A1.5 PWS.docx
DOCX document 32 KB Posted
- Attached to
- SERVICE REQUIREMENT TO INSTALL CONDUIT
- Solicitation number
- N66001-19-Q-8774
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1.5 PRICING TABLE-QUOTE REQUEST.xlsx | XLSX spreadsheet | |
| C1.5 COMBINED SYNOPSIS AND SOL SERVICES.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 FEBURARY 2019
PERFORMANCE WORK STATEMENT
9TH MISSION SUPPORT COMMAND (9TH MSC) SAIPAN ELECTRONIC SECURITY SYSTEM (ESS) INSTALLATION
1.0 SCOPE
1.1 This is a non-severable service acquisition for installation support of ESS conduit for Building F & G, 9th Mission Support Command (9th MSC), Garapan, Saipan.
2.0 APPLICABLE DOCUMENTS
2.1 National Fire Protection Association 70, National Electric Code, latest approved version
2.2 Federal OSHA Construction Regulation for Fall Protection, OSHA 1926.500-503, subpart M
2.3 General Industry Fall Protection in Regards to Fall Arrest Systems, OSHA 1910.66 Appendix C
2.4 Installation Design Plan (IDP) - 9th MSC Saipan ESS Installation project, TN: 18-4727
3.0 TECHNICAL REQUIREMENTS
3.1 The contractor shall provide conduit and electrical installation support for building F & G, for the 9th MSC Saipan ESS Installation Project, in accordance with guidance outlined in the applicable documents identified in paragraphs 2.1 through 2.4.
3.1.1 The contractor shall install approximately 500 feet of ½ inch EMT conduit and approximately 500 feet of 1-inch EMT conduit. Flex conduit may be used in lieu of EMT but should be kept to a minimum.
3.1.2 All conduit fittings shall be compression type.
3.1.3 The contractor shall install required junction boxes as necessary. Junction boxes shall be NEMA1 rated or higher for interior locations and NEMA4 rated or higher for exterior locations. Junction boxes include 4”x4”x2”, 4”x4”x4”, 6”x6”x6”, and 12”x12”x4”. Refer to IDP identified in paragraph 2.4.
3.1.4 To the maximum extent possible, all conduit shall be installed above the false ceiling and within walls. Surface mounted conduit may be used when concealing is not possible.
3.1.5 The contractor shall core drill from interior to exterior of building at approx. seven (7) locations.
3.1.6 After conduit installation, 5ft of pull string shall be left in conduit at each end location to facilitate pulling of wires required for device and equipment installation.
3.2 Contractor shall install circuit breakers and electrical outlets to support ESS equipment at the following locations in building F & G from the power panel located in room 114, in accordance with guidance outlined in the applicable documents identified in paragraphs 2.1 through 2.4.
3.2.1 Outlet #1 – Room 104
3.2.2 Outlet #2 – Room 105
3.2.3 Outlet #3 – Room 201
3.3 Contractor shall install conduit to support ESS equipment at the following door locations in building F & G, in accordance with guidance outlined in the applicable documents identified in paragraphs 2.1 through 2.4.
3.3.1 Door #1 – Front Entrance
3.3.2 Door #2 – Rear Entrance
3.3.3 Door #3 – Building G Front Entrance
3.3.4 Door #4 – Building G Front Rollup Door
3.3.5 Door #5 – Building G Side Entrance
3.3.6 Door #6 – Building G Rear Rollup Door
3.3.7 Door #7 – Building F Front Entrance
3.3.8 Door #8 – Building F Side Entrance
3.3.9 Door #9 – Building F Rear Entrance
3.3.10 Door #10 – Telcom Room 104
3.3.11 Door #11 – Badge Office Room 106
3.4 Contractor shall provide technicians qualified for tasking.
3.5 Contractor shall pull and label wire to support electrical outlets, in accordance with guidance outlined in the applicable documents identified in paragraphs 2.1 through 2.4.
3.6 Contractor shall install conduit to support ESS equipment, in accordance with guidance outlined in the applicable documents identified in paragraphs 2.1 through 2.4.
3.7 Contractor shall provide their own vehicles with proper base access.
3.8 Contractor shall provide their own hand tools for installation such as screwdrivers, pliers, wire strippers, digital multi-meter, conduit bender, level, etc. required to complete tasking.
3.9 Contractor shall provide their own power tools and accessories such as a drill and drill bits required to complete tasking.
4.0 CONTRACTOR ACQUIRED MATERIAL
4.1 Contractor shall furnish all conduit, equipment, related accessories, junction boxes, receptables, consumables, and all other miscellaneous materials required to perform the tasks described in Section 3.0
5.0 TRAVEL
5.1 Travel will be required to Garapan, Saipan.
6.0 SECURITY
6.1 The work to be performed under this effort is anticipated to be unclassified.
6.2 Contractor shall be escorted to the classified area to perform work by Government personnel .As required by National Industrial Security Program Operating Manual (NISPOM) Chapter 1, Section 3, contractors are required to report certain events that have an impact on: 1) the status of the facility clearance (FCL); 2) the status of an employee's personnel clearance (PCL); 3) the proper safeguarding of classified information; 4) or an indication that classified information has been lost or compromised. Contractors working under SSC Pacific contracts will ensure information pertaining to assigned contractor personnel are reported to the Contracting Officer Representative (COR)/Technical Point of Contact (TPOC), the Contracting Specialist, and the Security's COR in addition to notifying appropriate agencies such as Cognizant Security Agency (CSA), Cognizant Security Office (CSO), or Department Of Defense Central Adjudication Facility (DODCAF) when that information relates to the denial, suspension, or revocation of a security clearance of any assigned personnel; any adverse information on an assigned employee's continued suitability for continued access to classified access; any instance of loss or compromise, or suspected loss or compromise, of classified information; actual, probable or possible espionage, sabotage, or subversive information; or any other circumstances of a security nature that would affect the contractor's operation while working under SSC Pacific contracts.
7.0 PERIOD AND PLACE OF PERFORMANCE
7.1 The period of performance shall be date of award through 4 months thereafter.
7.2 The place of performance for this project shall be at 9th MSC Building F & G, Garapan, Saipan.
8.0 ACCEPTABLE QUALITY LEVEL
8.1 The contractor shall submit the final product for inspection to the Government representative. The Government representative shall deem the quality of the product acceptable or unacceptable based on the requirements established in this PWS and the terms and conditions of the contract. If unacceptable the Government shall provide feedback on corrective action required to bring the item up to specification as required by documents identified in paragraphs 2.1 through 2.4.
9.0 METHOD OF SURVEILLANCE
9.1 The Government representative will do onsite spot checks during the installation.
10.0 DELIVERABLES
10.1 Contractor shall maintain a set of daily updated "redlined" installation drawings on-site for the duration of the installation. Contractor shall provide one set of "redlined" markups of the IDP drawings to site during Out-Brief. Red-lines provided to the site may be a hand edited hard copy, but must be legible and reflect all authorized changes to the original IDPs. Provide scanned electronic copy of the "redlined" markups of the IDP drawings to the Project Engineer in Adobe Acrobat Format (PDF) within 15 days after the completion of the Physical On-site Production work.
11.0 TECHNICAL POINT OF CONTACT
11.1 Brandon Braithwaite-Ahuna
| donaldbrandon.braith@navy.mil |
| (808) 474-4193 |
11.2 Ely Addington
| elda.addington@.navy.mil |
| (808) 471-1129 |
File details come from the government source that posted it.