Performance Requirements Summary Table

View the file

Other files for this federal contract opportunity

Other files attached to SVTT Project Support, newest first.
File Type Posted
Solicitation_N66604-18-Q-2922.pdf PDF
Attachment_3_N66604-18-Q-2922_GovernmentFurnishedProperty.pdf PDF
Exhibit_A_N66604-18-Q-2922_CDRLs_with_Addendum.pdf PDF
Attachment_1_N66604-18-Q-2922_DD_Form_254.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Requirements Summary Table PR 1300720667

Requirement / Paragraph No.

CDRL

(if applicable) Performance Objective Performance Standard

Acceptable Quality Level

(AQL)

Monitoring Method

4.1.1 - 4.2.7 Launcher Overhaul (A001: DI-NDTI-80809B)

(A002: DI-MISC-80508B)

(A003: DI-MISC-81356A)

In accordance with equipment identified in Paragraph 2.0, the contractor shall conduct the overhaul and conversion of SVTT MK 32 MOD 15 launchers for the US Navy new-construction ships. In the performance of this task, the contractor shall disassemble, test and evaluate a set of used SVTT MK 32 launchers. The contractor shall provide an inspection report that details the condition of the components, as well as provide recommendations for overhaul or replacement. The contractor shall also deliver any resultant systems engineering documentation, such as Requests for Variance and Engineering Change Proposals. Upon Government approval of the recommendations and other technical documentation (if any), the contractor shall refurbish, test and inspect all launcher components IAW Applicable Documents 3.1 through 3.4, 3.6 and 3.7. The contractor shall generate objective quality evidence (OQE) documents that contain all recorded, “as-built” measurements outside process certifications (e.g., coatings, heat treatment); and testing certifications (e.g., load tests, proof tests). The contractor shall deliver OQE documentation and material Certificates of Compliance upon the delivery of the hardware.

Hardware Deliverables: The contractor shall deliver hardware IAW DD Form 250.

Launcher tests, reports, recommendations, and documentation are accurate and delivered in accordance with agreed upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

(A004: DI-MGMT-81991)

For all assigned tasks, the contractor shall prepare a Contractor’s Status Report that indicates the progress of work, status of the program(s), and existing or potential problem areas. The contractor shall submit the Contract Status Report for the same timeframe as each invoice submitted in the Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) module of Wide Area Work Flow (WAWF).

Contractors Status Report is technically accurate and provided in accordance with agree upon schedules.

Standard is met 90% of the time.

Government review of deliverable documents.

Feedback from NUWC customer.

4.0 REQUIREMENTS

5.0 PROGRESS REPORTS