JUSTIFICATION FOR NON-COMPETITIVE PROCUREMENT (JNCP)

FOR ACTIONS< THE SIMPLIFIED ACQillSTION THRESHOLD

PR/Solicitation Number: 1300715195 Code: 53222

I) Agency, Contracting Activity and Purpose: SP AW AR Systems Center, Pacific, Code 22220, Justification for Other than Full and Open Competition.

2) Description of the Supply or Service being procured, its intended use and anticipated/estimated value (Answer the Following Questions):

a. Describe the product or service you want purchased (provide make, model, and product serial number/part number-include a spreadsheet if necessary)

Quantity Unit Item/Part# Description Unit Price Ext Price

2 EA #2 225A Circuit Breaker

40 LF #2 Po\ver Track Busway 225A 4P 4W

2 EA #2 Power Track Busway End Box

2 EA Power Track Busway Cable Tap Box 225A

120 LF #2 Power Track Busway All-thread (120 linear feet)

1 BX #2 Power Track Busway Couplings (box)

1 BX #2 Power Track Busway Nuts (box)

1 BX #2 Power Track Busway Washers (box)

40 LF #2 Power Track Busway Strut (40 linear feel)

4 EA #2a 20A lP Circuit Breaker/L5-20R 1 O' Drop Cord

6 EA #2b 20A Dual IP Circuit Breaker/L5-20R 1 O' Drop Cord

12 EA #2c 20A JP Circuit Breaker/L6-30R 10' Drop Cord

3 EA #2d 30A 1 P Circuit Breaker/L5-30R 10' Drop Cord

9 EA #2e 30A 1 P Circuit Breaker/L6-30R 10' Drop Cord

8 CLF #3 225A Feeder Circuits 4/0 CP Wire

I CLF #3 Feeder Circuit #2 CP Wire

IO EA #3 Feeder Circuit Cable Terms

160 LF #3 Feeder 2 112" EMT Cond.

4 EA #3 Feeder 2 112" 90 Deg EL

6 EA #3 Feeder 2 1/2" llox Conn.

20 EA #3 Feeder 2 1/2" Comp. Coup

30 FT #3 Feeder Strut

16 EA #3 Feeder 2 1/2" Clamps

I c #3 Feeder 3/8" Flat Washers (carton)

40 EA #3 Feeder 3/8" Lag Screws

160 FT #3 Paint, Red

1 LOT NIA Delivery

I LOT #3 Equipn1ent; Testing & Labeling

10 D NIA Equipn1cnt; 3/.i Ton Service-Bed

1 D NIA Equipn1cnt; Flatbed

8 HR NIA Equipment; Flatbed Operating Cost

MATERIAL

LABOR

I Template July 2018

(b)(4)

EQUIPMENT/CONSTRUCTION AIDS

SUBTOTAL

TOTAL $91,095.00

b. What is its intended use or purpose?

The material and services being procured ·will be used to augment and extend an existing Star Line Track Busway system that is installed in SSC PAC Building 642.

c. What is the total estimated cost of this/these products or services?

$91, 095. 00 (estimate is based on a proposal/quotation received from Power Pro Plus, a small business, electrical contractor that pe1formed a similar installation at SSC PAC in 2017).

3) Possible Authority for Non-Competitive Procurement (If you check block 3a.

below, complete associated table marked 3(a), If you check block3(b) below, complete associated table marked 3(b):

a. D Sole/Limited Source Procurement (Only One Responsible/Capable Source). Is there only one responsible/capable source that can provide the supply or service due to unique/highly specialized requirements, urgency, exclusive licensing agreements, industrial mobilization or the new work is a logical follow-on? Non-competitive procedures can typically only be used when there is one source able to meet the Government's minimum requirements (e.g., the manufacturer is the sole distributor/reseller of the product or service). If only one source can meet the Government's requirements, complete table 3(a) below and provide a complete and thorough discussion of how you are aware that only one source exists in paragraph 4 below.

b. l2SI Brand Name Requirement (Item Peculiar to One Manufacturer). Is the requirement peculiar to a single brand name or one manufacturer? Competition can be limited to companies that are capable of providing the specific brand name, product or feature required when it is essential to purchase a specific brand because it is the ONLY brand that has the ability to meet the Government's minimum requirements (e.g., while there is one manufacturer, multiple distributors/resellers exist for the product or service). If so complete Table 3(b) below.

TABLES- Complete the Table which corresponds to the answer vou provided above.

2 Template July 2018

(b)(4)

TABLE 3(a)-ONLY ONE RESPONSIBLE/CAPABLE SOURCE (Item or Service can ONLY be procured from One Source/Company/Contractor and NO other source.)

State any alternatives available What makes these critical or considered)' as a means of

List the critical characteristics characteristics/ specifications/ fulfilling this requirement and or capabilities necessary to meet capabilities unique to this why they aren't viable; and

No. the "Government's Minimu1n product/service and vendor? what would be the impact if a

Requirements" Why is each identified critical product was purchased from characteristic required? another vendor or without each characteristic listed.

TABLE 3(b)-BRAND NAME REQUIREMENT (Item or Service MUST be a specific brand, make, or model; however, it may be purchased from multiple vendors.)

List the critical characteristics What makes these critical or capabilities necessary to meet characteristics/ specifications/

What is the impact if a the "Gove1nment's Minimu111 capabilities unique to specific similar/nearly equal product

No. Requirements"; specific Brand/Manufacturer? Why is produced by another each identified critical attribute(s) of this product not characteristic required?

1nanufacturer were procured?

available in similar products

The syste1n components must The Star Line Track B usway If other components or parts meet or exceed compatibility system is the existing, and sole from another manufacturer are standards for the existing Star power distribution system in procured, they may not function Line Track Busway I 00/225A Building 642. The components with the existing Star Line power configuration. required to augment the existing Track Busway, or when they are configuration are the equivalent connected to the existing system I. U-shaped copper busbar. of repair or replacement parts they may malfunction, causing a

2. Flexible plug-in module which are unique to the Star catastrophic failure of the entire connection positions. Line Track Busway product track busway or failures of

3. Plug-in modules with series. power supplies that suppmt customized configurations critical C41 system devices.

for outlets, phase, breakers, fused disconnects, and The introduction of near-terminal blocks. equivalent products would

4. Customized plug-in drop require the project/laboratories cords. to complete a Verification and

5. Underwriters Laboratories Validation (V&V) of the

(UL) and Electrical Testing proposed products to determine Laboratories (ETL) listed. if they can be integrated into the existing power distribution The installation of the material system configuration and are may be accomplished by any capable of providing the licensed electrical contractor required functionality. The level that is also qualified to install of effott (LOE) to conduct such and/or modify Star Line Track a V&V would require resources Busway configurations. not cmrnntly available, and the evolution could take up to one year to complete. This would negatively impact the current C41 SoSE, TE&C event

3 Template July 2018 schedules, and would severely limit the capability of the laboratories to support scheduled events. The additional cost to identify, procure, V & V, and implement near-equivalent components and/or parts would exceed project resource availability, disrnpt laboratory operations, and negatively impact PEO C41 program event schedules

4) Describe the Market Research conducted.

You must provide sufficient nanative explaining your research, date performed, and how you are ce1iain no other products exist that meet your requirements, or how you are certain that similar products are inadequate that meet your requirement. Market research is not a substitute for competition and requirements should be well-established prior to seeking use of non-competitive procedures. If your requirement is supported by an official document (e.g., a Program of Record) that mandates specific Brand Name materials that cannot be substituted, you must reference the document in sufficient detail to allow the reviewer to obtain the document; your notation must identify any applicable document number, date, paragraph/table or other identifying location, the issuing and approving authority. Attaching a copy of the applicable document provides the best suppoti, and ifthe document is lengthy, provide copies of the applicable pages reflective of the mandated items, the title page (or equivalent), and approval page. In addition, you must explain the impact of using an "alternate or equal" item, in order to justify why market research was not conducted.

Use the table below (or attach a similar table) to supplement your narrative. Provide a comparison of your required item to any similar products or services that do not meet all of the criteria listed in table 3(a) or 3(b) above. If the product/service is truly unique and no other similar items exist, list only your product/service and check each box showing that it meets all minimum criteria listed in table 3 (a) or 3 (b ). In the first row you will list each of your Critical Attributes/Minimum Characteristics from the Table in 3(a)/(b) above. Then, in the first column you will list each company/manufacturer and the brand/model of the product you reviewed. Finally, in the columns adjacent to the company/brand listed, you will indicate whether it "Met" or "Did Not Meet" the required characteristic. DO NOT LEA VE TABLE 4 BLANK.

Second Quarter Fiscal Year 2018 market research was conducted to identify mamifacturers of overhead power distribution systems and to determine if their product(s), in particular control boxes, plug-in modules, and power bus bars, were compatible with the Star Line Track Busway I 00/225A configuration (mamifactured by Universal Electric Corporation [UECORP]). The research included consultation with

4 Template July 2018 product representatives from various electrical system vendors as well as SSC PAC electrical engineers to identifY potential products that could be integrated into an existing Star Line configuration. Multiple evaluations of potential products were also attempted in small, isolated experiments where near-equivalent components/products were introduced to the existing power distribution system. In each instance, the alternate/near equivalent manufacturer's product could not be physically connected to the existing configuration, would connect but failed to function, or resulted in findings that indicated additional changes would have to be implemented in the physical configuration of the existing power distribution system. The research resulted in no other large or small businesses that manufacture products that are fully compatible and meet an acceptable "substitution" attribute (an item or part that can be substituted for an original manufacturer item or part with no loss in function or capability), or that can be fidly integrated into the Star Line Track Busway configuration that is already online at SSC PAC in Building 642 and represents a majorfinancial investment on behalf ofSPAWAR, PEO C4I, and SSC PAC. Options to conduct additional compatibility and performance evaluations on alternative/near-equivalent components requires resources (fimding, material, time, and personnel) that are not available.

TABLE ( 4) MARKET RESEARCH RESULTS

Company/ Minimum Minimum Minimum Minimum

Vendor Specification/Capab Specification/Ca pab Specification/Capa b Specification/Capab ility/ ility/ ility/ ility/ Attribute (Fron1 Attribute (From Attribute (Fl'oni Attribute (Fro111 Table 3 a), or (b ~ Table 3 a ,or b)) Table 3(a),or (b Table 3 a),or (b))

Co1nponents rneet Components meet Co1nponents 1neet Components meet oreYceed or exceed or exceed or e..."Cceed compatibility compatibility compatibility compatibility standards for the standards for the standards for the standards for the existing Star line existing Star Line existing Star Line existing Star line

Track Busway Track Busway Track Busway Track Busway I 00/225A power I00/225Apower 100/225A power J00/225A power configuration; U- configuration; configuration; configuration;

shaped copper Flexible plug-in Plug-in modules Customized plug-in bus bar module connection 1vith customized drop cords positions configurations for outlets, phase, breakers, fiised disconnects, and terminal blocks

Star Line

Eaton

General Electric

5 Template July 2018

(b)(3), (b)(4), (b)(5)

I Siemens

5) List any other information or facts supporting the justification to limit competition not described elsewhere on this form (e.g., international agreement).

If you do not have any additional information to add, simply write "NI A."

SSC Pacific SSC Pacific, Code 53 market research confirmed that the Star Line product line is available for purchase from authorized material-only resellers as well as electrical contractors that perform general/various electrical system installations. The material and installation service listed in Section 2) a. above were captured from a site proposal/Statement of Work (SOJf) for Building 642 that was receivedfi·om Power Pro Plus, a small business, electrical contractor that completed a Star Line Track Busway installation at SSC PAC in Building 600.

6) Provide a statement of actions that will be taken to remove or overcome any barriers to competition prior to any future procurements for this Supply or Service (there is an ongoing dutv to remove the elements of a justification that unduly restrict competition thereby allowing for competition of this requirement in the future).

This material and installation service is expected to be a one-time procurement for Building 642. SSC Pacific Code 53 does not expect that another major procurement will be required, however; the code will monitor the market via the web, trades how attendance, and via on-site product demonstration opportunities to identijj; additional options for and/or alternatives for expanding, repairing, and/or replacing the Star Line Track Bus;vay configuration. Should a need develop for additional acquisitions, all other alternatives and competitive sources will be considered.

Technical Cognizance Branch Head or Above

SSC PAC 53222

Print Name I Signature Title Code

Date

Template July 2018

(b)(3), (b)(4), (b)(5)

(b)(6)

FOR COMPLETION and SIGNATURE BY CONTRACTING OFFICE:

7) List any sources that expressed interest in submitting an offer for the procurement, as a result of the sources sought synopsis or posting of requirement on e-commerce. If no companies expressed interest, state "NONE."

None

Contracting Officer Certification:

I certify that this justification is accurate and complete to the best of my knowledge and belief.

Contracting Officer