SOW NESP ROLL TOWER.pdf
PDF 70 KB Posted
- Attached to
- NESP Roll Tower Maintenance
- Solicitation number
- N66001-19-Q-6855
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR THE NESP ROLL TOWER
Contractor will provide the following monthly maintenance support services.
• Hydraulic Power Unit Filters to be removed and replaced once per month.
• Perform an oil analysis once per month.
• Be present for hydraulic system testing once per month if requested.
• Hydraulic Filter Cart Filters to be removed and replaced bi-monthly.
• Monitor and add hydraulic oil to the system as needed bi-monthly.
• Keep a 5 gallon pale of hydraulic oil on site to be used as needed.
• Repair hydraulic oil leaks from hoses, fittings, tubing and components as needed
• Perform troubleshooting of hydraulic system as needed.
• Perform minor repairs to hydraulic system components as needed
• Clean up any residual oil, and remove from site during bi-monthly inspection
Repair or replacement of the following major components is not included in this maintenance service to include Electric Motor, Hydraulic Pump, Hydraulic Reservoir, Servo Valve, Hydraulic Rotary Actuators, Weight Cylinder and Solenoid Valves. Also, system design changes, major re-plumbing, massive oil spill clean-up and repair of catastrophic hydraulic system failure are not covered.
File details come from the government source that posted it.