This document is an amendment to a federal solicitation for the production of Low Pressure Electrolyzer (LPE) units for submarine life support systems. The amendment aims to clarify and modify requirements from the original solicitation (N6449824R4063), including:
- Accepting step ladder pricing for CLINs 0002-0006 to provide the lowest pricing across possible contract award quantities.
- Changing the FOB term from Destination to Origin.
- Removing the requirement for DFARS 252.211-7003 on CLIN 0007 for technical data.
- Providing additional details and references for the technical requirements, including drawings, data requirements, and testing procedures.
- Extending the response date for the solicitation from April 19, 2024 to May 20, 2024.
- Adding the FAR 52.232-32 Performance-Based Payments clause.
The solicitation is for the procurement of 170 SCFH LPE units by the Naval Surface Warfare Center Philadelphia Division. The amendment provides clarification and modifications to the original requirements to facilitate a fair and economical procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Proposal (RFP) N6449824R4063.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
See Page 2.
1. CO NTRACT ID CODE P AGE OF P AGES
J 1 50
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY 16-Apr-2024
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer )(Signature of person authorized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X N6449824R4063
X 9B. DAT ED (SEE IT EM 11)
20-Mar-2024
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer X is ext ended, is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN
REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Apr -2024
CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0223, NICHOLAS SWANSON
NICHOLAS.SWANSON@NAVY.M IL
5001 SOUTH BROAD STREET, BUILDING 4
PHILADELPHIA PA 19112
N64498 7. AD MINISTERED BY (If other t han item 6)
4. REQUISITION/PU RCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
N6449824R4063
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of Amendment 0001 is to answer the following questions:
1. Page 3, CLINs 0002-0006 - Consistent with all prior solicitations for this item, please modify these CLINs to include price breaks of 1, 2, 3, 4 & 5 as pricing for this item is highly quantity sensitive. This change will ensure the Government receives the lowest pricing for all possible contract award options and will position NSWC to award contracts which are most economically advantageous to the Government (FAR 52.207-4). This change also provides the foundation for a clear and fair price evaluation.
Answer: Step Ladder Pricing will be accepted. See updated Section B.
2. Page 3, CLINs 0001-0007 - Please change FOB from Destination to Origin consistent with prior awards as there is no destination information in the solicitation and these items have historically shipped by way of TAC Codes.
Answer: FAR 52.247-34 F.O.B. Destination is removed and FAR 52.247-29 F.O.B. ORIGIN is added to all CLINs.
3. Page 6, CLIN 0007 - Remove note requiring DFARS 252.211-7003 as it is not applicable to
Technical Data.
Answer: This has been removed from CLIN 0007.
4. Page 13, Para 3.2.1.6 should also include reference to NAVSEA Drawing for the 688 Class SHIPALT TRID 5031K. The reference to 688 Class should also be included in the following paragraphs; Page 11, Para 3.2.1.1, Page 14, Para 3.2.2.5, Page 16, Para 3.2.7.2, including adding a figure for the 688 Class Configuration.
Answer: Reference not required in above sections.
5. Page 13, Para 3.2.1.6 -Please verify that the latest revision of NAVSEA Drawing 8181047 is REV A. If not, please provide, as it could not be located in the ASSIST database.
Answer: Confirm, Rev A is latest version.
6. Page 14, Para 3.2.2.6 - Appendix "A" has not been provided. Please confirm that there have been no changes to this document since Solicitation N64498-16-R-5003 or provide Appendix "A".
Answer: Confirm, Rev A is latest version.
7. Page 32, Para 3.7.7.2 & Para 3.7.7.6 -To improve clarity, add "If not waived" to the beginning of the last sentence of 3.7.7.2 and to the beginning of the first sentence of 3.7.7.6.
Answer: See revised Section C, Statement of Work.
8. Page 34, Para 4.1 - CDRL No. A001 through A045 have not been provided. Please provide CDRL details (DD FORM 1423) for CDRLs A001 through A045.
Answer: CDRLs are provided in this Amendment.
9. Page 34, Para 4.1 - CDRLs A040, A041, A043 & A044 should be deleted since they refer to the
LPE Simulator and the PLC based controller which have been removed from the Specification.
Answer: CDRLs A040, A041, & A043 have been removed and are reserved. A044 is still required.
10. Page 55, Inspection and Acceptance Terms - Please change "Inspect At" and "Accept At" for all CLINS from Destination to Origin as Destinations have not been defined and Inspection and Acceptance is historically performed by the local QAR at the contractors facility.
Answer: See answer to Question 2.
11. Page 59, 52-247-34 F.O.B. Destination - Please remove F.O.B Destination and add F.O.B.
Origin as consistent with prior awards as there is no destination information in the solicitation and these items have historically shipped by way of TAC Codes.
12. Page 113, Attachments - Please provide Attachment 1 - Small Business Participation
Document (SBPCD).
Answer: Attachment 1 is provided in this Amendment.
13. Page 150, Para M.1 Basis For Award-Please change the Basis of Award to Technically Acceptable, Low Price as NSWC has previously established technical acceptability for two bidders. This source selection process is consistent with the previous solicitation and appropriate to achieve best value.
Answer: No changes will be made to Basis of Award.
14. Page 154, Price Evaluation -In the interest of fairness, clarity and affording consideration to all possible award scenarios, please change to "The proposed price for the Offer's proposal will be arrived at by multiplying the offered price for each quantity (1, 2, 3, 4 & 5) times the unit price for all quantities, and totaling the extended pricing for all CLINs and quantities".
Answer: See updates to Section M, Price Evaluation.
15. Page 154, Price Evaluation- Please change the last sentence to "As part of the price evaluation, the Government will evaluate any additional costs associated with ship alterations that may be required for installation of proposed units under this solicitation". Please also add "The Government's cost of testing the First Article will also be added to the price evaluation per page 155, M-209-H003, Para (d).
Answer: No changes will be made to sentence.
16. Page 155, M-209-H003 Waiver of First Article Requirements -As part of the proposal evaluation, the Government will evaluate information from each offeror as to whether waiver of first article testing for that offeror is warranted. However, since the waiver decision is scheduled to occur only after submission of alternate proposals (Offer A and Offer B) offerors will have to incur substantial effort and expense in developing pricing for first article manufacture, testing and qualification, even if none of those tasks are ever required.
We request that offerors be given the opportunity to provide their waiver qualification information, that information be evaluated, and a determination reached and communicated to each offeror in advance of the offer submission date. This will not entail any extra work by Government evaluators, since the waiver analysis is already a required step in the evaluation of offerors, nor is this task time consuming as it requires only confirmation by NAVSUP that First Article Requirements required have been previously satisfied. By providing an advance determination, NSWC will expedite the proposal and award process and eliminate wasted contractor effort to develop pricing that at the end of the day would not be needed should the waiver be granted.
For reference, please note that the effort to quote Offer A, which includes CLIN 0001 First Article, is a labor intensive task that will require pricing from approximately 87 vendors and from multiple qualification testing facilities. All for a task that the Government, in all likelihood, will not require Treadwell to complete and for which there is no reasonable expectation of business for the 87 vendors and multiple qualification testing facilities who would have to be asked to price this work.
In the interest of reasonableness, expediency and cost (in this case, compelling Treadwell to incur unnecessary time and expense) we ask that all bidders have the opportunity to receive pre-approval of their first article waiver requests. This would simply require the evaluators to perform the waiver analysis prior to the solicitation due date, rather than afterwards. This pre-approval step will eliminate unnecessary effort for those offerors that have already satisfied the First Article Requirement.
Answer: M-209-H003 is removed and M-209-H001 is added. The requirements outlined in clause M-209-H001 are clear on its face and necessary to meet the agency’s requirements.
17. Page 155, M-209-H003 Waiver of First Article Requirements, Para (b) - The solicitation states
"This solicitation contains separate delivery schedules for OFFER A and OFFER B." We are unable to locate separate delivery schedules. Please clarify.
Answer: See answer to Question 16.
18. Page 155, M-209-H003 Waiver of First Article Requirements, Para (d)-Please complete the dollar value in the sentence "For the purpose of making this evaluation, it is estimated that $_ will be the cost to the Government for first article testing."
Answer: See answer to Question 16.
19. Page 156-M-247-H00l F.O.B. Evaluation Criteria - Please remove this section or change to
F.O.B. Origin as consistent with prior awards.
20. Various paragraph references in the Technical Specification are incorrect.
• Page 12, Para 3.2.1.4 (a), "4.6.6.1" should be "3.7.6.4.1"
• Page 25, Para 3.7.4, "4.7.3" should be "3.7.7.3"
• Page 25 & 26, Table 1 & Table 2, all paragraph references in the "Test Paragraph" columns are incorrect
• Page 28, Para 3.7.6.4.6, "3.3.314(a)" should be "3.3.3.14"
• Page 31, Para 3.7.6.10, "4.6.8" should be "3. 7.6.6" and Para 3.7.7.1, "4.6.1 to 4.6.13" should be
"3.7.6.1 to 3.7.6.10"
• Page 32, Para 3.7.7.3, "4.7.4" should be "3.7.7.4" and Para 3.7.7.4, "4.7.3" should be "3.7.7.3"
• Page 33, Para 3.8.1.1, "5.1" should be "3.8.12"
Answer: See revised Section C, Statement of Work.
21. In order to prepare a seven volume proposal for CLINs 0002-0007, Treadwell will need to solicit pricing from 87 vendors for 610 part numbers totaling 2,680 parts per unit, all of which, for a five year contract award period. Additionally, we will need to prepare indirect rate forecasts for the contract performance period of 6 years and 3 months, assess all CDRL requirements, appropriately compile all data and prepare the required seven volume proposal. As such, we require an extension of 60 days (18 June 2024) to do so, assuming that NSWC is agreeable to add the note to CLIN 0001 above, allowing contractors to provide evidence that qualification requirements have been met, in lieu of providing pricing for this line item. Should NSWC not be agreeable to the addition of that note, we will require a 90-day extension (18 July 2024).
Answer: Response date is extended to 20 May 2024 at 1200.
22. Please add standard provisions for Performance-Based Payments or Progress Payments.
Answer: FAR 52.232-32 PERFORMANCE-BASED PAYMENTS clause is added.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 19-Apr-2024 12:00 PM to 20-May-2024 12:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The following stepladder pricing structure has been added:
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
LPE 0002 0.00 1.00
1.01 2.00
2.01 3.00
3.01 4.00
4.01 5.00
CLIN 0003
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
LPE 0003 0.00 1.00
1.01 2.00
2.01 3.00
CLIN 0004
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
LPE 0004 0.00 1.00
1.01 2.00
2.01 3.00
CLIN 0005
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
LPE 0005 0.00 1.00
1.01 2.00
2.01 3.00
CLIN 0006
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
LPE 0006 0.00 1.00
1.01 2.00
2.01 3.00
CLIN 0007
The CLIN extended description has changed from:
Technical Data in accordance with Contract Data Requirements List (CDRL); CDRL's A001-A045 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
To:
Technical Data in accordance with Contract Data Requirements List (CDRLs), exhibits to this contract.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
1. SCOPE
This specification defines the performance, physical, design, quality assurance, and test requirements for a Low Pressure Electrolyzer (LPE) for submarine life support service.
2. APPLICABLE DOCUMENTS
The following documents are part of this specification to the extent specified herein. Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Government. In the event of a conflict between the provisions of the contract and supplier’s technical proposal, the contract shall take precedence. Nothing in this specification, however, shall supersede applicable Federal, State, or local laws and regulations unless a specific exemption has been obtained.
2.1 Federal Specifications and Standards
A-A-59155 NITROGEN, HIGH PURITY, SPECIAL PURPOSE
TT-C-490 CHEMICAL CONVERSION COATINGS AND
PRETREATMENTS FOR METALLIC SUBSTRATES
(BASE ORGANIC COATINGS)
2.2 Military/DOD Specifications
MIL-A-15303 AUDIBLE SIGNALS: ALARMS, BELLS, BUZZERS,
HORNS, AND SIRENS, ELECTRONIC, SHIPBOARD
MIL-B-17931 BEARINGS, BALL, ANNULAR, FOR QUIET OPERATION
MIL-DTL-2212 CONTACTORS AND CONTROLLERS, ELECTRIC
MOTOR AC OR DC, AND ASSOCIATED SWITCHING
DEVICES
MIL-C-5015 CONNECTORS, ELECTRICAL, CIRCULAR THREADED,
GENERAL SPECIFICATIONS FOR
MIL-DTL-17361 CIRCUIT BREAKERS, AIR INSULATED HOUSING
(SHIPBOARD USE), GENERAL SPECIFICATION FOR
MIL-DTL-28840 CONNECTORS, ELECTRICAL, CIRCULAR, THREADED,
HIGH-SHOCK, HIGH DENSITY, SHIPBOARD, CLASS D,
GENERAL SPECIFICATION FOR
MIL-DTL-38999 CONNECTORS, ELECTRICAL, CIRCULAR, MINATURE,
HIGH DENSITY, QUICK DISCONNECT, ENVIRONMENT
RESISTANT WITH CRIMP REMOVEABLE CONTACTS
OR HERMETICALLY SEALED WITH FIXED,
SOLDERABLE CONTACTS, GENERAL SPECIFICATION
FOR
MIL-DTL-917 ELECTRIC POWER EQUIPMENT BASIC
REQUIREMENTS
MIL-F-16552 FILTERS, AIR ENVIRONMENTAL CONTROL SYSTEM,
CLEANABLE, IMPINGEMENT (HIGH VELOCITY TYPE)
MIL-M-17059 MOTORS, 60 CYCLE ALTERNATING-CURRENT,
FRACTIONAL HORSEPOWER (SHIPBOARD USE)
MIL-DTL-17060 MOTORS, 60 CYCLE ALTERNATING-CURRENT,
INTEGRAL HORSEPOWER (SHIPBOARD USE)
MIL-P-15024 PLATES, TAGS AND BANDS FOR IDENTIFICATION OF
EQUIPMENT,
GENERAL SPECIFICATION FOR
MIL-PRF-15160 FUSES, INSTRUMENT, POWER, AND TELEPHONE,
GENERAL SPECIFICATION FOR
MIL-HDBK-217 RELIABILITY PREDICTION OF ELECTRONIC
EQUIPMENT
MIL-HDBK-454 STANDARD GENERAL REQUIREMENTS FOR
ELECTRONIC EQUIPMENT
MIL-HDBK-472 MAINTAINABILITY PREDICTION
MIL-HDBK-2036 PREPARATION OF ELECTRONIC EQUIPMENT
SPECIFICATIONS
MIL-STD-22 WELDED-JOINT DESIGNS
MIL-STD-108 DEFINITIONS OF AND BASIC REQUIREMENTS FOR
ENCLOSURES FOR ELECTRIC AND ELECTRONIC
MIL-STD-167-1 MECHANICAL VIBRATIONS OF SHIPBOARD
MIL-STD-461 CONTROL OF ELECTROMAGNETIC INTERFERENCE
CHARACTERISTICS OF SUBSYSTEMS AND
EQUIPMENT, REQUIREMENTS FOR THE
MIL-STD-471 MAINTAINABILITY; VERIFICATION
DEMONSTRATION/EVALUATION
MIL-STD-740-1 AIRBORNE SOUND MEASUREMENTS AND
ACCEPTANCE CRITERIA OF SHIPBOARD EQUIPMENT
MIL-STD-740-2 STRUCTUREBORNE VIBRATORY ACCELERATION
MEASUREMENTS AND ACCEPTANCE CRITERIA OF
SHIPBOARD EQUIPMENT
MIL-STD-882 STANDARD PRACTICE FOR SYSTEM SAFETY
MIL-STD-889 DISSIMILAR METALS
MIL-STD-901D SHOCK TESTS HIGH IMPACT SHIPBOARD
MACHINERY, EQUIPMENT, AND SYSTEM
REQUIREMENTS
MIL-STD-1310 SHIPBOARD BONDING, GROUNDING, AND OTHER
TECHNIQUES FOR ELECTROMAGNETIC
COMPATIBILITY AND SAFETY, STANDARD
PRACTICE FOR
MIL-STD-1399 INTERFACE STANDARD FOR SHIPBOARD SYSTEMS
MIL-STD-1472 HUMAN ENGINEERING
MIL-STD-1622 CLEANING OF COMPRESSED AIR SYSTEMS,
STANDARD PRACTICE FOR
MIL-STD-2073-1 STANDARD PRACTICE FOR MILITARY PACKAGING
MIL-STD-2219 FUSION WELDING AEROSPACE APPLICATIONS
MIL-PRF-32006A NAVAL SHIPBOARD PROGRAMMABLE CONTROLLER
PERFORMANCE SPECIFICATIONS
MIL-DTL-32613 AUXILIARY SYSTEM CONTROLLER FOR NAVAL
SHIPBOARD USE
2.2 NAVSEA Specifications
S9074-AR-GIB-010/278 REQUIREMENTS FOR FABRICATION WELDING AND
INSPECTION, AND CASTING INSPECTION AND
REPAIR FOR MACHINERY, PIPING, AND PRESSURE
VESSELS
NAVSEA Standard Item 009-04 (series)
NAVSEA Technical Specification 9090-310 (series)
2.3 Other Specifications
American Welding Society SPECIFICATION FOR FURNACE C3.6:1999
BRAZING
DoDI 8500.01 CYBERSECURITY
IEEE/EIA SOFTWARE LIFE CYCLE PROCESSES
12207
SAE WIRE, ELECTRICAL,
AS22759 FLUOROPOLYMER INSULATED,
COPPER OR COPPER ALLOY
2.4 NAVSEA Drawings
8181047 OHIO CLASS TRID 0565 PIPING OXYGEN
GENERATORS 1 & 2 – LOW PRESSURE
ELECTROLYZER
3. REQUIREMENTS
3.1 General. The LPE shall be a self contained electro-chemical oxygen generating plant. Performance characteristics are defined below.
3.1.1 Electrolysis. The electrolysis process produces oxygen. Design of the electrolysis process shall be based upon existing and proven proton-exchange membrane electrolysis-cell processes to the greatest extent possible. A backup electrolysis cell is not required to be integrated into the LPE. The LPE shall provide filters and a demineralizer internal to the unit prior to the electrolysis cell to provide a water quality required to meet the 30,000 hour cell life requirement of para. 3.2.3. All filters and the demineralizer shall be fully accessible and removable for routine maintenance. Filters shall provide a means of indication to inform the operator that the filter needs cleaning or changing. The demineralizer filter bed shall be designed to last for more than 100 days of continuous operation.
The demineralizer bed shall also provide a means of indication to inform the operator that the bed needs cleaning or changing.
3.1.1.1 Cell Design. The cell shall be capable of supporting performance, life and reliability as specified herein.
The design shall be compact in size and volume and shall be based upon the minimum number of cells to meet the capacity stated in para. 3.1.1.2. The electrolysis cell membrane material must be able to support performance, life and reliability requirements as specified herein. The cell materials shall be selected to provide maximum safety and compatibility. The fluoride’s level shall be less than 20 parts per billion (ppb).
3.1.1.2 Oxygen Production. There shall be two types of LPE. The 225 SCFH LPE shall be capable of producing 225 SCFH of gaseous oxygen. The 170 SCFH LPE shall be capable of producing 170 SCFH of gaseous oxygen.
The two types of LPE shall be identical in all ways outside the electrolysis module. Only the 170 SCFH LPE shall be procured. Oxygen shall be discharged from the LPE at ambient pressure and have a dew point of less than 60 F.
The LPE shall be capable of production settings ranging from 15 to 170 SCFH. The quantities and variability of the settings shall be determined during detailed design. The oxygen purity at the point of discharge shall be a minimum of 99.0% at the point of discharge. For the purposes of this specification, standard temperature and pressure at which SCFH shall be calculated is 70 F and 1 atm. The LPE shall be designed such that a 170 SCFH cell stack and a 225 SCFH cell stack are interchangeable. Any components required to make the change shall be provided.
3.1.2 Hydrogen Disposal. The hydrogen produced by the electrolysis process shall be available for disposal at pressures up to 750 psig. The use of pumps and compressors to achieve pressure for discharge is not permitted.
Ambient discharge of hydrogen into the ship shall be limited to an average rate of 3.25 SCFM. The rate of hydrogen inboard discharge shall be limited to 30 SCFH for no longer than 15 minutes. A means shall be provided to discharge hydrogen to ambient which will meet safety and performance goals specified herein. The LPE shall have a gauge from which the pressure at which hydrogen is being disposed at can be monitored.
3.1.3 Nitrogen Usage. The Contractor shall design the LPE to minimize the use of gaseous nitrogen. The design shall provide isolation between the ship’s supply of nitrogen and the LPE to minimize the quantity of nitrogen lost if there is a leak within the LPE. The LPE shall be capable of holding a supply of nitrogen within the unit for purging due to shutdowns. The amount of nitrogen needed to purge the LPE shall be less than 200 SCF.
3.2 Functional Requirements.
3.2.1 Performance Characteristics.
3.2.1.1 Size. The LPE shall use the existing Electrolytic Oxygen Generator (EOG) foundation currently in place aboard OHIO Class submarines, up to and including the mounting bolt locations in the EOG base plate. The LPE footprint shall be kept to a minimum, consistent with the required sturdiness, serviceability, safety and reliability.
The footprint of the LPE shall be less than 32.5 x 41.0 inches. Height of the LPE shall be less than 75 inches.
3.2.1.2 Hatch and Door Requirement. The LPE shall be constructed such that items will pass through a 30 inch diameter hatch. Shipboard replaceable items and subassemblies, which may be stowed onboard ship, shall be able to pass through a minimum of 18 inch x 6 foot 3 inch passageway. Reassembly of LPE subassemblies via bolted construction is preferred. The LPE shall be divided into cabinet subassemblies, each of which will pass through a 30-inch diameter hatch. Each cabinet (i.e. electrolysis power supply) may only be divided into a maximum of six (6) subassemblies when initially installing on submarines. Subassemblies shall be minimized as much as possible. Pins shall be provided to facilitate alignment of components.
3.2.1.3 Weight. The wet weight of the LPE including a water-charged electrolysis cell module shall be less than 5,200 lbs. Items and assemblies in excess of 80 lbs shall be equipped with lifting aids (e.g., eyebolts). Access panels or doors weighing more than 40 lbs shall be provided with alignment pins and handles to facilitate reinstallation of access panels or doors.
3.2.1.4 Electric Power Interface. Electric power will be provided to the LPE by the ship’s generation and power distribution system as defined below. The LPE will be provided with 440 VAC, 3 phase main power and 115 Vrms, single phase control power. The equipment shall operate in accordance with MIL-STD-1399, Section 300A.
(a) AC Power. The AC power available from the ship’s service power buses is Type I power per MIL-STD-1399, section 300A. The AC equipment service is 440 Volt, 60 Hz, and 115 Volt, 60 Hz. Equipment shall be fully operational within the normal tolerance limits specified for Type I power. Equipment may shut down or go into standby condition, but not be damaged, when operating outside these limits. See para. 3.7.6.4.1.
(b) Maximum Power Limit. The LPE shall use less than 117 kVA of power.
(c) Analog/Digital Interfaces. Provisions shall be made to transfer analog or digital interface signals to or from the LPE for the following:
(1) A remote emergency stop (“kill”) switch shall be provided in the design of the LPE and will be located in the ship’s arrangement just outside of the AMR compartment.
(2) The LPE shall allow recording of historical data stored in the LPE’s CPU to download data for failure analysis to a portable data recorder. The LPE shall transmit time and date of a system failure/shutdown as well as information on temperature, pressure, and flow rates which may aid in a failure analysis.
(d) Cable Interface. Provisions shall be made for the entry of the electric power and control cable interface to the top of the unit or as approved by the Government.
(e) Circuit Breaker Control Interface. The LPE power and control subsystem shall be equipped with a circuit breaker unless otherwise approved by the Government.
3.2.1.5 Fluids Interface. The fluids interface shall be as follows:
(a) Oxygen. Oxygen produced by the LPE shall be directed to the ship’s atmosphere at a discharge pressure specified in para. 3.1.1.2 and shall discharge out of the top of the unit.
(b) Demineralized Water. Demineralized water will be provided to the LPE at a maximum flow rate of 0.5 GPM for short term filling and general maintenance. A maximum flow rate of 0.1 GPM will be provided to the LPE during normal operation. The demineralized water delivery pressure to the LPE will be 25 psig to 40 psig with a maximum design temperature of 122 F. The LPE piping from the demineralized water supply shall be designed to withstand 60 psig. An isolation valve will be provided by the Government on the demineralized water inlet pipe to the LPE. The LPE shall be equipped with a 3/8” tube socket union fitting (SSP Part No. 6KSWU or similar) for connection to the demineralized water system piping. Demineralized water quality is available to the LPE as follows:
(1) Conductivity – 2.5 micromho/cm maximum
(2) pH – 5.7 to 8.0
(3) Visual clarity – No turbidity, oil, sediment, or resin beads
(4) Chlorides – Maximum 0.1 ppm
(c) Electronic and Auxiliary Fresh Water. The Electronic and Auxiliary Fresh Water (EAFW) system will provide a supply of fresh water to the LPE at a flow rate of 5 GPM and at a temperature of 95 F +/- 3 F. The conductivity of the EAFW shall not exceed 2.0 micromhos/cm. The EAFW system design pressure will be 125 psia, and the pressure drop across the LPE shall not exceed 10 psi.
Maximum EAFW system pressure is 200 psia. Isolation valves will be provided by the Government on both the EAFW inlet and outlet pipes. The LPE shall be equipped with 5/8” tube socket union fittings (SSP Part No. 10KSWU or similar) for connection to the EAFW system piping.
(d) Chilled Water. Ship’s chilled water (CHW) is available at 45 F +3 / - 2 F and may be used for general cooling of the LPE. The total flow rate to the LPE will be limited to 15.5 GPM and controlled between 3 and 15.5 GPM to maintain LPE temperature control. The Contractor shall attempt to minimize the CHW usage. The ship’s CHW flowrates may fluctuate by +/- 10%. The CHW design system pressure is 150 psig, and the LPE shall be designed to operate and control temperature based on a differential pressure of 35 psi measured between the ship’s supply and return headers. The LPE shall be equipped with welded socket fittings (CPV Part No. 51R-4 Tailpiece to Part No. 50N-4 Nut or similar), for connection to ship’s CHW system.
(e) Hydrogen Inboard Purge Connection. The LPE may provide a hydrogen gas inboard purge union connection to vent hydrogen to ambient via ship’s piping, during LPE shutdown. Average flow rate of the hydrogen during discharge periods shall be limited to 3.25 SCFM.
(f) LPE Drain System. The LPE shall provide a suitable drain system for waste water and condensates which will be drained to the ship’s existing gravity drain system.
(g) Mating Fluids Interface Connections. The Contractor shall supply separately, unless otherwise specified by the Government, all mating union connections and tailpieces/adapters, except for the hydrogen gas overboard connection, which are to be welded to the corresponding ship’s interface pipe by the Government. The tailpieces/adapters must use the same material as the corresponding ship interface pipe to which it will be welded, or as approved by the Government.
3.2.1.6 Interface Locations. The LPE shall connect directly to EOG existing piping aboard OHIO Class submarines whenever possible or as approved by the Government. NAVSEA Drawing 8181047 shall be used as reference. All piping connections shall be located on the “FWD” side of the LPE Configuration, as illustrated in Figure 1 in Paragraph 3.2.7.2. The electrical interface for the LPE shall be on top of the unit or as approved by the Government.
3.2.2 Design Characteristics
3.2.2.1 Ambient Pressure. The equipment shall operate in accordance with all performance requirements at an ambient pressure of 11.8 – 17.6 psia (0.8 – 1.2 atm), and shall not be damaged when subjected to a maximum pressure of 29.4 psia (2.0 atm). The maximum rate of change in ship’s pressure is 2 inHg/min.
3.2.2.2 Temperature. The equipment shall operate in accordance with all performance requirements at ambient temperatures between 40 F and 100 F. In a non-operating mode, equipment shall not be damaged at ambient temperatures between 40 F and 122 F.
3.2.2.3 Humidity. The equipment shall operate in accordance with all performance requirements at 95 percent relative humidity (non-condensing).
3.2.2.4 Vibration. The LPE shall meet the requirements of Type I environmental vibration of MIL-STD-167-1.
The equipment shall remain in operational during vibration testing.
3.2.2.5 Shock. The LPE shall meet Grade A shock requirements in accordance with MIL-S-901D, Interim Change No. 1. Equipment operation shall not be affected to the extent that the equipment is unable to perform its function during and after shock testing in accordance with MIL-S-901D, Interim Change No. 1. The use of shock, noise, or vibration isolation or shock mitigation devices shall require Government approval.
Testing to MIL-S-901D Interim Change #1 is allowed provided that the shock test of the equipment meets the intent of the shock requirements for each submarine class. By shock testing in accordance with MIL-S-901D Interim Change #1, the following shock requirements will be satisfied:
a. MIL-S-901C, Shock Tests, H.I. (High Impact); Shipboard Machinery, Equipment and Systems, Requirements for; of 15 Jan 1963, as modified by the SSBN-726 ship specifications (Pub.
NAVSEA 0902-LP-027-7010, section 9400-1) for SSBN-726 Class.
b. MIL-S-901C, Shock Tests, H.I. (High Impact); Shipboard Machinery, Equipment and Systems, Requirements for; of 15 Jan 1963, as modified by the SSBN-726 ship specifications (Pub.
NAVSEA 0902-LP-027-7010, section 9400-1) and SSGN Conversion Ship Specification Addendum for SSGN-726 Class.
c. PPD No. 802-6335704, Shock Tests, H.I. (High Impact); Shipboard Machinery, Equipment, and
Systems, Requirements for; of 1 May 1987 for SSN-21 (SEAWOLF) Class.
3.2.2.6 Airborne and Structureborne Noise. The structureborne noise generated by the LPE when operating at 120 and Max SCFH shall not exceed that shown in Appendix A for steady state structureborne noise levels.
Equipment generated airborne noise shall be in accordance with Table I of MIL-STD-740-1, Grade D.
3.2.2.7 DC Magnetic Fields. The equipment shall operate in accordance with MIL-STD-1399 Section 070.
3.2.2.8 Electromagnetic Emissions and Susceptibility. Equipment shall meet and demonstrate compliance with the requirements of MIL-STD-461 Revision E dated 20 August 1999 for Submarines, Internal to Pressure Hull installations and Methods RS02 (part 1 – magnetic induction spike) & CS06 of MIL-STD-461C. The standoff distance specified in RE101 is increased from 7 cm to 61 cm for all directions except above the unit and in front of the unit. Above the unit the standoff distance is increased from 7 cm to 10 cm. In front of the unit the standoff distance is increased to 100 cm. Para. 4.2.4.2 of MIL-STD-461E shall not be interpreted to mean that a power supply qualified to previous EMI standards can be installed aboard a ship class other than the ship class it was originally procured for.
3.2.2.9 Boat Motion and Attitude. The equipment shall be designed and installed to operate satisfactorily when inclined 45 degrees from the vertical. Inclination testing shall be for both the fore-aft and athwartship orientation.
3.2.3 Life Expectancy. As a design goal, the equipment shall have a total life expectancy of 33 years, when maintained in accordance with the maintenance instructions, and with a major overhaul allowed after 15 years. All pumps and rotating mechanical components with routine maintenance shall have a life expectancy of 20,000 hours.
Electrical components and other major mechanical components shall have a life expectancy greater than 20,000 hours. The life expectancy of the electrolysis cells shall be greater than 30,000 hours and shall have a maximum average voltage drop per electrolysis cell of 3 volts at end of life. The 30,000 hour life expectancy for electrolysis cells shall be calculated using the maximum LPE production figure.
3.2.3.1 Shelf Life. The LPE components shall be able to meet all the requirements specified in this specification for the following conditions:
(a) Storage Life – When delivered to the Government, the LPE shall be able to be stored for up to 5 years before installation or use on the ship. Critical components which need special storing, handling or maintenance may be packaged separately and shall be provided with instructions on how to store, handle or be maintained properly.
(b) Standdown – The LPE shall be able to withstand a non operational use while the ship is docked for a period of 3 months without any disassembly of components. Critical components which will require special maintenance and handling shall be provided with instructions on how to handle or maintain properly.
(c) Mothballing – The LPE shall be able to withstand a non operational use while the ship is docked for longer than 3 months. Disassembly of components is allowed. Critical components which need special storing, handling or maintenance may be packaged separately and shall be provided with instructions on how to store, handle or be maintained properly.
3.2.4 Reliability. The LPE shall have a minimum mean-time-between-failure (MTBF) of 2,000 hours. A reliability prediction shall be performed to the requirements of MIL-HDBK-217.
3.2.5 Maintainability. The complete LPE shall have a mean time to repair (MTTR) of not more than five hours except where affected components require a pressure test and/or a cool down period. Components that must be cooled and/or pressure tested shall have an MTTR of not more than fifteen hours. MTTR includes trouble shooting and repair time. A prediction for MTTR shall be performed using MIL-HDBK-472.
3.2.6 Heat Rejection. The LPE shall be designed to minimize total heat rejection to the electronic auxiliary cooling water, chilled water, and the ambient air.
3.2.7 LPE Controls and Operability. The LPE controls and operability shall meet the requirements defined in the following paragraphs.
3.2.7.1 LPE Control Power Interruption. The LPE control system shall be designed to preclude failure or damage to any LPE component due to a temporary loss of power. Such an interruption could occur with an ABT transfer of 115 Volt shipboard buses. In the event of a transfer of this nature, shut down of the LPE is allowed and the unit must shut down safely.
3.2.7.2 Controls and Operator Interface. All controls and indicators required for normal operations shall be located on the front side of the LPE. See Figure 1 for OHIO Class Configuration. Valves required for normal operation shall be readily accessible (behind hinged panels if necessary). The control interface system shall consist of a display and control panel. The display will provide operating parameters, system and failure messages, and diagnostic information to assist in operation, maintenance, and troubleshooting of the LPE. The controls shall include indicator lights for LPE status and critical operating functions. The control panel shall provide all of the necessary functions to operate and control the LPE. The LPE shall provide visual indicators to allow for limited continuous operation in the event of a display system failure, or as approved by the Government. If volatile memory is capable of being lost due to a loss of power to the LPE, then a 72 hour battery backup capable of saving volatile memory shall be provided by the LPE. The controller shall be capable of system diagnostics to warn or alert the operator of potential problems. The LPE alarms shall conform to MIL-A-15303, and shall be capable of being silenced by the operator.
The controller shall be capable of system diagnostics to warn or alert the operator of potential problems. The LPE alarms shall conform to MIL-A-15303, and shall be capable of being silenced by the operator.
Figure 1. OHIO Class Configuration Reference
3.2.7.3 Controller Hardware. The LPE Controller shall be A real time electronic microprocessor which coordinates all control functions and provides a continuous update on the status and condition within the LPE. The central processing unit (CPU) will consist of logic and memory blocks. The CPU will perform the logical and computational operations on the signals as directed by the control program held in memory and based on the process conditions. The controller system shall incorporate Built In Test Equipment (BITE) watchdog timers and hard wire sensors to shut down separately as appropriate for safety. If required, the display shall have its own watchdog timer and hard wire sensors to shut down separately as appropriate for safety. The watchdog timers shall continuously update and monitor shutdowns for both processes and software. The microprocessor or chips shall be commercially available and widely used, to minimize premature obsolescence.
3.2.7.4 Controller Software. The Government shall have a copy of the software program with the ability to maintain configuration control and to make changes to address Cyber security and safety issues to the software installed on the LPE Controller. The Contractor shall provide a copy of the program installed on the LPE Controller (DD1423 A0045). The Government's rights in technical data and computer software shall include but not be limited to the foregoing.
3.2.7.5 Design Analysis. The Contractor shall submit to the Government for review and approval an analysis of the proposed LPE operator interface. This report shall include a detailed description of each function, mode of operation, and interaction between these modes. The report shall then describe (with both written descriptions and diagrams) the proposed operator interface for each of these functions, and what will occur if the interface is used improperly or fails. For programmable/interactive interfaces, the report shall also detail how and under what conditions the operator can initiate actions, and for each action what occurs to the interface. The report shall also contain information concerning viewability, character font size and type, choice of icons(s), mnemonics, etc., that will be in the proposed interface. The Contractor shall perform the following design analyses, development plan, and system specifications for the following unless otherwise specified in the Contract. The format content for each report shall follow the respective MIL STD format, unless otherwise approved by the Government.
Software Development Plan (SDP) (DD1423 A006) in accordance with IEEE/EIA 12207 Reliability Prediction (DD1423 A002) in accordance with MIL-HDBK-217 Software Requirements Specification (SRS) (DD1423 A003) in accordance with IEEE/EIA 12207 Failure Modes, Effects, and Criticality Analysis (FMECA) (DD1423 A004) in accordance with MIL-STD-
System Safety Hazard Analysis Report (SSHA) (DD1423 A005) in accordance with MIL-STD-882
3.2.7.6 Controls, Instrumentation and Safety Circuits. The LPE shall contain all necessary controls, and instrumentation and safety circuits required to ensure safe and reliable unattended operation after initial start-up.
The LPE shall be designed so that installation, operation, inspection, maintenance and adjustment can be accomplished without causing injury or damage to the equipment. No double failure shall cause a personnel hazard.
The LPE shall be designed so that one failure or anomaly that may produce an unsafe condition will shut down the LPE. The LPE shall be designed so one failure does not cause a ripple effect. The control system shall continually monitor critical mechanical and chemical processes, and in the event of a problem or malfunction, shall place the LPE in a fail-safe shutdown condition. The control system shall report the cause of the shutdown, and shall save the status of the various controls and sensors in memory. No improper switch or valve actuation shall cause a casualty.
The LPE control system shall provide the necessary circuitry and interface connectors to allow the unit to be shut down remotely.
3.2.7.7 Failure Recording. The LPE shall record operational data once every minute. The past 30 minutes of data will be available for review by the operator. When one of the following events occurs, the LPE shall automatically save the prior 30 minutes of data. Saved data shall be available for download through the LPE USB port or review by the operator. The LPE shall be capable of saving data from up to the past 100 events.
(a) Message displayed
(b) Operation mode change
(c) Failure
3.2.8 Human Engineering. The unit shall meet the human engineering requirements specified in MIL-STD- 1472 unless otherwise specified herein. In general the unit shall be designed for ease of operation and maintenance.
Design of the unit shall reflect efficient arrangement of equipment, control and displays to ensure optimal task performance. Equipment design shall provide for adequate physical, visual, auditory and other communication links between personnel and equipment under both normal and emergency conditions. Controls, displays, markings, coding, labeling and arrangement schemes (equipment and panel layout) shall be uniform for common functions of all equipment. Where off-the-shelf equipment requires modification in order to interface with other equipment, the modification shall be designed to comply with the criteria contained in MIL-STD-1472.
3.2.9 Safety. In general the unit shall conform to the safety standards issued by the Occupational Safety and Health Administration (OSHA). Safety features shall be incorporated into the unit to prevent damage to equipment and ensure optimal personnel protection. An operating safety analysis shall be performed to identify activities or operations which have the potential for injury to personnel or damage to equipment. The area of the analysis shall include, but not be limited to the following:
(a) Specific safety installation requirements
(b) Specific safety testing requirements
(c) Specific operating/maintenance requirements including impact on submarine atmosphere control
(d) Specific safety handling requirements
(e) Specific training requirements
3.3 Materials and Processes
3.3.1 Materials. Contractor and Suppliers shall be governed by these requirements.
(a) Corrosion. Metals and alloys shall be corrosion-resistant or shall be given a corrosion-resisting treatment or coating. Incompatible metal combinations, as identified in MIL-STD-889, shall be protected
(b) Toxic hazards. The equipment shall be designed to prevent exposure of personnel to toxic substances. The design of the LPE shall provide control and leak detection methods required to prevent exposure and to alert personnel of a leak of hydrogen into the ship's atmosphere.
(c) Prohibited. The materials listed on the Submarine Material Control List (SMCL) as prohibited shall not be used. Trace amounts of Mercury in backlights is allowed in color displays.
(d) Exclusions. Brittle materials are of concern due to performance under shock and fatigue. General guidance is provided in the notes section of MIL-S-901D, Interim Change No. 1 and modifications for elongation requirements. Zinc alloy and magnesium alloy castings shall not be used. Aluminum wire shall not be used.
(e) Flammability. Equipment shall be noncombustible or fire retardant under the most hazardous conditions to be expected in the application. Fire retardance shall not be achieved by use of nonpermanent additives to the equipment. Internal cable and wire flammability shall conform to the requirements of SAE AS22759.
(f) Recovered Materials. Unless otherwise specified, all equipment, material, and articles incorporated in the products covered by this specification shall be new and shall be fabricated using recovered materials to the maximum extent practicable where cost effective. Recovered materials are materials that have been collected or recovered from solid waste and reprocessed to become a source of raw materials.
3.3.2 Processes
3.3.2.1 System Cleaning. The following LPE systems (i.e., the demineralized water, nitrogen, hydrogen gas and oxygen) must be thoroughly cleaned of all foreign matter prior to operational tests in accordance with MIL-STD- 1622, or as approved by the Government. The electrolysis cell, due to its special materials, shall be cleaned in accordance with a Supplier procedure approved by the Government. (DD1423 A30)
3.3.2.2 Assembly. The LPE shall be assembled in a clean work area. All tools, fixtures, test equipment, etc., shall be clean and free of oi1, and grease. Test fixtures operated within the oxygen clean boundary must also be oxygen clean. The LPE assembly area shall be segregated from all non-clean fabrication/assembly areas.
3.3.2.3 Welding and Brazing. All welding and brazing shall conform to NAVSEA S9074-AR-GIB-010/278.
Pressure vessels shall be class A-2 and process piping shall be class P-1. Welded joints shall conform to MIL-STD-
22. The following exceptions are noted below:
(a) Shell and tube heat exchanger braze joints, which are not accessible and do not meet the requirements of paragraphs 5.21, 5.2.2 and 9.1.5(c) of NAVSEA Specification 0900-LP-001-7000, shall be hydrostatic tested in lieu of ultrasonic inspection.
(b) MIL-STD-2219 may be used in lieu of NAVSEA S9074-AR-GIB-010/278 for welding aluminum material.
(c) The power supply shall be welded in accordance with MIL-STD-2219 or as approved by the Government.
(d) Furnace Brazing of temperature sensor housings and plugs shall be in accordance with AWS C3.6 or as approved by the Government.
(e) Vacuum furnace brazing of chilled water blocks and tubing shall be in accordance with AWS C3.6 or as approved by the Government.
3.3.2.4 Soldering. Soldering shall be in accordance with MIL-HDBK-454A
3.3.2.5 Painting. Before any coat is applied, bare spots on the previous coat shall be "touched up" and the entire surface allowed to dry thoroughly.
(a) Aluminum and aluminum alloy pretreatment. The basic metal shall be cleaned to remove grease, oil, welding flux, or other foreign matter. The components shall receive a chemical conversion coating.
(b) Ferrous metal pretreatment. After all machining, welding, and brazing operations are completed, rust or other corrosion products and flux shall be removed by abrasive blasting, sanding, wire brushing, or other mechanical means. Surfaces shall be cleansed of all grease, oil, and dirt by solvent wiping and rinsing, vapor degreasing, or caustic washing followed by rinsing. Ferrous metals shall then be pretreated in accordance with type I or III of TT-C-490.
(c) Coatings. Framing, electrical boxes, and other miscellaneous structural components that require corrosion protection, may be epoxy-powder coated, if they meet the following criteria:
(1) Parts must be small enough to fit in the curing oven.
(2) Parts must not be adversely affected by heating to process temperatures or by other process conditions.
(3) Powder coating of fasteners is not authorized. If powder coating cannot be used the parts shall be painted.
(4) Powder coating that are categorized as prohibited on the SMCL shall not be used.
(d) Plating. Cadmium plating of fasteners is allowed.
3.3.3 Electrical/Electronics Component Selection. Electronic and electrical equipment shall meet the requirements of MIL-E-917E.
3.3.3.1 Electronic Component Derating. In the application of electronic parts and materials, the parts and materials selected shall be used within their electrical ratings and environmental capabilities (e.g., any ambient or hot spot temperatures, voltage, current, or power dissipation). Derating shall be accomplished as necessary to assure the required equipment reliability within the specified operating conditions.
3.3.3.2 Electrical Connectors. The types of electrical connectors that shall be utilized are MIL-C-38999 Series 111, MIL-C-5015 Series 3400 Class D and/or MIL-C-28840.