B1170 Flooring RFI 0002.pdf

PDF 393 KB Posted

Attached to
Construction - Asbestos flooring removal and replacement Federal contract opportunity
Solicitation number
N6660423Q0212
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Asbestos flooring removal and replacement, newest first.
File Type Posted
II. H. RI Wage Determination 03_17_2023.pdf PDF
II. H. N6660423Q0212 Amendment 0001.pdf PDF
B1170 Flooring RFI 0001.pdf PDF
N6660423Q0212.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 0002 N6660423Q0212

1. Can you advise if the CIH abatement design and monitoring is needed for this project or do you already have a consultant?

A = CIH abatement design and monitoring is needed. Government will not provide third party consultant.

2. Please confirm that on the Revised Drawings, (March 31, 2023), that EXISTING FLOOR DEMOLITION PLAN represents no flooring has to be removed.

A = Flooring to be removed (except in RM 182, flooring already removed)

3. Is the opening shown between C16 and 180 a simple pass-through or is there a hinged door?

Please specify the floor transition required there.

A = hinged door, no transition needed.

4. EXISTING FLOOR DEMOLITION PLAN shows an opening between 180 and 182. On NEW FLOORING PLAN this opening appears to disappear. Please clarify.

A = AutoCAD hatching might be making it look that way, Nothing “disappeared”. There is an door opening between the rooms.