Monobloc Propeller Procurement SOW (Draft).docx

DOCX document 70 KB Posted

Attached to
Monobloc Propeller Procurement Federal contract opportunity
Solicitation number
N64498-24-RFPREQ-PD-42-0235
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is a Statement of Work (SOW) for the manufacture of U.S. Navy Monobloc Propellers and Propeller Caps for CVN-77, DDG-1000, LHD-1, and LCC-19 ship classes. The contractor must manufacture eight specific items including port and starboard monobloc propellers for CVN-77 and DDG-1000, as well as propeller caps for CVN-77, DDG-1000, LHD-1, and LCC-19 vessels. The work involves manufacturing these components according to detailed engineering specifications, conducting various inspections and tests (visual, dimensional, non-destructive), and proper preservation, packaging and shipping of finished products.

The contractor must maintain specific personnel qualifications including NAVSEA-certified propeller inspectors, qualified welders with approved procedures, and certified NDT personnel for magnetic particle, liquid penetrant, ultrasonic, and visual testing. The work requires a quality management system compliant with ASQ/ANSI/ISO 9001 standards. The contractor will perform work primarily at their facility, with no travel required. Access to classified information up to the CONFIDENTIAL level may be needed, requiring appropriate facility clearance. Monthly status reports and inventory tracking of government furnished property are required deliverables. The SOW includes detailed requirements for security protocols, handling of controlled unclassified information, and proper documentation of all manufacturing and inspection processes.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW for Procurement of Monobloc Propellers and Caps

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 42, which is responsible for U.S. Navy Ship Propulsion Systems

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i)Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii)Countermand any communication regarded as a violation,
(iii)Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv)In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

1.1.1 The Propulsion Systems Division, Code 42, of the Naval Surface Warfare Center, Philadelphia Division (NSWCPD), is responsible for maintaining a ready-for-issue rotatable pool of propeller assets for Fixed Pitch Propellers

1.2 SCOPE OF WORK

1.2.1 List of Common Acronyms

1.2.1.1 CDRL – Contract Data Requirements List

1.2.1.2 CLIN – Contract Line Item Number

1.2.1.3 GFP – Government Furnished Property

1.2.1.4 IUID – Item Unique Identification

1.2.1.5 MT – Magnetic Particle Testing

1.2.1.6 NSN – National Stock Number

1.2.1.7 NDT – Non-Destructive Testing

1.2.1.8 PT – Penetrant Testing

1.2.1.9 QMS – Quality Management System

1.2.1.10 RFV – Request For Variance

1.2.1.11 SOW – Statement of Work

1.2.1.12 TPOC – Technical Point of Contact

1.2.1.13 UT – Ultrasonic Testing

1.2.1.14 VT – Visual Testing

1.2.1.15 VPI – Visual Preservation Inspection

1.2.1.16 VTI – Visual Technical Inspection

1.2.1.17 WAWF – Wide Area Work Flow

1.2.1.18 WPQ – Welder Performance Qualifications

1.2.2 The Scope of this contract is to manufacture the following U.S. Navy Propellers and Caps.

Item #
Assembly
Install
Ship Class
NSN
0001
Monobloc Propeller
Port
CVN-77
2010-01-502-6309
0002
Monobloc Propeller
Stbd
CVN-77
2010-01-502-6310
0003
Monobloc Propeller
Port
DDG-1000
2010-01-543-5769
0004
Monobloc Propeller
Stbd
DDG-1000
2010-01-543-5760
0005
Propeller Cap
--
CVN-77
2010-LL-HAL-4652
0006
Propeller Cap
--
DDG-1000
2010-01-549-2696
0007
Propeller Cap
--
LHD-1
2010-LL-HAL-2798
0008
Propeller Cap
--
LCC-19
N/A

2.0 APPLICABLE DOCUMENTS

Ref
Document Number
Document Title
Rev
Date
Dist
A
ASQ/ANSI/ISO 9001
Quality Management Systems – Requirements
--
Sep-2015
--
B
DODM 4140.65
Wood Packaging Material WPM_151007
--
Aug-2012
--
C
DOD-STD-2185
Requirements for Repair and Straightening of Bronze Naval Ship Props
--
Oct-1986
A
D
DD Form 1694
Request for Variance (RFV)
--
Apr-2017
--
E
MIL-DTL-2845
Preservation, Packaging, Packing, and Storage of Propulsion Systems
E
Aug-1999
A
F
MIL-STD-2073-1E
DoD Standard Practice for Military Packaging
--
Nov-2018
--
G
MIL-STD-130
DoD Standard Practice, Identification Marking of U.S. Military Property

Nov-2012

A

H
NAVSEA S9245-AR-TSM-010/PROP
Marine Propeller Inspection, Repair, and Certification
3
Dec-2012
C
I
NAVSEA S9074-AR-GIB-010/278
Requirements For Fabrication Welding and Inspection and Casting inspection
0
Feb-2013
A
J
NAVSEA S9074-AQ-GIB-010/248
Requirements for Welding and Brazing Procedure and Performance Qualification
1
Nov-2019
A
K
NAVSEA T9074-AS-GIB-010/271
Requirements for Non Destructive Testing Methods
1
Sep-2014
A
L
NAVSEA 9243/2
Plug and Ring Gage Visual Inspection
--
Sep-1993
--
M
NAVSEA 9245/1
Propeller and Propulsor Major Sub Assembly Certification
--
Aug-2023
--
N
NAVSEA 9245/2
Propeller and Propulsor Major Sub Assembly Visual Preservation Inspection (VPI)
--
Mar-2016
--
O
NAVSEA 245/3
Propeller Visual Technical Inspection (VTI)
--
Apr-2020
--
P
NAVSEA 9245/4
Propeller Dimensional Inspection
--
Mar-2006
--
Q
NAVSEA 9245/6
Blade Gage Visual Inspection
--
May-2003
--
R
NAVSEA 203-7501574
CVN-77 Propeller & Cap
D
May-2013
C
S
NAVSEA 245-7651126
DDG-1000 Propeller & Cap
C
Mar-2014
CLAS
T
NAVSEA 203-4522379
LHD-1 Propeller & Cap
D
Mar-1994
D
U
NAVSEA 203-2500352
LCC-19 Propeller & Cap
B
Dec-1966
C

2.1 The Contractor shall reference and utilize the latest version available when performing tasks within this SOW.

2.2 In the event of a conflict between the text of this document and the references and/or drawings, the text of this document shall take precedence. Nothing in this document, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

2.3 If during the performance of this contract the Contractor believes that the contract contains outdated or different versions of any specifications or standards, the Contractor may request that the contract be updated to include the current version of the applicable specification or standard. The Contractor should submit update requests to the Contracting Officer for approval. The Contractor shall perform the contract in accordance with the existing specifications and standards until notified by the Contracting Officer of the disposition of the request. Any approved alternate or updated specifications and standards will be incorporated into the contract.

3.0. REQUIREMENTS

3.1 GENERAL

3.1.1 Unless otherwise specified, the Contractor is responsible for the performance of all work requirements herein. The Contractor may use its own or any other facilities suitable for the performance of the work specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

3.1.2 Visitations by the government. Visits by US Navy personnel will be coordinated with the Contractor based on appropriate production milestones, or when the Government deems such a visit appropriate. The Government reserves the right to conduct a facility audit at any time during the Contract period of performance.

3.2 MANUFACTURE OF MONOBLOCS AND CAPS

3.2.1 For the duration of any order involving these CLINs, submit a monthly status update, in accordance with CDRL A001.

3.2.2 For the duration of any order involving these CLINs, submit a monthly GFP inventory report in accordance with CDRL A004.

3.2.3 Monobloc propellers, and caps shall be procured in accordance with the latest revision of the applicable engineering drawing(s) identified in Section 2.0 and in accordance with Reference H.

3.2.3.1 This includes the following items and items that are within the accessory box such as (where applicable):

· Gland Ring

· Lifting Eyebolts (FWD/AFT)

· Lifting Eyebolt (SIDE)

· Lifting Eyebolt Hole Plugs (FWD)

· Lifting Eyebolt Hole Plug (SIDE)

· Fill/Vent Hole Plugs

· Cap Studs

· Cap Stud Nuts

· Gland Studs

· Gland Stud Nuts

· Filler Guide Blocks

· Hub End Plate

· Cap Cover Plates

· Cap Eyebolt hole plug

· Cap Baffle Plate (if applicable)

· Cap Cover plate fasteners

· Cap fill/vent plugs

· Cap eyebolt

· Foam (if applicable)

· Balance weight(s) (if applicable)

3.2.4 If repairs are required during manufacture, the Contractor shall obtain advance approval from the TPOC prior to beginning any work. Complete all approved repairs in accordance with Reference C and Reference H, unless otherwise authorized by the TPOC.

3.2.4.1 A final inspection record for each repair shall include all items identified in Reference C Para 6.3 at minimum. Document inspection results in contractor format and submit in accordance with CDRL A002.

3.2.5 Within two weeks of receipt of each GFP blade gage set or plug gage complete a pre-manufacture visual inspection in accordance with Reference H. Inspection results shall be documented using Reference L and Reference Q and submitted in accordance with CDRL A002.

3.2.6 Complete a post-manufacture PT-aided VTI of the monobloc or cap in accordance with Reference H. Inspection results shall be documented using Reference O and submitted in accordance with CDRL A002.

3.2.7 Complete a post-manufacture dimensional inspection of the monobloc or cap in accordance with Reference H. Inspection results shall be documented using Reference P and submitted in accordance with CDRL A002.

3.2.7.1 If the Contractor is using a TPOC-approved digital inspection system for propeller dimensional inspections in Section 14.5, the inspection results shall alternatively be documented in the report format authorized in the ISCP.

3.2.8 Document applicable RFVs using Reference D and submit in accordance with CDRL A003.

3.2.9 Upon approval of the post-manufacture VTI and dimensional inspection reports in WAWF, preserve, package, crate, and mark the monobloc or cap in accordance with Reference B, Reference E, Reference F.

3.2.9.1The contractor is approved to comply with IUID requirements by applying one (1) Reference G compliant adhesive IUID label to each CPP monobloc or cap where the stamping information is located.
3.2.9.2Contractor Shall attach accessory box to one of the blades to ensure safe transit and no damage to the blade/preservation.
3.2.9.3Stamp data on Monoblocs shall be:

· A. SN [XXXXX]

· B. DN [NAVSEA drawing number and rev as indicated on existing stamping]

· C. [SHIP CLASS]

· D. [PORT/STBD/CENTER, RH/LH]

· E. DES DIA [FT and IN]

· F. DES PITCH AT 0.70R [FT and IN]

· G. MFR [Name and Date]

· H. CN [full manufacture contract number]

· I. WT [actual weight after balance] LBS

· J. NSN [XXXX-XX-XXX-XXXX]

· K. MAT [material, alloy, and spec]

3.2.9.4 Stamp data on Caps shall be:

· SN [XXXXX]

· DN [DN and REV]

· NSN [XXXX-XX-XXX-XXXX]

· [SHIP CLASS]

· MFR [Name and Date]

· CN [full manufacture contract number]

· [As-stamped material]

· [As-stamped material spec]

· [Final weight ] LBS

3.2.10 Complete a post-manufacture VPI of the monobloc or cap in accordance with Reference H. Inspection results shall be documented using Reference N and submitted in accordance with CDRL A002.

3.2.11 Complete a post-manufacture visual inspection of each GFP blade gage set and plug gage used in accordance with Reference H. Inspection results shall be documented in accordance with Reference L and Reference Q and submitted in accordance with CDRL A002.

3.2.12 Document a certification document using Reference M and submit in accordance with CDRL A002.

3.2.13 Attach a signed copy of the VPI and certification document to the crate and/or blade (whichever is applicable) in a transparent, waterproof, greaseproof re-sealable bag in accordance with Reference E.

3.2.14 When directed, load the monobloc or cap onto the delivery truck.

3.2.15 All GFP shall be shipped to the destination(s) specified on the individual task order upon completion of work, unless otherwise specified.

3.3 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components

3.3.1The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.

4.0 DATA REQUIREMENTS

· CDRL A001, Contract Status Report

· CDRL A002, Test/Inspection Report

· Visual Inspection Reports (VPI, VTI, Other)

· Dimensional Inspection Reports

· Repair Inspection Reports

· Certification Documents

· CDRL A003, Request For Variance

· CDRL A004, Government Property Inventory Report (PERIODIC)

· CDRL A005, Government Property Inventory Report (FINAL)

· CDRL A006, Personnel Qualification Standard

· Propeller Inspection Personnel Documents

· Welding Procedures and Personnel Documents

· NDT Procedures and Personnel Documents

· Quality Management System Documents

· Digital Inspection System Certification Package

5.0 SECURITY REQUIREMENTS

5.1 SECURITY TRAINING. The Contractor is responsible for completing all required Government mandated training to maintain security and network access to government sites and IT systems to include but not limited to: Antiterrorism Level 1 Awareness; Records Management in the DON: Everyone's Responsibility; Training and Readiness: The Active Shooter; NAVSEA Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness Training; NAVSEA Physical Security training and Cybersecurity 101 Training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the contract.

5.1.1 In accordance with the National Industrial Security Program Operating Manual (NISPOM) (37 CFR Part 117), Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site require an open investigation or favorable adjudicated Tier 3 by the Vetting Risk Operations Center (VROC). An interim clearance is granted by VROC and recorded in the Defense Information System for Security (DISS). An open or closed investigation with a favorable adjudication is required prior to issuance of a badge providing access to NSWCPD buildings. Furthermore, if the Navy Central Adjudication Facility, have made an unfavorable determination access will be denied. For Common Access Card (CAC) you must have an open investigation and/or a favorably adjudicated investigation. Interim security clearance are acceptable for a CAC. Access will be denied for anyone that has eligibility pending in DISS. Vetting through the National Crime Information Center, Sex Offender Registry, and the Terrorist screening database shall be process for a contractor that does not have a favorable adjudicated investigation.

5.1.2 Within 30 days after contract award, the contractor shall submit a list of all contractor personnel, including subcontractor employees, who will have access to DON information systems and/or work on-site at one of the NSWCPD sites to the appointed Contracting Officer Representative (COR) via email. The contractor shall provide each employee's first name, last name, contract number, the NSWCPD technical code, work location, whether or not the employee has a CAC and or Standard Access Control Badge (SACB), the systems the employee can access (i.e., NMCI, RDT&E), and the name of the Contractor's local point of contact, phone number and email address. Throughout the period of performance of the contract, the Contractor shall immediately provide any updated information to the COR when any Contractor personnel changes occur including substitutions or departures.

5.2 ON SITE WORK. Contractor personnel that require a badge to work on-site at one of the NSWCPD sites must provide an I-9 form to verify proof of citizenship. The I-9 form should be signed by the company Facility Security Officer or the company Human Resource Department. In addition to the I-9 form, Contractors shall also bring their birth certificate, current United States Passport or naturalization certificate and state issued ID to the NSWCPD Security Officer at the time of badge request to verify citizenship. Any contractor that has unfavorable information that has not been favorably adjudicated, by Department of Defense Central Adjudication Facility (DOD CAF) will not be issued a badge. Finally, contractors shall supply a copy of their OPSEC Training Certificate or other proof that the training has been completed.

5.2.1 In accordance with NSWCPD security protocol, contractor employees who hold dual citizenship will not be granted security clearance to our facilities.

5.2.4 Reserved

5.3 This effort may require access to classified information up to the CONFIDENTIAL level. No classified data will be generated or stored by the Contractor. The Contractor is required to have and maintain a CONFIDENTIAL clearance. The requirements of the attached DD Form 254 apply.

5.3.1 The contractor is required to maintain a Facility Security Clearance (FCL) in accordance with the DD254 to perform certain work under the contract. Although it is not required at time of award, it shall be obtained within INSERT DAYS after award. Otherwise the government will have no obligation to continue ordering work under the contract and may not exercise any of the available options.

5.3.2 The Contractor shall appoint a Facility Security Officer (FSO), who shall (1) be responsible for all security aspects of the work performed under this contract, (2) assure compliance with the National Industrial Security Program Operating Manual (NISPOM) (32 CFR Part 117), and (3) assure compliance with any written instructions from the NSWCPD, Security Office.

5.3.3 The contractor shall forward signed copies of DD254s provided to subcontractors to the Naval Surface Warfare Center Philadelphia Division (NSWCPD), ATTN: Security.

5.3.4 The contractor shall direct the subcontractor to obtain approval, through the prime Contractor, for the public release of information received or generated by the sub through the prime Contractor.

5.3.5 The contractor shall submit the subcontractor request for public release through the technical point of contact identified on the DD 254.

Additional information related to the facility clearance process can be obtained by visiting www.dss.mil or http://www.dss.mil/isec/pcl_index.htm.

5.4 OPERATIONS SECURITY (OPSEC)

5.4.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements, which may include the NSWCPD Contractor OPSEC Plan. When the NSWCPD Contractor OPSEC Plan is required, the contractor shall return acknowledgment of the plan within 15 days of receipt. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.

5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.

5.4.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.

5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105).

5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI) All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.

5.6 PLANNING, PROGRAMMING, BUDGETING AND EXECUTION (PPBE) DATA.

When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non-Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.

5.7 U-NNPI SECURITY REQUIREMENTS

N/A

5.8 U-NNPI

N/A

6.0 PLACE OF PERFORMANCE

The Contractor’s primary place of performance shall be at the Contractor’s facility. It is estimated that 100% of the work will occur off-site at the Contractor’s facility.

7.0 TRAVEL

The Contractor is not required to travel from the primary performance location when supporting this requirement. It is estimated that the Contractor will not need to take any trips from the primary place of performance to any government facility.

8.0 GOVERNMENT FURNISHED PROPERTY

GFP is required for completion of tasks under this SOW. All Government Furnished Property is property of the U.S. Government and shall not be transferred to any individual or agency, public or private, without the express written approval of the originating Contracting Officer.. Accountability for Government Property under this task order shall be managed in accordance with FAR Part 45 and DFARS Part 245 as well as the Government Property clauses in the Task Order, regardless of whether the property is Contractor Acquired Property (CAP), GFP, or received directly from another commercial source as a deliverable from a Government issued contract.

Additional Government Property accountability requirements are outlined in the following Directives and Instructions and shall be adhered to as applicable:

· DODI 4161.02, Accountability & Management of Government Contract Property

· DoDM 4140.01, DoD Supply Chain Material Management Procedures: Material Returns, Retention and Disposition

· DODI 5000.64, Accountability & Management of DoD Equipment and Other Accountable Property

· OPNAVINST 4440.26B, Operating Materials & Supplies and Government Furnished Material Management

· SECNAVINST 5200.43A, Property Management

8.1 Reporting

The Contractor shall perform reporting functions and actions to maintain an accurate accounting of property. Receipt Reporting: DFARS 252.245-7005 “Management and Reporting of Government Property” requires the Contractor to report receipt of all GFP using the PIEE GFP Module.

8.2 Shipping Notification

FAR 52.245-1 requires the Contractor to report when GFP is returned to the Government. DFARS 252.245-7005 “Management and Reporting of Government Property” requires this notification be in the form of a shipment through the GFP Module in PIEE.

8.3 Inventory Reporting

FAR 52.245-1 requires the Contractor to periodically perform, record, and disclose physical inventory results. While the FAR clause does not define “periodically,” SECNAVINST 5200.43A requires on-hand inventory count reports to support property type specific inventory requirements as set forth in their respective governing instructions. The contractor shall provide an inventory report in accordance with CDRL X. The Government Property Inventory Report outlines the frequency of reporting based on property type per contract needs. If the contractor does not possess any GFP, the Government Property Inventory Report shall reflect no GFP on-hand as required on the reporting schedule.

The Contractor shall provide support within a reasonable time after the Government’s written request to support any Government audit in which GFP, or its related documentation, is requested as part of normal audit processes.

8.4 Lost, Damaged or Stolen GFP Reporting

FAR clause 52.245-1 requires the Contractor to investigate and report to the Government all incidents of property loss as soon as the facts become known. DFARS 252.245-7005 “Management and Reporting of Government Property” further requires the Contractor to report lost, damaged or stolen Government property using the Property Loss functionality within the PIEE GFP Module. The Contractor shall support the Government’s process to assign liability and document loss in support of lost, damaged or stolen GFP.

8.5 Excess Property Reporting

Per FAR 52.245-1, the Contractor shall promptly disclose and report Government property in its possession that is excess to contract performance.

8.6 Property Disposition

Government Property Distribution shall be in line with FAR 52.245-1(j) and DFARS 252.245-7005 “Management and Reporting of Government Property". The contractor shall provide a written notice to the Contracting Officer when property held under this contract has not been used in 100 calendar days. All General Equipment/assets provided as GFP shall be returned to the Government for disposition at the completion of its use unless otherwise directed in writing by the Contacting Officer or the Accountable Property Officer (dependent on who is administering the contract). The Contractor shall complete the plant clearance inventory schedule using the plant clearance capability of the GFP module of the PIEE to generate an electronic equivalent of the SF 1428, Inventory Disposal Schedule.

The contractor shall obtain PCO or plant clearance officer approval (dependent on who is administering the contract) prior to disposal of excess GFP/CAP after the contractor completes the plant clearance inventory schedule.

8.6.1 Property Disposition Instructions

N/A

8.6.2 Issuance of the DD 1149 “Requisition and Invoice/Shipping Document” The contractor must obtain a DD1149 before removing any Government Furnished Property, including Plant, Property, and Equipment (PP&E) from NSWCPD premises for general use. For situations where the contractor picks up/replaces NSWCPD property for maintenance purposes, the contractor shall provide an equipment receipt, showing Manufacturer, Model/Part Number, Serial Number and Asset Number/Barcode, on their company letterhead to the COR. Any and all GFP returned to the Government shall include a DD 1149 to document transfer of liability back to the Government.

8.7 Property Closeout. IAW FAR 52.245-1, the Contractor shall promptly perform and report to the PCO or plant clearance officer (dependent on who is administering the contract) contract property closeout to include reporting, investigating and securing closure of all loss of Government property cases; physically inventorying all property upon termination or completion of this Contract/TO; and disposing of items at the time they are determined to be excess to contractual needs.

8.8 Property Tagging:

The contractor can either tag issued equipment or use the provided NSWCPD Plant property barcodes, or NMCI asset tags. If the contractor chooses to use their own tag, it shall not cover the NSWCPD barcode, or NMCI asset tag. The NSWCPD barcode, and or NMCI asset tag number, when provided shall be used on contractor inventory reports.

9.0 GOVERNMENT FURNISHED INFORMATION

N/A

10.0 PURCHASES

N/A

11.0 COUNTERFEIT MATERIAL PREVENTION

N/A

12.0 PERSONNEL

N/A

13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (ECRAFT) SYSTEM

N/A

14.0 SPECIAL REQUIREMENTS

14.1 PROPELLER INSPECTION PERSONNEL

The Contractor shall have and maintain at minimum (1) personnel who has successfully completed both the NAVSEA Propeller Visual Inspection Course and the NAVSEA Propeller Certification Course.

Submit the following in accordance with CDRL A006:

· List of certified personnel for each course in the format below:

Name
Title
Visual Course
Certification Course
John Doe
Technician
X
Joe Smith
Engineer
X
X

· Copies of all propeller inspection certifications for each person.

If changes to this information are made during the period of performance of this contract, the Contractor is responsible for notifying the TPOC immediately.

The Government reserves the right to audit this list any point throughout this period of performance of this contract.

14.2 WELDING PROCEDURES AND PERSONNEL

The Contractor shall have and maintain NAVSEA approved welding procedures and at minimum, (1) personnel qualified for each procedure in accordance with Reference C, Reference I and Reference J.

Submit the following in accordance with CDRL A006:

· Copies of each applicable welding procedures

· Copies of NAVSEA approval letter for each weld procedure

· List of qualified personnel for each procedure in the format below:

Name
Title
WP1
WP2
WP3
John Doe
Welder
X
Jane Smith
Welder
X
X
Joe Smith
Welder
X

X

· Copies of all Welder Performance Qualifications (WPQ) for each person

If changes to this information are made during the period of performance of this contract, the Contractor is responsible for notifying the TPOC immediately.

The Government reserves the right to audit this list any point throughout the period of performance of this contract.

14.3 NDT PROCEDURES AND PERSONNEL

The Contractor shall have and maintain NAVSEA approved NDT procedures for Magnetic Particle Testing (MT), Liquid Penetrant Testing (PT), Ultrasonic Testing (UT), and Visual Testing (VT) and at minimum, (1) personnel qualified for each procedure in accordance with Reference K.

Submit the following in accordance with CDRL A006:

· Copies of each NDT procedure

· Copies of NAVSEA approval letter for each NDT procedure

· List of certified personnel for each procedure in the format below:

Name
Title
NDTP1
NDTP2
NDTP3
Jane Doe
Inspector
X
X
John Smith
Inspector
X

X

· Copies of all NDT certifications for each person

If changes to this information are made during the period of performance of this contract, the Contractor is responsible for notifying the TPOC immediately.

The Government reserves the right to audit this list any point throughout the period of performance of this contract.

14.4 QUALITY MANAGEMENT SYSTEM

The contractor shall have and maintain a quality management system (QMS) in accordance with Reference A. Proof of QMS compliance shall be submitted in accordance with CDRL A006. The Contractor shall notify the TPOC in writing if and when any changes are made to the QMS that may affect the ability to complete this SOW.

14.5 DIGITAL INSPECTION SYSTEM CERTIFICATION

In the event the Contractor opts to use digital inspection systems instead of physical inspection gages for the completion of monobloc, and cap dimensional inspections, an Inspection System Certification Package (ISCP) must be approved by the TPOC in accordance with Reference H prior to its use. ISCPs shall be documented in Contractor format and submitted in accordance with CDRL A006.