost Plus Fixed Fee (CPFF) and Cost Only task (4.3), the Contractor shall prepare a Contractor’s Status Report that indicates the progress of work, status of the program(s), and existing or potential problem areas for all assigned tasks. The Contractor shall submit the Contract Status Report for the same timeframe as each invoice submitted in the Wide Area Workflow (WAWF) Module of the Procurement Integrated Enterprise Environment (PIEE), or monthly if invoices are not submitted monthly.
Deliverables:
CDRL A00D - DI-MGMT-81991: Monthly Progress/Status Report CDRL A00E - DI-MGMT-81650: Integrated Master Schedule
6.0 RESERVED
7.0 Government Furnished Property
The Government may provide Government Furnished Property (GFP) as listed in Attachment 2. As specified in DFARS Clause 252.211-7007, the Contractor shall prepare a Government Property Inventory Report and the GFP Baseline Report via the GFP Module of the Procurement Integrated Enterprise Environment (PIEE). Upon update of the GFP Module, the Contractor shall submit the Contract Status Report indicating the GFP Module has been updated.
Deliverable:
CDRL A00F - DI-MGMT-80441D: Government Property Physical Inventory Report
8.0 RESERVED
9.0 Exception From Information and Communication Technology Accessibility Requirements
The Government has determined that this procurement is not Information and Communication Technology (ICT) (36 C.F.R. Part 1194, Appendix A).
10.0 Security Compliance
10.1 RESERVED
10.2 Program Protection (Unclassified)
Operations Security (OPSEC)
For informational purposes only: OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information.
OPERATIONS SECURITY (OPSEC): The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298, and at a minimum shall include:
1) Assignment of responsibility for OPSEC direction and implementation.
2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.
3) Establishment of OPSEC education and awareness training.
4) Provisions for management, annual review, and evaluation of OPSEC programs.
5) Flow down of OPSEC requirements to subcontractors when applicable.
While performing aboard NUWC or NUWC sites, the contractor shall: comply with all OPSEC instructions and policies detailed in the NUWCDIVNPT Security Manual, AD 3.1.12; Include OPSEC as part of its ongoing security awareness program and take all required Agency training; Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Organization and contractor in support of the mission.
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT DEFENSE
INDUSTRIAL BASE PARTNER NETWORKS (NAVSEA) (JAN 2020)
1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor’s facility. The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government’s review of the SSPs at the Contractor’s facility.
b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government. The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a
POAM.
c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor’s facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor’s site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days’ notice to the Contractor.
2. Compliance to NIST 800-171
a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 1) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b)(2), for all covered contractor information systems affecting this contract.
b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(4) Audit user privileges on at least an annual basis;
(5) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.e.
FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM); and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response
a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs/Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification.
The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.
End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .