AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(1) The purpose of this amendment is to provide answ ers to contractor questions.

(2) This amendment also contains revisions (adds/changes/deletions) to the solicitation requirements.

(3) All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jan-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N65540-15-R-5171

X 9B. DATED (SEE ITEM 11)

01-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jan-2016

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 02312, ANGELA CUSATI

215-897-1891, ANGELA.CUSATI@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N65540-15-R-5171

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES EDIT

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFP N65540-15-R-5171 QUESTIONS

1. QUESTION: What is the minimum quantity that will be released by this solicitation?

ANSWER: Please refer to page 7 of 63 of solicitation, N65540-15-R-5171:

“CONTRACT MINIMUM: The contract minimum shall be met by either ordering the quantities listed above in CLIN 0001 through 0003, or if First Article Testing (FAT) is waived, then the minimum shall be satisfied by ordering 5 production units as listed in CLIN 0004.”

2. QUESTION: Paragraph 2.5 cites as a Reference, Mil-Std-704F- Aircraft Electric Power Characteristics. It is unclear how this pertains to this RFQ for a 440 VAC, 3 ph, 3-wire Output.

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

3. QUESTION: Paragraph 3.15.2 states, “Specifically designed to service present and future aircraft no-break power requirements." Again, it is unclear how this would relate to a Frequency Converter with 440 VAC, 3 ph, 400 Hz Output.

4. QUESTION: Paragraph 3.17 cites an ambient Temperature of 52 Deg C. The standard shipboard maximum ambient temperature is 50 Deg C. Is the 52 Deg C a typo?

ANSWER: The solicitation is clear on its face.

5. QUESTION: We have no facility to provide different pricing for procurement year quantities ranging from

1 to 25. The price of the equipment decreases the larger the production orders are. It would be advantageous to the government and enable it to get better pricing by including FAR 7.2 which would provide for economic order quantities based on volume. It is very difficult to set pricing for quantities that may range from 1 to 25 and remain competitive while providing the best value for the government.

ANSWER: The solicitation is clear on its face. Please refer to solicitation page 55 of 63, FAR clause

52.216-1, Type of Contract (April 1984).

6. QUESTION: The dimensions in Table 1 of page 9 in our opinion are too small to accommodate an

180KVA SSFC that has transformer isolation. We feel the approximate dimensions should be 80"H z 72"W x 36"D or some variation of that approximate volume. Similarly, we feel that the weight at this power rating should be approximately 6000lbs. Are we permitted to bid dimensions that we feel are more technically feasible?

ANSWER: No, the solicitation is clear on its face.

7. QUESTION: On page 30, 52.209-3, First Article Approval, paragraph (b) notes that the first article test report must be submitted 60 calendar days from the date of this contract. It is clear in the paragraph that this is intended to be the completed first article test report and not just the format of the report. It is not possible to have the first article completed and tested within 60 days from the date of the contract. Please clarify.

ANSWER: On page 30 of 63 of solicitation, N65540-15-R-5171, FAR clause 52.209-3, First Article

Approval, sentence one of paragraph (b) has been revised from 60 calendar days to 90 calendar days from the date of this contract.

8. QUESTION: How shall we include the pricing for the first article? The price for this would include the non-recurring engineering (if applicable). We typically see separate line items for the first articles of the

FFP IDIQ multiyear contracts we have received or bid on.

ANSWER: As stated in Amendment 0002, the solicitation is clear on its face. Proposal content is at the discretion of the offeror.

9. QUESTION: Page 31, 52.216-19, Order Limitations, paragraph (b) states that the contractor is not obligated to honor any order for a single item in excess of 5 units. This does not make sense because 5 is the minimum, but the maximum would be 25 units annually. 1, 2 and 3 under paragraph (b) do not seem to make sense considering the maximum order limitations.

ANSWER: Page 31, 52.216-19, Order Limitations, paragraph (b), (1) and (2) has been corrected to reflect

25 units.

10. QUESTION: Paragraph 4. First Article Test Requirements - 4.1.1 Mill Std-901D - Shock Test: Please confirm that the Shock Test needs to be performed on only one Converter, operating in isolation.

(Converters which can operate in parallel with one or more converters normally would be required to undergo the Shock test while running in parallel with one other, which is not being subjected to the Shock

Test).

11. QUESTION: Paragraph 4. First Article Test Requirements - 4.1.3 EMI/MIL-STD-461F: Please advise if there is any maximum value on the capacitance between Line and Ground, on the Input and Output Phases.

12. QUESTION: Since this planned procurement has been designated as a small business set-aside, would a small business distribution/ dealership be eligible for award if they planned to procure the contract end item from a large business and then supply it to the government with no value or minimal value added?

ANSWER: Proposal content is at the discretion of the offeror.

13. QUESTION: Does the small business bidder need to be a manufacturer, as determined by the Walsh

Healey Act, in order to be eligible?

ANSWER: Yes, please refer to FAR clause, 52,222-20, Contracts for Materials, Supplies, Articles and

Equipment Exceeding $15,000.

14. QUESTION: Where on the ship will the unit be located (topside/above decks or below decks)?

15. QUESTION: Is this solicitation set aside for “Total Small Business” or “Small Business”?

ANSWER: Total Small Business

16. QUESTION: The solicitation schedule CLIN 0002 states the First Article Test Report delivery date is 90 days ADC. However, in the Clauses Section, Page 30 of 63, clause 52.209-3, FIRST ARTICLE

APPROVAL – CONTACTOR TESTING states the “the contractor shall submit the first article test report within 60 calendar days from the date of this contract…”. What is the delivery/due date for the FA Test

Report: 90 days ADC or 60 days from date of contract?

ANSWER: 90 calendar days from the date of this contract. Additionally, page 30 of 63, clause 52.209-3, FIRST ARTICLE APPROVAL – CONTACTOR TESTING, has been updated to reflect 90 days.

17. QUESTION: Is this solicitation for replacement of existing equipment or for new equipment?

ANSWER: This solicitation is a first time requirement.

18. QUESTION: Has this equipment been previously purchased by Naval Sea System Command?

ANSWER: No

19. QUESTION: Is there a previous NSN or part number for this product?

20. QUESTION: In what environment will this equipment be located (top deck exposed to the elements, hanger bay, power distribution area, etc.)?

21. QUESTION: With regards to MIL-STD-461F requirements, is this unit categorized as NAVY ‘top deck/above deck’ or Navy ‘below deck’?

22. QUESTION: Is there an opportunity to have a question and answer session with your team?

23. QUESTION: Are there any nonlinear loads? If yes, what is the kVA and Crest Factor?

24. QUESTION: Is there a minimum efficiency?

25. QUESTION: Is there any required minimum value for MTBF of the Converter?

26. QUESTION: Is there a Mean Time to Repair (MTTR) for the Converter?

27. QUESTION: Input and Output Protection and Controls - What is required for the Input; Circuit Breaker, Contactor, Fusing?

28. QUESTION: Input and Output Protection and Controls - What is required for the Output: Circuit Breaker, Contactor, Fusing?

29. QUESTION: What clearance is available around the Converter for ventilation and maintenance?

30. QUESTION: There appears to be no HMI requirement. Please confirm, or advise what instruments/displays are required.

31. QUESTION: Paragraph 3.12, Page 9 of 6 - This is unclear. Voltage should decrease with increasing load?

32. QUESTION: Paragraph 3.12, Page 9 of 6 - How does this match up with the Voltage Regulation requirements cited in Paragraph 3.6?

33. QUESTION: Paragraph 3.25, Page 9 of 63 - Please advise what the required standard for the Technical

Manual preparation are?

ANSWER: Please refer to the updated Statement of Work and CDRL A003 which are both provided as an attachment to this amendment.

34. QUESTION: Paragraph 3.26 Size and Weight, Page 9 of 63 - Please confirm that the maximum envelope and weight cited in Table 1, are for a design which will meet the Shock Requirement as stated in Paragraph

3.22, the vibration requirement as stated in Paragraph 3.23, the EMI requirements as stated in Paragraph

3.24, and the requirement of MIL-STD-1399 Section 300 B

35. QUESTION: Paragraph 4 First Article Testing Requirement, Page 10 of 63 - Apart from the tests listed in

Paragraphs 4.1.1 thru 4.1.3 there appears to be no requirement for a True First Article Performance/Design

Verification Factory Tests prior to the above cited tests in Paragraph 4.1. Paragraph 4 First Article Testing

Requirement, Page 10 of 63 - Please confirm, or advise what Factory Tests are required to prove the design requirements.

36. QUESTION: Section 1C. Management and Logistical Support Plan, Page 58 of 63 - This requires that information be provided regarding the “average monetary value” of parts stocked. Is the Contractor required to maintain a stock of spare and replacement parts as a requirement of contract performance, and what is implied by the term “dealership”?

ANSWER: On page 58 of 63, Section 1C. Management and Logistical Support Plan, the last sentence which mentions “average monetary value” has been deleted.

37. LIMITATION ON INPUT CAPACITANCE TO GROUND FOR SHIPBOARD USE - Paragraph

2.1 cites Mil Std 1399:

a. QUESTION: Is all of Mil Std 1399 Section 300 B applicable?

ANSWER: The solicitation is clear on its face.

b. QUESTION: In Mil Std 1399, para 5.2.4 requires a limitation for shipboard equipment to meet capacitance limit of 0.1 uf to ground per phase for 60 Hz input. This requires the use of a multi stage filter on the front end which is specially designed to meet this requirement. Please advise if the 0.1 uf capacitance to ground limit portion of Mil Std 1399 is applicable?

ANSWER: The solicitation is clear on its face.

c. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

d. QUESTION: If so, should it be called out by a paragraph reference, and under what paragraph should it be responded to?

38. VOLTAGE TRANSIENT PERFORMANCE

a. QUESTION: Voltage Transient performance is required by specification para 3.10 reference Mil Std 704 F. Figure 3 shows the voltage transient performance for a 115/200

VAC system.

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment. Section 2.5 has been removed.

b. QUESTION: Spec Para 2.1 references Mil Std 1399. Table 1 of Mil Standard 1399 for Type

III power references voltage transient performance of +/-‐ 5%.

ANSWER: The solicitation is clear on its face.

c. QUESTION: Is it intended that the same voltage excursion percentages of Mil Std 704F be applied to

440 VAC?

ANSWER: Please refer Question/Answer 38a.

39. DOWNSTREAM DISTRIBUTION

a. QUESTION: From the required 180 KVA converter is there downstream distribution of the 440 V system, which steps the voltage down, and provides isolation to the intended load?

ANSWER: Yes

b. QUESTION: If there is downstream distribution with isolation already, is galvanic isolation necessary internal to the converter?

40. INPUT / OUTPUT LOCATIONS

a. QUESTION: Are there preferred locations for the input and the output feeder cables?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Is side input/output penetration permitted? (This will take more space on the left and right to allow cables to enter/exit?

ANSWER: Yes, and recommended.

c. QUESTION: Is bottom input and output permitted?

ANSWER: No

d. QUESTION: Is top input and output preferred?

ANSWER: No

e. QUESTION: Are input/output penetration cable glands, and feed through fittings required to be provided along with the equipment?

41. RESILIENT MOUNTING

a. QUESTION: Is the equipment permitted to be resiliently mounted?

ANSWER: The solicitation is clear on its face.

b. QUESTION: If resilient mounting is permitted, are the dimensions of the mount system outside of the required dimensions shown in 3.26 (Table 1)?

ANSWER: The solicitation is clear on its face.

c. QUESTION: If resilient mounting is permitted, is the weight of the mount system outside of the weight shown in 3.26 (Table 1)

42. NON LINEAR LOAD

a. QUESTION: Are there any requirements to support Non Linear type loads, which are typical of combat systems, weapons systems, radar, and aircraft loads?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

d. QUESTION: Standard NAVFAC Specifications require nonlinear loads of 15% current harmonics comprised of 6% of the 3rd harmonic, and 7% of the 5th harmonic to maintain voltage distortion of

5% THD max, and 3% individual harmonics max for both 50% nonlinear load and 100% nonlinear load. Is this required?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

e. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

f. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal?

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

g. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

43. PARALLELING

a. QUESTION: Please advise what type of paralleling is required? There are typically three types of paralleling

1. Current sharing whereby two units are on all of the time and the load is shared between them equally (+/- 10%) at all times.

2. Call On/ Call Off – which allows one unit to carry the load fully and until it reaches a certain percentage load (example 70%) and then it calls on the second unit, which is running idle until that point. This type specifies a load level, and has a time delay to bring on the second unit.

3. Manual Mode or Automatic – That the unit can operate in manual mode, which allows the user control the paralleling function, or automatic, which allows the units to control the paralleling.

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: Please advise if this is a requirement and will it be added to the evaluation criteria of the technical proposal?

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

44. DOOR SWING

a. QUESTION: Is the front door permitted to swing out, or is there a restriction on the door swing limit?

Is the access into the front of the unit with a swing out front door possibly blocking passage?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Or is a front removable panel required instead of a swing out door?

45. ACOUSTICAL NOISE

a. QUESTION: Is the unit intended to go into an Electrical Equipment Room?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Is the unit intended to go in a Passageway?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: Is the unit intended to be mounted in a berthing area?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

d. QUESTION: Is the limitation of the 65 DBA due to a berthing area?

ANSWER: The solicitation is clear on its face.

e. QUESTION: Normally frequency converters at this KVA rating are inside an electrical room where

68 dBA is acceptable, is this acceptable?

46. FIRST ARTICLE TESTS

a. QUESTION: Paragraph 4.0 discusses First Article Testing and describes, EMI, Shock, Vibration, but does not reference any requirement to verify the electrical specification performance. Is verification of the electrical performance intended to be part of the First Article Testing?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: If so, will this be added to the First Article Test list?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection 1D. Test Plan for First Article Testing.

47. NEMA 3R Rating

a. QUESTION: Is the unit intended to be installed inside a ship or installed outside subject to weather requirements?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: If outside, is it subject to propeller driven rain?

c. QUESTION: Is it subject to rain (Nema 3R & IP54), or is it subject to hose direct forced water spray

(Nema 4/IP55). Please clarify. Spec states Nema 3R/IP55.

48. PARALLELING CABLES

a. QUESTION: Are there intended to be paralleling cables to provide communication which will be inside of the 30 feet limit?

ANSWER: Yes

b. QUESTION: Or, are the units to be parallel wirelessly?

ANSWER: No

c. QUESTION: Who is to furnish the paralleling cables? What limitations of this cable are required?

ANSWER: The offeror shall supply any required hardware.

d. QUESTION: Where is the paralleling tie point to be located? Is this in the downstream switchgear?

49. REMOTE CONTROL OF OUTPUT CONTACTOR ON/OFF

a. QUESTION: Is remote location actuated start/stop required? For example, a pushbutton located elsewhere which controls contactor on/off command?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Or is output contactor on/off controlled only from the front of the unit?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: Is the output of the unit required to have an output circuit breaker? Or is an output contactor sufficient?

50. TEST AND OPERATION AT LOW LINE INPUT, HIGH LINE INPUT

a. QUESTION: Is the unit required to operate at Low Line Input of 440 V at -10% (396V), and 440 V at

+10% (484V)?

ANSWER: Please refer to Requirement 3.1 of the Statement of Work

b. QUESTION: Is the unit required to be tested at Low Line input and High Line Input Voltage?

ANSWER: Please refer to Requirement 3.1 of the Statement of Work

c. QUESTION: Is this required to be part of the First Article Tests?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

d. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal?

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

e. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

51. FIRST ARTICLE TESTING VS PRODUCTION TESTING

a. QUESTION: Which electrical tests are required for First Article Unit?

ANSWER: Please refer to Section 3, Requirements, of the Statement of Work.

b. QUESTION: Which electrical tests are required for Production Units?

c. See chart for one example:

First Article Tests Production Tests

Input Electrical Interface X 0

0.1 capacitance / ground/ phase X 0

Low Line Input, Nominal and High Line X X

Output Voltage at 100%, 1.0 pf X X

Output Voltage at 100%, 0.8 laggin X X

Output Voltage at 100%, 0.8 leadin X X

Non Linear Load X X

Overload 0 125% for 10 min X X

Overload 0 150% for 30 sec X X

Overload 0 200% for 20 sec X X

Voltage Regulation X X

THD X X

IHD X X

Non Linear Load X X

DC Content X X

Transient Performance X X

Output Adjustment X X

Droop 8% X X

Output Frequency X X

Paralleling X X

No Break Power X X

Phase Loss X X

Low High Input Voltage Protection X X

Overload protection X X

Contactor Failure Contactor Stuck X X

Transistor Failure X X

Door Interlock X X

Acoustical Noise X 0

Shock X 0

Vibration X 0

EMI X 0

High Temperature Operation +52C X 0

Short Circuit X X

Inrush current Limit X X

Input Surge Protection X 0

Automatic Restart X X

Input Power Factor X X

Input Current Distortion X X

52. DOWNSTREAM DISTRIBUTION POINT CONTROLLED WITH REMOTE SENSE

REGULATION TO THAT POINT

a. QUESTION: Is remote sensing required? Remote sensing can control the voltage precisely, independently per phase at a remote location downstream such as the point of distribution. Is this required?

b. ANSWER: No

53. 0.6 CAPACITIVE LOAD

a. QUESTION: There is a requirement to have 180 KVA of 0.6 capacitive load? Is 0.6 pf capacitive a real requirement for 180 KVA of power? Typically, capacitive load is required up to 0.8 pf leading.

b. ANSWER: The solicitation is clear on its face.

54. REQUIRED DUE DATE

a. QUESTION: Page 2 of 63, CLIN 0001 First Article Test Plan, and on page 16 states due 90 days

ADC; CDRL states in block 12, 60 DAC, Which one is correct?

b. ANSWER: 90 ADC. The CDRL has been revised.

c. QUESTION: Page 2 of 63, CLIN 0002 First Article Test Report, and on page 16 states due 90 days

ADC; CDRL states in block 12, 60 DAC, which one is correct?

d. ANSWER: 90 DAC. The CDRL has been revised.

e. QUESTION: Page 3 of 63, CLIN 0003 Technical Manual, and on page 16 states due 120 days

AFATA; CDRL states in block 12, 120 DAC, which one is correct?

f. ANSWER: 120 AFATA. The CDRL remains unchanged.

55. QUESTION 19 – DELIVERY TIMEFRAME

a. QUESTION: The delivery timeframe seems to indicate that the proposed vendor would already have to have a designed & fully tested unit completed PRIOR to bid date in order to achieve the 60 or 90 days ADC for both the plan and report, since the elapsed time of the testing exceeds 60 days or 90 days. Is it the intent to restrict the bid to only bidders that already have prequalified units prior to bidding? (similar or same units which are previously qualified, but need adapting, still need to go through an engineering phase, a production phase, and a testing phase)

ANSWER: The solicitation is clear on its face.

b. QUESTION: The timeframe required does not allow for any engineering time, is it the intent to restrict the bidders to only those that already have fully designed unit prior to bidding since the delivery time does not allow any time for engineering?

ANSWER: The solicitation is clear on its face.

c. QUESTION: The timeframe required does not allow any time for manufacturing of units to test, is the intent to restrict the bidders to only those that already have a fully manufactured unit prior to bidding since the delivery time does not allow any time for production?

ANSWER: The solicitation is clear on its face.

d. QUESTION: Please clarify that ADC, means After Date of Contract, and not After Design

Completion.

ANSWER: ADC = After Date of Contract

56. INSPECTION AND ACCEPTANCE

a. QUESTION: What is the criterion for inspection to be used at destination on page 15 of 63?

ANSWER: The solicitation is clear on its face.

b. QUESTION: What is the criterion for acceptance to be used at destination on page 15 of 63?

57. SPEC FOR RECTIFIER BUS TRANSFER

a. QUESTION: Page 58, para 1.D indicates that there is a Spec for Rectifier/Bus Transfer, could this be misprint?

ANSWER: Yes, “Rectifier/Bus Transfer” has been removed and replaced with “SSFC.”

58. WARRANTY

a. QUESTION: What is the warranty period required?

ANSWER: Beyond inspection and acceptance of the SSFC conforming to the requirements, there is no express or implied warranty.

b. QUESTION: Is there an extended storage period, or installation period that needs which will occur, before the system is turned on?

ANSWER: Please refer to Question/Answer 57a.

c. QUESTION: What type of warranty is required?

ANSWER: Please refer to Question/Answer 57a.

d. QUESTION: Parts warranty only?

ANSWER: Please refer to Question/Answer 57a.

e. QUESTION: Parts and service warranty?

ANSWER: Please refer to Question/Answer 57a.

f. QUESTION: Will preventative maintenance be performed by shipboard personnel? Typically warrantied is predicated on Preventative Maintenance being performed.

ANSWER: Please refer to Question/Answer 57a.

59. COMMISSIONING AND ON SITE STARTUP

a. QUESTION: Is commissioning/on site start up and testing required to insure equipment is functioning properly after the installation is completed?

ANSWER: No

b. QUESTION: If commissioning is required, would all units be done at one time for each vessel, or would it be done in phases?

ANSWER: Not required.

c. QUESTION: If commissioning is not required, who will start up the systems?

ANSWER: Not applicable.

d. QUESTION: Typically, warranty is predicated upon commissioning by trained personnel.

60. TRAINING

a. QUESTION: Is On board training required?

ANSWER: No, Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Is Factory Training required?

ANSWER: Yes, Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: If training is required, is it operator level training or maintenance level training? Or both?

ANSWER: Both, please refer to the updated Statement of Work which is provided as an attachment to this amendment.

61. SHOCK TEST

a. QUESTION: What type of vessel will this equipment be installed in?

b. ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

QUESTION: Will it be multiple types of vessels?

c. ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

QUESTION: What deck level, and what type of vessel will it be installed in so that it can be determined what type of input frequency is required to the shock mounts?

d. ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

QUESTION: What orientation is required?

e. ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

QUESTION: Will any member of the equipment be tied to a structural bulkhead? Mil Std 901D, para

1.2.5 states that any devices which are attached to a structural bulkhead, which are below the waterline, are considered to be “Hull Mounted” Please advise if there are any units which fit this category?

f. ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this

QUESTION: Is it anticipated to have a Heavy Weight Barge test vs a Hammer Test?

g. ANSWER: The solicitation is clear on its face.

QUESTION: Which decks are applicable? 8-10 Hz deck, 1216 Hz deck, 25 Hz and above?

h. ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

i. QUESTION: Is this for only one type of vessel or for multiple vessels? Which decks apply?

62. SHORT CIRCUIT

a. QUESTION: Is there a requirement for short circuit protection? Such as L-L per phase and L-G, and

Three Phase Short?

b. ANSWER: The solicitation is clear on its face.

63. INRUSH CURRENT LIMIT

a. QUESTION: Is there a requirement to limit the inrush current to 150%?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

b. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal.

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

d. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

64. INPUT SURGE PROTECTION

a. QUESTION: Is there a requirement to limit the input surge protection in accordance with para 3.1.3 of

Mil Std 1399?

ANSWER: Proposal content is at the discretion of the offeror.

b. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please refer to the updated Statement of Work which is provided as an attachment to this amendment.

c. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal?

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

d. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

65. AUTOMATIC RESTART

a. QUESTION: Is automatic restart required that restarts the unit if power disruption occurs?

ANSWER: No

b. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal?

ANSWER: Not a requirement.

c. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Not a requirement.

d. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

ANSWER: Not a requirement.

66. INPUT POWER FACTOR

a. QUESTION: Is there a requirement to maintain the input power factor between 0.8 and unity under all line and load conditions?

ANSWER: Please see the updated Statement of Work

b. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please see the updated Statement of Work

c. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal?

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

d. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

67. INPUT CURRENT DISTORTION

a. QUESTION: Is there a requirement for the input current distortion to be < 5% THD at full load?

ANSWER: Please see the updated Statement of Work

b. QUESTION: If this is a requirement, please advise if this requirement will be added to the evaluation criteria of the technical proposal?

ANSWER: Please see the revised Section M. Evaluation Factors for Award, paragraph (f), subsection

1D. Test Plan for First Article Testing.

c. QUESTION: Please advise if this requirement will be added to the First Article Tests?

ANSWER: Please see the updated Statement of Work

d. QUESTION: If so, should it be called out by a paragraph reference and under what paragraph should

68. INPUT DISCONNECT DEVICE

a. QUESTION: Is the input to the unit to be provided by an upstream circuit breaker in the ship’s switchgear?

ANSWER: The solicitation is clear on its face.

b. QUESTION: If an upstream breaker is provided, then an input circuit breaker is not required?

If an upstream breaker is provided, then an input circuit breaker is not required?

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

1. Scope

1.1. This statement of work specifies the requirements for a Solid State Frequency Converter (SSFC) that will be utilized on U.S. Navy ships to convert 60 Hertz (Hz) electrical power to 400 Hz electrical power.

1.2. The SSFC shall have the following maximum continuous output kVA rating:

1.2.1.180 kVA (144 kW), 400Hz, 450VAC, 3φ, three wire, ungrounded.

2. Referenced Documents

2.1. MIL-STD-1399 Section 300B – Interface Standard for Shipboard Systems, Electric Power, Alternating Current (Metric), 24 April 2008

2.2. MIL-STD-901D – Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and

Systems, Requirements for, 17 March 1989

2.3. MIL-STD-167-1A – Mechanical Vibrations of Shipboard Equipment (Type I –Environmental and Type II – Internally Excited), 2 November 2005

2.4. MIL-STD-461F – Requirements For The Control of Electromagnetic Interference Characteristics of

Subsystems and Equipment, 10 December 2007

The above are available online at: http://assist.daps.dla.mil/quicksearch/. Enter the document number, e.g. 1399, and then click “submit.”

3. Requirements

3.1. Input Electrical Interface. The SSFC shall meet the requirements of MIL-STD-1399 Section

300B for Type I, 60Hz, 440VAC, 3φ, ungrounded electrical power.

3.1.1. Input Protection. The SSFC shall have an internal circuit breaker at its input.

3.1.2. Input location. The input to the SSFC shall be located on the same side as its output and shall have access for penetration to input breaker. Input penetration is not permitted on the top or bottom of SSFC.

3.1.3. Inrush. The SSFC shall limit inrush current to 150% or rated current.

3.2. Duty. The SSFC shall be designed to operate continuously (100 percent duty).

3.3. Output. The SSFC shall have one output of 450 VAC, 400 Hz, 3φ, ungrounded rated at 230

Amps, 180 kVA (144 kW @0.8pF).

3.3.1. Output Protection. The SSFC shall have an internal contactor for its output and shall also have internal galvanic isolation.

3.3.2. Distribution. Downstream distribution to a switchboard, which may step the voltage down, and has isolation to final loads is the intended power scheme.

3.3.3. Output location. The output to the SSFC shall be located on the same side as its input and shall have access for penetration to output contactor. Output penetration is not permitted to be located on the top or bottom of SSFC.

3.4. Load Power Factor. The SSFC shall supply its full output rating to electrical loads with a power factor ranging from 0.8 lagging to 0.6 leading.

3.5. Overload. The SSFC shall withstand, without damage, an overload condition of 125% of its full load rating for 10 minutes, 150% of its full load rating for 30 seconds, and 200% of its full load rating for 10 seconds.

3.5.1. SSFC is not required to automatically restart after input power disruption or fault.

3.6. Voltage Regulation. The SSFC shall regulate output voltage to ±1% from no load to full load.

3.7. Total Harmonic Distortion (THD). The SSFC output voltage THD shall be less than 3% of the fundamental.

3.8. Individual Harmonic Distortion (IHD). The SSFC output voltage IHD shall be less than 2% of the fundamental.

3.9. Direct Current (DC) Content. The SSFC output voltage shall have less than 100mV.

3.10. Nonlinear loads. The SSFC shall function with loads up to 90kVA and crest factor of 1.414 +/-

0.07.

3.11. Output Adjust. The SSFC output voltage shall be able adjust up to ±15%.

3.12. Droop: For paralleling purposes only and only if paralleling scheme requires, the SSFC shall provide for manual voltage droop adjustment up to 8%.

3.13. Output Frequency. The SSFC shall regulate output frequency to meet or exceed the requirements of MIL-STD-1399, Type III 400 Hz power.

http://assist.daps.dla.mil/quicksearch/

3.14. Paralleling. The SSFC shall be capable of paralleling with another like unit located within

30 feet of each other.

3.14.1. The load shall be shared within ±10%.

3.14.2. The SSFCs shall be capable of parallel operation/separation throughout full range of rated load.

3.14.3. The SSFC shall be provided with all required cabling to support parallel operation.

3.14.4. Wireless paralleling is not acceptable unless performed via monitoring of the bus voltage.

3.15. Protection. The SSFC shall have the following integrated protection:

3.15.1. In the event of short circuit, SSFC shall shutdown without damage to unit.

3.15.2. Specifically designed to service present and future aircraft no-break power requirements while bringing co-located pair of SSFCs into/out of parallel.

3.15.3. Input Power:

3.15.3.1. Phase loss protection

3.15.3.2. Low/High input voltage protection

3.15.4. Output Power:

3.15.4.1. Over/Under Voltage & Frequency protection

3.15.4.2. Overload protection

3.15.5. Internal:

3.15.5.1. Over temperature protection

3.15.5.2. Contactor failure / Contactor stuck / Coil open protection

3.15.5.3. Transistor failure/overcurrent protection

3.15.5.4. Door interlock

3.16. Ventilation. The SSFC shall be forced air cooled and not require any external means of cooling.

3.17. Environmental. The SSFC shall function as described herein in a 52Celsius environment as the location onboard ship varies.

3.18. Self-contained. The SSFC shall be a “stand-alone” unit and not require any computer interface for operation, maintenance, or repair.

3.19. Acoustical Noise. For all conditions of operation specified herein, the SSFC produce less than 65 dBA of noise at 1.5 meters high, 1 meter from the unit, all sides.

3.20. Mounting. The SSFC shall be deck mounted only.

3.21. Enclosure. The SSFC enclosure shall be rated for NEMA 3R or IP55.

3.22. Shock. The SSFC shall meet the requirements of the high-impact shock tests for grade A, Class I, of

MIL-STD-901D.

3.23. Vibration. The SSFC shall meet the requirements of MIL-STD-167-1A, Type I, 4-25Hz.

3.24. EMI. The SSFC shall meet the requirements of MIL-STD-461F, Tests: RE101, RE102, RS101, RS103, CE101, CE102, CS114, & CS116.

3.25. Technical Manual. The SSFC shall have a technical manual with a minimum of the following sections: General operation, Functional Description, Maintenance, Troubleshooting, Corrective

Maintenance, Parts List, and Drawings.

3.26. Size & Weight. The maximum size envelope and weight is specified in Table I.

Table I

Maximum Dimensions (Inches) Weight (lbs)

Height Width Depth

60 24 51 2,200

3.27. Maintenance Envelope. The SSFC shall have a maintenance envelope of 24 inches at front and rear, 12 inches on both sides, and 12 inches on the top.

3.28. Efficiency. The SSFC shall have an efficiency of 93% or greater at full load.

3.29. Mean Time Between Failure (MTBF). The SSFC shall have a MTBF of 50,000 hours or greater.

3.30. Mean Time to Repair (MTTR). The SSFC shall have a MTTR of 30 minutes or less.

3.31. Human Interface. The SSFC shall have a local control for start, stop, and output on. It shall also have a local display for error codes, output voltage, and output current.

3.32. Commissioning. A one-time in house operator level training session is required to ensure government employees are knowledgeable with SSFC for future commissioning / training onboard ship.

4. First Article Testing Requirements

4.1. The SSFC will be tested to the following Military Specifications / Standards for unrestricted use throughout any Naval vessel:

4.1.1. MIL-STD-901D – Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and

Systems, Requirements for, 17 March 1989.

4.1.2. MIL-STD-167-1A – Mechanical Vibrations of Shipboard Equipment (Type I –

Environmental and Type II – Internally Excited), 2 November 2005

4.1.3. MIL-STD-461F – Requirements For The Control of Electromagnetic Interference

Characteristics of Subsystems and Equipment, 10 December 2007

4.2. Upon the completion of the first article testing, the contractor will prepare and submit a report detailing the inspections/tests performed.

4.3. The first article samples cannot be delivered as part of the production quantity.

4.4. The First Article Test Report shall be provided detailing conformance with all requirements stated in

Section 3.

5. Preservation, Packing and Packaging Requirements

5.1 Each SSFC shall be preserved, packed and packaged in accordance with standard commercial practices necessary to ensure protection of the SSFC against physical damage and deterioration during shipment, limited handling and short term storage.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000

MAY 2014

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(a) The Contractor shall conduct first article testing as specified in this contract. At least 90 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 90 calendar days from the date of this contract to

“ATTN: Stephen Chung, Naval Surface Warfare Center, 1601 Langley Avenue, Building 542E, Philadelphia, PA

19112-5051” marked "FIRST ARTICLE TEST REPORT: Contract No. TBT, Lot/Item No. TBD." Within 10 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the

Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph

(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 5 units, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of 25 units.

(2) Any order for a combination of items in excess of 25 units; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal

Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the

Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.

Upon receiving this notice, the Government may acquire the supplies or services from another source.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

CAR-L11 PROPOSAL PREPARATION REQUIREMENT (JUL 2007) (NSWCCD)

It is requested that offerors prepare their proposals in accordance with the following organization, content and format requirements to assist the government in making a complete and thorough evaluation of all proposals.

Proposals shall be submitted as three separate documents, as follows:

Documents Original Copies

Solicitation, Offer and Award Document (SF-33) 1 1

Technical Proposal 1 3

Price Proposal 1 1

The “originals” shall be clearly identified as the “ORIGINAL”, and bear the original signature(s) of the offeror. The

“copies” shall be complete and clearly identified as “COPY” or “DUPLICATE.” The proposal documents SHALL

NOT be embellished with any cover or binding. The four copies of the technical proposal shall be printed double-sided.

(1) SOLICITATION, OFFER AND AWARD DOCUMENTS (SF-33 RFP)

This document, which may be used as part of the contract award document, shall be fully executed and returned as a separate document from the technical and cost proposals. Special attention should be taken to accurately enter the prices required in Section B, complete all Representations and Certifications in Section K and ensure that an authorized person signs the offer in Block 17 of Page 1.

The document SHALL NOT be embellished with any cover or binding. If the offeror makes any qualifications to any provisions in the RFP, all such qualifications shall be listed in a cover letter to the proposal. Qualifications may also be annotated on the Solicitation, Offer and Award document, if such annotation is necessary to clarify the qualifications.

(2) TECHNICAL PROPOSAL

The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .