This statement of work outlines requirements for the delivery and installation of system furniture for Building 1351 at the Naval Undersea Warfare Center Division Newport facility. The contractor shall provide all necessary materials, labor, and equipment to deliver and install systems furniture panels, sit-stand work surfaces, storage components, pedestals, and accessories in accordance with the included drawings and parts list. The furniture must match the existing Herman Miller Action Office 2 system in color, compatibility, and functionality. The contractor is responsible for warranty services, removal of unused materials, and compliance with safety and security requirements at the facility. Installation shall be completed by January 2023.

The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command seeking proposals for the delivery and installation of Herman Miller furniture and associated components at the specified Naval Undersea Warfare Center location as outlined in the statement of work.

View the file

Other files

File Type Posted
N6660423Q0444-0001_20230719.docx DOCX document
N6660423Q0444_Furniture Parts List.pdf PDF
N6660423Q0444_20230718.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SYSTEM FURNITURE For

Building 1351

NAVAL UNDERSEA WARFARE CENTER DIVISION NEWPORT

1.0 Background

The Naval Undersea Warfare Center, Division Newport (NUWCDIVNPT) Newport, Rhode Island has a requirement for delivery and installation of System Furniture for Building 1351 USB Lab.

2.0 Scope The contractor shall perform all tasking in accordance with the Statement of Work, Furniture Parts List, and Furniture Drawings 22-002A.

3.0 New Furniture System

The contractor shall provide all the necessary materials, labor, and equipment to provide systems furniture panels and sit-stand work surfaces in accordance with the drawings. The contractor shall be responsible for providing all components and attachment pieces for the complete assembly of the systems furniture. All accessory equipment shall be provided as shown on the layout. The contractor is responsible for accurately providing the quantity of each component as indicated. This procurement is for the purchase, delivery and installation of the furniture. All material must be handled by the contractor, brought to the sight, and installed. The installation is for B-1351 first floor, USB Lab, which is an entry floor level area.

3.1 General Requirements

The contractor shall submit sufficient product data to substantiate that the proposed systems furniture is compatible with the Herman Miller Action Office 2 System and fabric and color samples must match the existing furniture in storage. All Partition widths and heights indicated on the drawings shall be matched as shown on the drawing.

It is recommended to field verify all required building dimensions prior to manufacturing any components.

Note: Contractor is responsible for all labor, materials, equipment, shipping and offloading of the product to perform the work identified above. The Government will not loan personnel or equipment for the offloading of the product. The contractor is also responsible for cleanup of the area including disposal of shipping cardboard/containers and all packing material. The Contractor may bring these items to the Government recycling area on base and place the materials in the proper containers; i.e. cardboard, wood, metal etc.

The contractor shall provide all other miscellaneous and incidental work as required for a complete functioning assembly as indicated on the attached drawing.

The Furniture System shall meet all requirements of UL 1286 “Standard for Safety Office Furnishings”.

3.1.1 PRODUCT REQUIREMENTS

All panels and components shall be equal to and compatible with Herman Miller Action Office System series 2 walls. Herman Miller AO2 system is already installed within the first phase of the floor and this phase needs to match existing in kind, color, and attachment capability. All panels and components shall be fully compatible and interoperable with the Herman Miller Action Office System. Action Office two is installed in multiple buildings throughout the base and the product must match for ease of future configuration changes.

3.1.2 WALL PANELS

The contractor shall provide wall panels that meet the following requirements:

All wall panels shall be fabric covered acoustical panels. Fabric shall be similar to Herman Miller Category 1, Crossing, color Shale. Panels shall have cable management side covers and adjustable glides. All panels shall have a Noise Reduction Coefficient of 0.65 or better. All panels are to be UL listed and have a Class A fire-retardant rating. All panels shall have a factory installed electrical harness that distributes double-sided, 4-circuit power within a cable management raceway. Electrical components shall be UL listed. All panels greater than 18” wide shall have 4-circuit power with capability of having two electrical receptacles per side and the cable/energy barrier. Panels shall be height as determine in drawing package and parts list, width of panels shall be 12”, 18”, 24”, 30”, 36”, 48”, as shown on the drawings. Trim shall be color – Inner Tone Light. Base and cable management trim color will be inner tone light to match existing. Wall panels shall be connected to each other with the appropriate draw rods, 90-degree connectors, and 3-way connectors as shown on the drawing and required for a satisfactory installation; all connectors shall be compatible with cable management raceway and shall be of the inner tone light color. All exposed panel ends shall be covered with end caps or transition pieces in the case of height transitions. All receptacles provided shall be the same color as the cable management trim color, inner tone light to match existing.

3.1.3 WORK SURFACES

The contractor shall provide work surfaces that meet the following requirements:

Work surfaces shall have a laminate top and a vinyl edge, color shall be inner tone light to match existing. All work surfaces shall come with attachment hardware. Work surfaces shall be fully supported by wall panels, however pedestals may be used as supplemental support in addition to the wall panels wherever possible. Abutting work surfaces shall mate closely and be at equal heights when used in side-by-side configurations in order to provide a continuous and level work surface. Work surfaces shall have pre-drilled holes to accommodate storage components, pedestals and additional supports.

3.1.4 Rectangular Work Surfaces

Rectangular work surfaces shall have a square edge. All rectangular work surfaces shall be 24” deep and shall be 36”, 48”, 60”, 78”, etc. long as specified on the drawings and shall be inner tone light with trim edge inner tone light.

3.1.5 Corner Work Surfaces

Corner work surfaces if required shall be 24” deep and 36” wide and fit into a 90-degree corner. All corner work surfaces shall come with a cable access hole. In areas where two rectangular work surfaces meet in each cube one corner wedge shall be provided where the individual will be sitting to use the computer.

3.1.6 STORAGE COMPONENTS

3.1.6.1 Flipper Door Units

Flipper door units shall match Herman Miller Action Office B-Style flipper door units in quality, appearance, and operation. Flipper door units shall be fully supported by wall panels. The underside of the unit shall be setup to accept a task light. Flipper doors shall have a fabric-covered front. Fabric selected by the Government is to match the Crossings – Shale color. Attachment hardware shall be included. All flipper door units shall be 13” deep, 15-1/2” high and 60”, 48”, 36”, 30” wide as specified on the drawings. All flipper draw units shall be lockable and come equipped with keys. Keys shall be key-alike with all other lockable office components within each individual office station.

3.1.6.2 Lateral Files

Lateral files shall match Herman Miller Action Office B-Style Suspended Lateral Files in quality, appearance, and operation. Lateral files shall be fully supported by wall panels or wall starters. Lateral files shall accommodate Letter, Legal, or A4 size hanging files. Lateral files shall have a laminate front, color to be inner tone light to match the existing materials in storage. Attachment hardware shall be included. All lateral files shall be 16” deep and 48” or 36” wide as specified on the drawings. All lateral file draw units shall be lockable and come equipped with keys. The Government will specify key-alike or separate. Lateral files within offices shall be keyed alike in the office.

3.1.7 Pedestals

Pedestals shall be equivalent to Herman Miller 160 Series Standard-Pull Pedestal. Pedestals shall be of the mobile type with an integral top. Pedestals shall be of the File/File 2 Drawer Type or the Box/Box/File 3 Drawer Type as specified on the drawings or material list. All pedestals shall be 24” deep and lockable, color to be inner tone light to match the existing. They shall be keyed alike with the other lockable laterals and flippers within each office set-up.

3.1.8 Pencil Drawers

Pencil drawers shall be similar to Herman Miller G5010 and shall mount under the work surface in the locations specified on the drawing using the predrilled holes in the work surface. The Government shall provide the pencil drawers for installation per cube. Color to be inner tone light.

3.1.9 ACCESSORIES

3.1.9.1 Tack Boards

Tack boards shall attach to panels walls with included hardware. Tack boards if required shall have a fabric surface. Fabric shall be from fabric category 1. Tack boards shall be nominal 16” high and 60”, 48”, 36” high as specified on the drawing or material list. Government will select the color.

3.1.9.2 Coat Hooks

Coat hooks shall be similar to Herman Miller AO535, and shall fit over the top of the wall panel for hanging coats, hats and umbrellas. One each shall be provided per work station.

3.1.9.3 Receptacles

Each office shall have three duplex receptacles. The receptacles shall be alternately connected to circuit A and Dedicated Circuit D. Each circuit shall be rated 20 amp, 1 PH service; shared neutral will not be utilized by the Government. Color shall match trim, inner tone light.

4.0 Site Specific Requirements for Naval Undersea Warfare Center

A. Building 1351. Occupants may be within the building during construction of the Furniture System. However, the location of the wall are located out of the way of foot traffic. The contractor shall not disturb employees in this area when working.

B. Work shall be conducted to cause the least possible disturbance to the building occupants. To the greatest extent possible, the contractor shall not leave tools and materials in the paths of travel/emergency egress routes.

C. Vehicle Access to NUWCDIVNPT: Vehicle Passes are obtained at Building 80 Security. All vehicles are required to enter into the Naval Undersea Warfare Center via main Gate 23, which is adjacent to Bldg 80. All vehicles are subject to search.

D. The contractor shall ensure that Contractor personnel employed at the Activity become familiar with and obey Activity regulations. Keep within the limits of the work and avenues of ingress and egress. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.

E. A list of all employees to be engaged in the performance of this work shall be furnished to the Security Department. The Security Department will approve or disapprove of the individuals on the list based on current security regulations. In the event additional employees are hired for this project or employees are discharged from the project, a corrected list of employees shall be furnished, reflecting the change in personnel. Identification badges for the Contractor and his employees shall be furnished by the Security Department at no charge and are required to be worn at all times while at the Naval Undersea Warfare Center. Immediately report instances of lost or stolen badges to the Security Department. Upon completion of the contract and/or termination of the service of any employee, the Contractor shall return the badges to the Security Badging Office. Compliance with this requirement is mandatory and certification thereof to the Contracting Office is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment. Please note that foreign nationals are not allowed on the Naval Undersea Warfare Center campus.

F. Base access

Two-step process:

A visit request is required to visit NUWC. The preferred method is JPAS. If the company does not have JPAS, then they must fax or email a visit request with the information required in the visit request form. You may also use AMRDEC SAFE to submit your visitor request (https://safe.amrdec.army.mil/SAFE/). Incomplete visit requests will be rejected. There is a minimum of 15 business days to process.

Note: If born outside the U.S., you must provide a Naturalization number or Passport number. All visitors accessing NUWCDIVNPT are required to be U.S. or Naturalized Citizens.

Naval Station requires one of the following in order to enter the base, along with your NUWC visitor badge:

(a) CAC card

(b) DBIDS card

(c) Retired Military ID

To obtain a DBIDS card, a vetting spreadsheet is required and can be acquired from Naval Station Newport to conduct the vetting. You will need a DBIDS card if you do not have the other required IDs. The spreadsheet should be submitted to Visitor Control (group email is nuwc_npt_access.fct@navy.mil).

The other option is to use AMRDEC SAFE (https://safe.amrdec.army.mil/SAFE/). It is certified to protect Privacy Act information. You must use our individual emails (Deanna.l.monell.civ@us.navy.mil; or gina.m.santos2.civ@us.navy.mil). DBIDS requests are consolidated and submitted each day. Naval Station will not accept DBIDS vetting spreadsheets directly from the companies requiring vetting.

Naval Station requires 7-15 days to process a vetting spreadsheet. This 7 to 15 day period does not include the day of submission, nor does it include weekends and holidays. The results, except for denials, are not returned. If it has been more than five days excluding day of submission and weekends/holidays, and there has been no response, then vetting has been approved.

In addition, visitors must stop at B-80 and get their NUWC visitor pass before going to Naval Station Gate 1 to get a DBIDS card. Visitors must not try to enter NUWC with only their visitor pass and no DBIDS (or CAC) as the gate guard will confiscate their NUWC visitor pass and you will be turned around at the gate.

Please keep in mind, DBIDs is only good for 179 days. The company must resubmit their DBIDS vetting spreadsheet every 170 days in order to stay active with their DBIDS card. The 170 days is requested so that the vetting can be sent and cleared before the 179-day expiration. If DBIDS isn't sent every 170 days, when the 179-day period expires, they will be denied access to the base and will have to wait 5 business days in order for their vetting to clear again. DBIDS is separate from the visitor request.

If you have any questions on the DBIDS portion, please contact NAVSTA Pass & ID Office at (401)841-3126.

If you have questions on the visitor request portion, please contact NUWC Visitor Control at (401)832-2152.

G. The contractor shall park vehicles where directed by the government.

5.0 Submittals N/A 6.0 Warranty The contractor shall provide warranty services for all new items provided and installed for one (1) year following acceptance by the Government. Warranty period begins at final system acceptance. If there is a failure of the system, the contractor shall respond within 48 hours of notification. See paragraph entitled “Closeout Procedures” for additional information regarding warranties.

7.0 Place of Performance

Naval Undersea Warfare Center, Newport, Rhode Island

8.0 Radio Transmitter Restrictions The contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment as directed. The contractor shall not use transmitters without prior approval from the Explosive Safety Officer.

9.0 Working Hours and Utility Cutovers Regular working hours shall consist of a period between 7 A.M. and 5 P.M., Monday through Friday, excluding Government holidays.

Work outside regular working hours requires Government approval. Provide a written request 7 days in advance of any such work for approval purposes and for arrangements to be made relative to inspection services, should the request be granted.

10.0 Safety The contractor is responsible for the safety of his personnel and the safety of NUWC personnel during the course of this project. The contractor shall comply with the most recent Army Corps of Engineers COE-EM-385-1-1 Safety and Health Requirements Manual for all aspects of this project.

11.0 Closeout Procedures Prior to receiving final payment, the contractor shall be responsible for the following at the completion of the project:

· The provision of Warranty Information including the warranty duration, the actual date of warranty expiration, warranty contact information, and any items that have an extended warranty beyond the standard one year.

· The contractor will be required to remove all unused materials from the site