II. I. Amendment 0001_2022-04-06_RFQ N66604-22-Q-0228.pdf
PDF 141 KB Posted
- Solicitation number
- N66604-22-Q-0228
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300983179 W2021-196-01
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Section A: Extend due date to 2:00 PM ET Friday 22 Apr 2022.
Section I: Add clause 52.204-2 Alt II Security Requirements (incorporated by reference).
Section J: Provide updated Wage Determination RI20220001 Mod 4 dated 1 Apr 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660422Q0228
X 9B. DATED (SEE ITEM 11)
23-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Apr-2022
CODE
NAVAL UNDERSEA WARFARE CENTER
JOSEPH SCARPA, CODE 0222, 401-832-1499,
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6660422Q0228
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time 22-Apr-2022 02:00 PM has been added.
The required performance has changed from FAR 36.204 Disclosure of the magnitude of construction project:- Physical characteristics: Selected demolition and office renovations- Estimated price is between $25,000 and $100,000.Site Visit: 9:00 AM ET Thursday 31 Mar 2022. Register separately with both the NUWC Security and NUWC Contracts Departments.See Sections A and J.Email questions to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.milQuotes due: Thursday 14 Apr 2022 before 2:00 pm ET. Email to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil100% Small Business Set-Aside:
NAICS 236220 - Commercial and Institutional Building Construction; Size Standard $39,500,000.00.Technical information required with proposal. See Sections L and M.Method of Payment: Government Purchase Card.Payment Bond required. Performance Bond not required. Bid Bond not required. to FAR 36.204 Disclosure of the magnitude of construction project:- Physical characteristics: Selected demolition and office renovations- Estimated price is between $25,000 and $100,000.Site Visit: 9:00 AM ET Thursday 31 Mar 2022. Register separately with both the NUWC Security and NUWC Contracts Departments.See Sections A and J.Email questions to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.milQuotes due: Friday 22 Apr 2022 before 2:00 pm ET. Email to joseph.scarpa6.civ@us.navy.mil and michael.h.broomfield.civ@us.navy.mil100% Small Business Set-Aside: NAICS 236220 - Commercial and Institutional Building Construction; Size Standard $39,500,000.00.Technical information required with proposal. See Sections L and M.Method of Payment:
Government Purchase Card.Payment Bond required. Performance Bond not required. Bid Bond not required..
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.204-2 Alt II Security Requirements (MAR 2021) - Alternate II APR 1984
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Determination
RI20220001 Mod 3
13 25-FEB-2022
Attachment 10 Mask Guidance for All DoD Installations
1 28-JUL-2021
Attachment 11 DoD Guidance for COVID-19 Vaccination
28 20-DEC-2021
Attachment 12 DD Form 3150 Vaccination Certification
Attachment 13 COVID-19 Questionnaire 1 10-FEB-2022 Attachment 14 Indication of Interest
Optional
Attachment 2 Specification B1170 R180 Renovation
Attachment 3 Submittal Register B1170 R180 Renovation
Attachment 4 Limited Directed Asbestos and Lead-in- Paint Sampling Report
10 22-DEC-2021
Attachment 5 Drawing Set 21-029A 7 20-JAN-2022 Attachment 6 List of Key Personnel
(Fill-in by Offeror)
Attachment 7 Visitor Request Instructions and Information Needed
Attachment 8 SECNAV Form 5512 Base Access Pass
Attachment 9 Use of Masks and Other Public Health Measures
2 04-FEB-2021
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Determination
RI20220001 Mod 4
13 01-APR-2022
Attachment 10 Mask Guidance for All DoD Installations
1 28-JUL-2021
Attachment 11 DoD Guidance for COVID-19 Vaccination
28 20-DEC-2021
Attachment 12 DD Form 3150 Vaccination Certification
Attachment 13 COVID-19 Questionnaire 1 10-FEB-2022 Attachment 14 Indication of Interest
Optional
Attachment 2 Specification B1170 R180 Renovation
Attachment 3 Submittal Register B1170 R180 Renovation
Attachment 4 Limited Directed Asbestos and Lead-in- Paint Sampling Report
10 22-DEC-2021
Attachment 5 Drawing Set 21-029A 7 20-JAN-2022 Attachment 6 List of Key Personnel
(Fill-in by Offeror)
Attachment 7 Visitor Request Instructions and Information Needed
Attachment 8 SECNAV Form 5512 Base Access Pass
Attachment 9 Use of Masks and Other Public Health Measures
2 04-FEB-2021
(End of Summary of Changes)