This is a Statement of Work (SOW) for a Basic Ordering Agreement (BOA) with Fincantieri Marine Systems North America, Inc. (FMSNA) to provide diesel engine lifecycle management and in-service engineering support for the U.S. Navy. The Naval Surface Warfare Center Philadelphia Division (NSWCPD) Code 422 seeks comprehensive support for Isotta Fraschini (IF) 1708T2ME and IF 1708C2ME8 diesel engines used on Littoral Combat Ship Class vessels, as well as the ID 36 SS 6V-AM engine model. The contractor shall provide engineering and technical services including technical issue resolution, failure analysis, root cause determination, product improvements, testing and evaluation, and field technical support. Additional services encompass logistics support (engine configuration management, parts provisioning, technical manuals, maintenance procedures), training services for crews and maintenance personnel, and program management services including BOA management, budgeting, scheduling, and financial tracking.
Deliverables required under CDRLs include monthly contract status reports, travel reports within 10 business days of trip completion, project planning charts, technical reports, and Government Furnished Property (GFP) inventory reports as applicable. The primary place of performance is at the contractor's facilities, with an estimated 90% of work conducted there and 10% at shipboard and ship homeport locations. Anticipated travel to Navy activities in Philadelphia, Mayport, San Diego, Puerto Rico, and Bahrain is required. All work is firm-fixed price, with contractor responsibility for travel cost inclusions. Personnel must maintain SECRET-level security clearances, complete mandatory security training (Antiterrorism, OPSEC, Cybersecurity, Counterintelligence), and obtain Facility Security Clearance within 90 days of award. Controlled Unclassified Information (CUI) must be safeguarded per NIST SP-800-171 standards, with prohibitions on personal email and social media transmission. The contractor must comply with Government Property accountability requirements per FAR Part 45 and DFARS Part 245, including receipt reporting through PIEE GFP Module and physical inventory accounting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - Fincantieri Diesel Engine Lifecycle Support.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for Fincantieri Marine Systems North America, Inc. (FMSNA) Diesel Engine Lifecycle Support
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 422, which has responsibility for Lifecycle Management (LCM) and In-Service Engineering (ISE) for US Navy diesel engines. The LCM and ISE mission involves maintaining adequate and effective operational readiness, safety and mission effectiveness of US Navy diesel engines and their associated auxiliary systems. In support of this mission, NSWCPD provides engineered solutions to fleet diesel problems.
Diesel Engine Original Equipment Manufacturers (OEMs) design, construct, install, service, support and provide repair and replacement parts for the engines under their purview. They possess certain unique knowledge, experience and expertise, and access to technical information that is not available elsewhere.
In support of its Diesel Engine LCM and ISEA mission, NSWCPD intends to leverage the contractor’s unique knowledge, experience and expertise, and access to technical information for the purpose of improving in-service and lifecycle support initiatives. The contractor will assist NSWCPD in developing, delivering and executing engineered solutions to fleet diesel problems. The engine lines to be addressed under this BOA include the Isotta Fraschini (IF) 1708T2ME and IF 1708C2ME8 used on Littoral Combat Ship Class vessels.
1.0.2 This Basic Ordering Agreement (BOA) is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
(c) Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
(a) The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
(b) Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
(c) Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
(d) It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
| (i) | Confirm the conduct is in violation and when necessary direct the mode of further performance, |
| (ii) | Countermand any communication regarded as a violation, |
| (iii) | Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or |
| (iv) | In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor. |
1.1 BACKGROUND
Virtually all mechanical equipment needs continuing engineering support to solve operational problems. Military systems require a higher level of engineering support than commercial equivalent systems. The military systems normally push the leading edge of technology and are subjected to ever-changing and demanding environments and mission cycles. New problems are continually experienced after approval for operational use. The new problems are a result of greater exposure, changes in mission, changes in system weight or configuration, variations in manufacture or repair, aging of the hardware, maintenance concept changes, critical materials availability, and changing component coating and fuel compounds. (i.e.: Bio-Fuel technologies and similar advances). These changes in engine usage can be dramatic and can have a dramatic impact on safety, readiness, and mission effectiveness. Therefore, a direct contractual relationship with diesel engine OEMs is essential to maintain these systems at full operational capability.
1.2 SCOPE OF WORK
This Statement of Work (SOW) describes services to be applied via Task Orders (TOs) detailing specific support requirements within the scope of this Basic Ordering Agreement (BOA) SOW. The overall scope of this SOW is to provide lifecycle, modernization and in-service support for the IF 1708T2ME, IF 1708C2ME and ID 36 SS 6V-AM engine models and their related shipboard auxiliary systems. The support required will involve technical, logistics, training, administrative and program management efforts related to diesel engine lifecycle and in-service concerns. The contractor shall provide all services, personnel, facilities, expertise, technical information, special tools, supplies and incidental materials necessary to execute the performance requirements detailed in this SOW.
2.0 APPLICABLE DOCUMENTS
2.1 Applicable and reference documents will be specified at the individual task order level.
3.0 REQUIREMENTS
Within the scope of this BOA, the contractor shall provide all labor, supplies, services, materials, expertise, information, special tools, procedures and facilities necessary to support NSWCPD’s mission as LCM and ISEA for US Navy Diesel Engines. The proposed BOA will be utilized for procurement of the following services:
3.1 Engineering & Technical Services - The contractor shall provide engineered solutions to existing problems. Engineering & technical services expected to be supplied on this BOA include:
· technical issue resolution
· owners group meetings
· engineering investigations
· failure analysis, root cause determination and associated light repairs
· product improvements (design, development, testing & evaluation, and deployment),
· new technology development and integration
· technical documentation product development, revision and update
· land-based and shipboard testing and evaluation.
· field technical service support, in conjunction with engineering efforts and taskings
3.2 Logistics Support Services - The contractor shall provide necessary product line expertise and information necessary to support the development, updating and revision of various Navy logistics products, including:
· engine configuration management and associated Allowance Parts Lists (APLs)
· parts and sub-assembly provisioning
· technical manuals
· planned maintenance system (PMS) procedures
· maintenance standards
· drawings
· parts stocking and availability
3.3 Engine and Control System Training Services – The contractor shall provide training services in support of customer requirements. Training services include providing seats/space in existing training courses as well as the development of new training curriculum and courses as identified by the customer. Training shall be conducted in fleet concentration areas when specified. Training dates shall be coordinated by the contractor and customer.
3.4 Program Management Services – The contractor shall provide program management services in support of the efforts included in the scope of this BOA. Program management duties and tasks will include, but are not limited to: BOA management, budgeting, scheduling, planning, executing, prioritizing, progress tracking (task and financial), and planning of tasks, projects and programs. The Program manager shall be well versed in Government contract management and administration, including funding allocation (CLINs and SLINs), invoicing and supporting documentation, and manpower reporting.
3.5 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components – The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
4.0 DELIVERABLES AND DATA REQUIREMENTS
4.1 General
All products, documentation, data files and masters for products/reports etc. developed to support this requirement are the property of the Government and shall be turned over to NSWCPD upon request or at the completion of the order. Deliverables shall be developed and submitted in accordance with the Contract Data Requirements Lists (CDRLs) and the specific requirements of each Task Instruction or Order. Both electronic and hard copy deliverables may be required. Work products shall be submitted in media (e.g., DOC, XLS, PDF, etc.) as mutually agreed upon prior to submission. Unless otherwise specified, deliverable products may be in contractor format.
4.2 Acceptance Criteria
Final inspection and acceptance of all work, reports, and other deliverables will be performed by the Government Subject Matter Expert (SME) at the place of delivery. General quality measures, as set forth below, will be applied to each work product delivered under this statement of work.
4.2.1 Accuracy - Deliverables shall be accurate in presentation, technical content, and adherence to accepted elements of style.
4.2.2 Clarity – Deliverables shall be clear and concise. Any/all diagrams/text shall be easy to understand and be relevant to the supporting narrative.
4.2.3 Consistency to Requirements - All deliverables must satisfy the general requirements of this statement of work as well as the specific requirements of each Task Order.
4.2.4 File Editing - All electronic text and diagrammatic files shall be editable by the Government unless otherwise agreed.
4.2.5 Timeliness - Deliverables shall be submitted on or before the due date specified by the Government.
4.3 The contractor shall provide the following deliverables during the execution of this BOA. The specific requirements for each deliverable are provided in applicable CDRLs.
4.3.1 Contract Status Report (CDRL A001)
4.3.1.1 The contractor shall provide a status report which shall briefly describe the work performed during each reporting period together with significant results thereof. This report will describe any problems encountered and propose solutions for their resolution. The report shall further provide the current technical and financial status of the effort. Informal appendices shall be included as necessary or required in the scope of work. Any subcontractor technical progress shall be reported separately as attachments to the contractor’s progress report. The reporting frequency may be Weekly, Bi-Weekly, or Monthly, and will be defined at the task order level.
4.3.1.2 This report shall reflect both prime and subcontractor data, if applicable, and at the same level of detail.
4.3.1.3 Submission of this CDRL shall be done via electronic mail to the Contracting Officer’s Representative (COR) and the Subject Matter Expert (SME) no later than the 15th day of each month and shall report on status and progress made during the previous month.. While the Contractor’s format is acceptable, the Government’s approval must be received in writing from the COR within 5 business days before formal submission.
4.3.2 Travel Report (CDRL A002)
4.3.2.1 The contractor shall develop and submit a report for each trip or travel occurrence conducted in support of this BOA. Trip reports shall include sufficient information from the trip or travel occurrence as is necessary to effectively communicate the details and results from the travel conducted. At a minimum, each trip report shall include the following information:
· Trip Purpose
· Place(s) visited
· Contractor personnel making trip
· Personnel contacted
· Travel dates
· Background
· As-found conditions & Observations
· Actions Taken
· Conclusions & recommendations
4.3.2.2 This report shall reflect both prime and subcontractor data, if applicable, at the same level of detail. Submission of this CDRL shall be done via electronic mail to the COR and SME. Travel reports shall be submitted no later than 10 business days after completion of each trip. While the Contractor’s format is acceptable, the Government’s approval must be received in writing from the COR within 5 business days before formal submission.
4.3.3 Project Planning Chart (CDRL A003)
4.3.3.1 The contractor shall develop and submit a Project Planning Chart for each task order assigned under this BOA. The Project Planning Chart shall graphically depict the schedule and actual progress of work on a specific task order. The Project Planning Chart shall contain the following information at a minimum:
· Contract and Task Order Number
· Task Order Period of Performance
· Task Critical Milestones
· Project Tasks and Subtasks, rolled up to the milestone level
· Scheduled and Actual Starting Dates for each task and subtask
· Scheduled and Actual Completion Dates for each task and subtask
· Duration for each task and subtask
· Predecessor/successor relationship for each task and subtask
· Percentage complete for each task, subtask, milestone and for the overall task order
4.3.3.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.3.3.3 Submission of this CDRL shall be done via electronic mail to the Contracting Officer’s Representative (COR) and the Subject Matter Expert (SME) no later than the 15th day of each month. While the Contractor’s format is acceptable, the Government’s approval must be received in writing from the COR within 5 business days before formal submission.
| 4.3.4 | Technical Reports (CDRL A004) |
| 4.3.4.1 | All other deliverables and data items submitted as part of this BOA shall be submitted as technical reports. The format of each technical report shall be mutually agreed to prior to first submission. Each technical report shall contain a cover letter describing the contents of the deliverable, and shall contain a unique identifier which references the task instruction number, unique deliverable serial number, date of submission and revision (if applicable). |
4.3.4.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.3.4.3 Submission of the CDRL shall be done via electronic mail to the Contracting Officer’s Representative (COR) and the Subject Matter Expert (SME) no later than the 15th day of each month. While the Contractor’s format is acceptable, the Government’s approval must be received in writing from the COR within 5 business days before formal submission.
4.3.5 Government Furnished Property (GFP) Inventory Baseline Report (CDRL A005)
4.3.5.1 The GFP Inventory Baseline Report is required when GFP is provided.
4.3.5.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.3.6 Government Furnished Property (GFP) Inventory Periodic Report (CDRL A006)
4.3.6.1 The GFP Inventory Periodic Report is required as a follow-on to the GFP Inventory Baseline Report, when applicable.
4.3.6.1 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
4.3.7 Government Furnished Property Inventory Final Report (CDRL A007)
4.3.7.1 The GFP Inventory Final Report is required as a follow-on to the GFP Inventory Baseline Report, when applicable.
4.3.7.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.
5.0 SECURITY REQUIREMENTS
5.1 SECURITY TRAINING: The Contractor is responsible for completing all required Government mandated training to maintain security and network access to government sites and IT systems to include but not limited to: Antiterrorism Level 1 Awareness; Records Management in the DON: Everyone's Responsibility; Training and Readiness: The Active Shooter; NAVSEA Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness Training; NAVSEA Physical Security training and Cybersecurity 101 Training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the BOA.
5.1.1 In accordance with the National Industrial Security Program Operating Manual (NISPOM) (37 CFR Part 117), Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site require an open investigation or favorable adjudicated Tier 3 investigation. An interim clearance is granted by DCSA and recorded in the Defense Information System for Security (DISS). Must have a favorable fingerprint an open or closed investigation with a favorable adjudication in DISS is required prior to issuance of a badge providing access to NSWCPD buildings. Furthermore, if the Navy Central Adjudication Facility has made an unfavorable determination, access will be denied. For Common Access Card (CAC) you must have an open investigation and/or a favorably adjudicated investigation. Interim security clearance is acceptable for a CAC. Access will be denied for anyone that has eligibility pending in DISS. Vetting through the National Crime Information Center, Sex Offender Registry, and the Terrorist screening database shall be process for a contractor that does not have a favorable adjudicated investigation.
5.1.2 Within 30 days after BOA award, the contractor shall submit a list of all contractor personnel, including subcontractor employees, who will have access to DON information systems and/or work on-site at one of the NSWCPD sites to the appointed Contracting Officer Representative (COR) via email. The contractor shall provide each employee's first name, last name, contract number, the NSWCPD technical code, work location, whether or not the employee has a CAC and or Standard Access Control Badge (SACB), the systems the employee can access (i.e., NMCI, RDT&E), and the name of the Contractor's local point of contact, phone number and email address. Throughout the period of performance of the BOA, the Contractor shall immediately provide any updated information to the COR when any Contractor personnel changes occur including substitutions or departures.
5.2 ON SITE WORK: Contractor personnel that require a badge to work on-site at one of the NSWCPD sites must provide an I-9 form to verify proof of citizenship. The I-9 form should be signed by the company Facility Security Officer or the company Human Resource Department. In addition to the I-9 form, Contractors shall also bring their birth certificate, current United States Passport or naturalization certificate and state issued REAL ID to the NSWCPD Security Officer at the time of badge request to verify citizenship. Any contractor that has unfavorable information that has not been favorably adjudicated, by Department of Defense Central Adjudication Facility (DOD CAF) will not be issued a badge. Finally, contractors shall supply a copy of their OPSEC Training Certificate or other proof that the training has been completed.
5.3 DD254 REQUIREMENT: This effort requires access to classified information up to the SECRET level. No classified data will be generated or stored by the Contractor. The Contractor is required to have and maintain SECRET clearances for personnel who may access classified areas, such that personnel access to government facilities and ships is not delayed. The requirements of the attached DD Form 254 apply (see Section J of the BOA).
5.3.1 The contractor is required to maintain a Facility Security Clearance (FCL) in accordance with the DD254 to perform certain work under the BOA. Although it is not required at time of award, it shall be obtained within 90 DAYS after award. Otherwise, the government will have no obligation to continue ordering work under the BOA and may not exercise any of the available options.
5.3.2 The Contractor shall appoint a Facility Security Officer (FSO), who shall (1) be responsible for all security aspects of the work performed under this BOA, (2) assure compliance with the National Industrial Security Program Operating Manual (NISPOM) (32 CFR Part 117), and (3) assure compliance with any written instructions from the NSWCPD Security Office, Code 1051.
5.3.3 Contractor must submit a flow down request for sharing of classified and other sensitive information between prime and subcontracts in writing to the COR and Security Contracting Officer (SCO), louise.r.brunson.civ@us.navy.mil. Each request must reference a contract number identifying the specific information for which approval is sought, a justification for needing to share the information, the contractor’s name and its contract number under which the requested information will be shared.
5.3.4 The contractor shall forward signed copies of DD254s provided to subcontractors to the Naval Surface Warfare Center Philadelphia Division (NSWCPD), ATTN: Security.
5.3.5 The contractor shall direct the subcontractor to obtain approval, through the prime Contractor, for the public release of information received or generated by the sub through the prime Contractor.
5.3.6 The contractor shall submit the subcontractor request for public release through the technical point of contact identified on the DD 254.
Additional information related to the facility clearance process can be obtained by visiting www.dss.mil or http://www.dss.mil/isec/pcl_index.htm.
5.4 OPERATIONS SECURITY (OPSEC)
5.4.1 The Contractor shall protect critical information associated with this BOA to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted. Performance under this BOA requires the contractor to adhere to OPSEC requirements, which may include the NSWCPD Contractor OPSEC Plan. When the NSWCPD Contractor OPSEC Plan is required, the contractor shall return acknowledgment of the plan within 15 days of receipt. During the period of this BOA, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.
5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations. Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
5.4.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.
5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105).
5.4.5 This SOW has been reviewed against the requirements of SECNAVINST 4200.35. SAIRC controls are not required.
5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI): All Controlled Unclassified Information (CUI) associated with this BOA must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this BOA by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
6.0 PLACE OF PERFORMANCE
6.1 The primary place of performance will be at the Contractor’s facilities unless otherwise stated in a task order to be performed at a government site. Periodic travel to fleet concentration areas in the continental United States (CONUS), and shipboard locations outside of the continental United States (OCONUS) is anticipated. It is estimated that 90% of the work will occur at the contractor’s facilities and 10% of the work will occur shipboard and/or at ship homeport locations. Only as-needed work will be performed at locations other than the Contractor’s facilities, either via local site visits or formal travel orders to remote locations.
7.0 TRAVEL
7.1 While the majority of work will be performed at the Contractor’s site(s), the Contractor will be required to attend meetings and perform visits in the performance of the various tasks assigned under this BOA at the task order level. Such visits will be to Navy activities, ships, industrial areas, and the facilities of other contractors, corporations and businesses associated with each particular task. Ships visits may be accomplished during industrial repair availabilities and may require isolated underway periods. Anticipated travel locations include various CONUS and OCONUS locations, including but not limited to: Philadelphia, PA, Mayport, FL, San Diego, CA, Puerto Rico, and Bahrain. Notional travel requirements for the entire BOA period of performance are detailed in Table 1. The contractor shall make their own travel arrangements and process their own clearance data/messages required for admission to appropriate facilities.
| Location |
| Trip Purpose |
| Number of Individuals |
| Number of Days |
| Number of Trips |
| Philadelphia, PA |
| Informational meetings |
| 2 |
| 5 |
| 5 |
| Mayport, FL |
| Owners Group meetings/Technical Support |
| 2 |
| 5 |
| 10 |
Table 1 – Estimated Travel Requirements
7.2 The frequency and duration of travel required will be determined by the contractor at the task order level. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements. Since all task orders will be firm-fixed price, the contractor should include costs associated with travel in each task order quote or pricing proposal.
7.3 All travel shall be conducted in accordance with FAR 31.205-46 - Travel Costs and B-231-H001 - Travel Costs (NAVSEA) and shall be pre-approved by the COR. The Contractor shall submit travel reports in accordance with the requirements of CDRL A002.
7.4 Travel Costs: The current maximum per diem rates are set forth in: (i) Federal Travel Regulations for travel in the Continental United States; (ii) Joint Travel Regulations for overseas non-foreign areas (e.g. Alaska, Hawaii, Guam, Puerto Rico, etc.); and (iii) Department of State-prescribed rates for foreign overseas locations.
8.0 GOVERNMENT FURNISHED PROPERTY (GFP)
8.1 GFP may be required for completion of tasks under this BOA. All Government Furnished Property is property of the U.S. Government and shall not be transferred to any individual or agency, public or private, without the express written approval of the originating Contracting Officer.. Accountability for Government Property under this BOA shall be managed in accordance with FAR Part 45 and DFARS Part 245 as well as the Government Property clauses in the Task Order, regardless of whether the property is Contractor Acquired Property (CAP), GFP, or received directly from another commercial source as a deliverable from a Government issued contract.
8.2 Additional Government Property accountability requirements are outlined in the following Directives and Instructions and shall be adhered to as applicable:
· DODI 4161.02, Accountability & Management of Government Contract Property
· DoDM 4140.01, DoD Supply Chain Material Management Procedures: Material Returns, Retention and Disposition
· DODI 5000.64, Accountability & Management of DoD Equipment and Other Accountable Property
· OPNAVINST 4440.26B, Operating Materials & Supplies and Government Furnished Material Management
· SECNAVINST 5200.43A, Property Management
GFP, when applicable, will be identified at the individual task order level.
8.1 Reporting: The Contractor shall perform reporting functions and actions to maintain an accurate accounting of property. Receipt Reporting: DFARS 252.245-7005 “Management and Reporting of Government Property” requires the Contractor to report receipt of all GFP using the PIEE GFP Module, regardless of whether the Government has submitted a PIEE electronic shipment.
8.2 Shipping Notification: FAR 52.245-1 “Government Property” (including Alternates 1 & 2) requires the Contractor to report when GFP is returned to the Government. DFARS 252.245-7005 requires this notification be in the form of an electronic shipment through the GFP Module in PIEE. A DD Form 1149 shall accompany all Government property shipped between the Government and the Contractor using a third party, such as UPS, FedEx, or USPS. The DD 1149 does not take the place of the PIEE shipment. It is a requirement in addition to the PIEE shipment
8.3 Inventory Reporting: FAR 52.245-1 requires the Contractor to periodically perform, record, and disclose physical inventory results. While the FAR clause does not define “periodically,” SECNAVINST 5200.43A requires on-hand inventory count reports to support property type specific inventory requirements as set forth in their respective governing instructions. The contractor shall provide an inventory report in accordance with CDRLs A005, A006 and A007. These CDRLs outline the frequency of reporting based on property type per contract needs. When the Contractor has never received any GFP, the Contractor shall annually certify to the Procuring Contracting Officer (PCO) via email, with the Contracting Officer's Representative (COR) and Technical Point of Contact (TPOC) Cc'd, that it does not have any GFP. The Contractor shall also provide support within a reasonable timeframe after any Government request (to include by DoD support agencies such as DCMA) to support any Government audit in which GFP, or its related documentation, is requested as part of normal audit processes.
8.4 Lost, Damaged or Stolen GFP Reporting: FAR clause 52.245-1 requires the Contractor to investigate and report to the Government all incidents of property loss as soon as the facts become known. DFARS 252.245-7005 “Management and Reporting of Government Property” further requires the Contractor to report lost, damaged or stolen Government property using the Property Loss functionality within the PIEE GFP Module. The Contractor shall support the Government’s process to assign liability and document loss in support of lost, damaged or stolen GFP.
8.5 Excess Property Reporting: In accordance with Clause 52.245-1 paragraph (f)(viii)(A), the Contractor shall promptly disclose to the COR via email, with the TPOC and PCO Cc'd, Government property in its possession that is excess to contract performance. This reporting requirement also applies to excessive CAP, which must also be disclosed as soon as the material is identified as excessive.
8.6 Loss of Government Property: Lost, damaged or stolen GFP shall be processed in accordance with the processes in Clause 52.245-1.
8.7 Property Management and Use: The Contractor shall perform property management in accordance with Clause 52.245-1.
8.8 Subcontractor Requirements: In accordance with Clause 52.245-1, the Contractor shall award subcontracts that clearly identify Government property that will be provided and the extent of any restrictions or limitations on their use. The Contractor shall also ensure appropriate flow down of contract terms, conditions and all relevant contractual information to all subcontractors who will use GFP. This includes dissemination of all information necessary for the subcontractor to properly track GFP in their property management system, such as the contract/order number, the serial management requirements and unit acquisition cost(s). It is the Contractor's responsibility to assure that subcontracts are properly administered and periodically reviewed for compliance.
8.9 Contractor Acquired Property (CAP): All CAP is titled to the Government and shall be treated to the same standard as GFP. CAP may be bought back by the Contractor in accordance with Clause 52.245-1. All CAP not bought back by the Contractor shall be processed following PCO or Property Administrator (PA) (if assigned) instructions in the PIEE GFP Module.
8.10 Property Disposition: All GFP shall be dispositioned to the Government as soon as it becomes excessive to contract performance unless otherwise directed in writing by the PCO or Property Administrator. GFP may be dispositioned by being returned to the Government, having custodianship transferred to another contract, having the item(s) scrapped, processing the item(s) through Plant Clearance, or abandoning the property with the Contractor. Regardless of the method, all Government Property shall be processed by the end of contract PoP. Disposition shall be processed as instructed by the PCO, COR (if delegated), PA (if assigned), and Plant Clearance Officer (PLCO) (if assigned) following the guidance provided in accordance with Clause 52.245-1 paragraph (j) (including Alternates 1 & 2) and Clause 252.245-7005.
8.10.1 Property disposition instructions, when applicable, will be provided at the individual task order level.
8.10.2 Issuance of the DD 1149 “Requisition and Invoice/Shipping Document”: The contractor must obtain a DD1149 before removing any Government Furnished Property, including Plant, Property, and Equipment (PP&E) from NSWCPD premises for general use. For situations where the contractor picks up/replaces NSWCPD property for maintenance purposes, the contractor shall provide an equipment receipt, showing Manufacturer, Model/Part Number, Serial Number and Asset Number/Barcode, on their company letterhead to the COR. Any and all GFP returned to the Government shall include a DD 1149 to document transfer of liability back to the Government.
8.11 Property Tagging: The contractor can either tag issued equipment or use the provided NSWCPD Plant property barcodes, or NMCI asset tags. If the contractor chooses to use their own tag, it shall not cover the NSWCPD barcode, or NMCI asset tag. The NSWCPD barcode, and/or NMCI asset tag number, when provided shall be used on contractor inventory reports.
8.12 Property Closeout: IAW FAR 52.245-1, the Contractor shall promptly perform and report to the PCO or plant clearance officer (dependent on who is administering the contract) contract property closeout to include reporting, investigating and securing closure of all loss of Government property cases; physically inventorying all property upon termination or completion of this Contract/TO; and disposing of items at the time they are determined to be excess to contractual needs.
9.0 GOVERNMENT FURNISHED INFORMATION
9.1 GFI may be provided to the contractor at the TO level when necessary and pertinent to the subject of the individual TO.
9.2 GFI is for informational purposes and use by the Contractor is optional.
10.0 COUNTERFEIT MATERIAL PREVENTION
10.1 Non-Electronic Materiel
10.1.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
· If the materiel is currently in production or currently available, solicitations shall require the materiel to be obtained only from authorized suppliers.
· If the materiel is not in production or currently available from authorized suppliers, solicitations shall require the materiel to be obtained from suppliers that meet appropriate counterfeit avoidance criteria.
· The contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier.
· The contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier.
· The contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the Government Industry Data Exchange Program (GIDEP) as soon as the contractor becomes aware of the issue.
11.0 PERSONNEL
11.1 The contractor shall be responsible for the employment of trained and technically qualified personnel to perform the technical efforts described herein. In addition, the contractor is responsible for organizational and administrative controls necessary to ensure that performance meets or exceeds all specification requirements and those set forth in the BOA.
11.2 The Government reserves the right, during the life of this BOA, to request work histories on any contractor employees for the purposes of verifying compliance with this requirement. Personnel assigned to or utilized by the contractor in the performance of this BOA shall be fully capable of performing the contemplated functions of the respective labor categories in an efficient, reliable and professional manner.
11.3 If the contracting officer questions the qualifications or competence of any person performing under the BOA, the burden shall be on the contractor to confirm that the person in question is qualified as prescribed herein.
11.4 All persons with a reasonable expectation of conducting shipboard visits in support of engineering, technical, logistics and training efforts shall, at the time of proposal submission, be U.S. citizens possessing a favorable Defense Counterintelligence and Security Agency (DCSA) adjudication or hold an active Defense Biometric Identification System (DBIDS) credential.