B1170 Flooring RFI 0002.pdf
PDF 393 KB Posted
- Attached to
- Construction - Asbestos flooring removal and replacement Federal contract opportunity
- Solicitation number
- N6660423Q0212
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| II. H. RI Wage Determination 03_17_2023.pdf | ||
| II. H. N6660423Q0212 Amendment 0001.pdf | ||
| B1170 Flooring RFI 0001.pdf | ||
| N6660423Q0212.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 0002 N6660423Q0212
1. Can you advise if the CIH abatement design and monitoring is needed for this project or do you already have a consultant?
A = CIH abatement design and monitoring is needed. Government will not provide third party consultant.
2. Please confirm that on the Revised Drawings, (March 31, 2023), that EXISTING FLOOR DEMOLITION PLAN represents no flooring has to be removed.
A = Flooring to be removed (except in RM 182, flooring already removed)
3. Is the opening shown between C16 and 180 a simple pass-through or is there a hinged door?
Please specify the floor transition required there.
A = hinged door, no transition needed.
4. EXISTING FLOOR DEMOLITION PLAN shows an opening between 180 and 182. On NEW FLOORING PLAN this opening appears to disappear. Please clarify.
A = AutoCAD hatching might be making it look that way, Nothing “disappeared”. There is an door opening between the rooms.