This document is a Request for Quote (RFQ) for upgrading four Input-Output Controllers (IOCs) for the Navigation Critical Data System (NCDS) on the USS THEODORE ROOSEVELT (CVN 71). The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is issuing the solicitation to procure the required hardware, including Uninterruptable Power Supplies, Rugged 1U Computers, VME Chassis, CPU Cards, Expansion Modules, Network Interface Cards, Digital I/O Cards, Rack Mount Keyboard Monitors, and 400 Hz Converters.

The four IOCs are to be delivered to the Naval Sea Logistics Center in Philadelphia, PA no later than January 30, 2025. The government will inspect and accept the supplies at destination. This is a small business set-aside contract, with a size standard of 1,250 employees under NAICS code 334111. Proposals are due by September 18, 2024. The contract includes FAR clauses and NAVSEA clauses typical for a hardware procurement.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amended RFQU0002.pdf PDF
Amendment Document 0002.pdf PDF
Amendment Document.pdf PDF
Amended RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N6449824Q5162 19-Aug-2024

b. TELEPHONE NUMBER

215-897-1828

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 18 Sep 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N644989. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SHAWN M WATERS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 0223, SHAWN WATERS

215-897-1828, SHAWN.M.WATERS@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 215-897-1828 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

334111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF112

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

SOW-PWS Template 12 January 2024 version Page 3

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

CVN 71; IOC 1

FFP

Please reference SOW for specific details.

FOB: Destination

PSC CD: 7H20

NET AMT

0002 1 Each

CVN 71; IOC 2

FFP

Please reference SOW for specific details.

SOW-PWS Template 12 January 2024 version Page 4

0003 1 Each

CVN 71; IOC 3

FFP

Please reference SOW for specific details.

0004 1 Each

CVN 71; IOC 4

FFP

Please reference SOW for specific details.

0005 1 Each

CDRL A001

FFP

CDRL A001 - Technical Data Report

SOW-PWS Template 12 January 2024 version Page 5

Section C - Descriptions and Specifications

STATEMENT OF WORK

Statement of Work (SOW) Navigation Critical Data System (NCDS)

Input-Output Controller (IOC) Requirement for the Ship Change Document (SCD) 13821 NCDS Upgrade on the USS THEODORE ROOSEVELT (CVN 71)

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 541, which is responsible for Navigation Critical Distribution System (NCDS) hardware and software upgrades on Naval vessels.

1.1 BACKGROUND

The Navigation Critical Distribution System (NCDS) is a mission critical system currently installed on CVN 68 Class and LHD 1 Class platforms. The main function of NCDS is to provide Navigation data to critical locations and systems, as well as Situational Awareness to the Bridge and other locations.

C541 is responsible for provision of hardware elements comprising the primary functionality of the NCDS. The Input-Output Controllers (IOCs) are used to convert digital navigation signal to analog for clients requiring synchro information.

1.2 SCOPE OF WORK

The Contractor shall provide the manpower and procure the material required to upgrade four (4) IOCs internal racks. The following information details the requirement for each component:

SOW-PWS Template 12 January 2024 version Page 6

Requirement

P/N Example Associated OEM

Uninterruptable Power Supply The UPS shall be a 2U size that provides continuous 1625VA/1300W to the SABDS and meet the following criteria:

Blown Precipitation – MIL-STD-810G

EMI/RFI – MIL-STD-461F

Shipboard – MIL-STD-1399 Shock – MIL-STD-810F Vehicle Power – MIL-STD-1275 Vibration – MIL-STD-167-1 36 minutes minimum backup time on a 1000W load

ACG1625XRLISHC1 Acumetrics

Rugged 1U Computer The Rugged 1U computer shall be used as the video processor for the SABDS. Minimum Capabilities shall include:

INTEL CORE i5-4590S CPU, UPTO 3.7GHz 2GB DDR3 1600MHz

SLIM DVD-RW DRIVE – SATA

240GB INTERNAL SOLID STATE DRIVE, 2.5", SATA

20659-1UMIL-LB CoreSystems

VME Chassis

VME64X

21 SLOT

2 P/S REV

078-619-04 Atrenne

CPU Card Operating System (OS) Supports BIOS, Linux, VxWorks, Windows 10 Intel Xeon E3-1505M, E3-1505L v6 Processor 32 GB DDR4 SDRAM soldered with ECC 2eSST VME, DisplayPort, DVI, Gigabit Ethernet, GPIO, SATA, Serial, USB Supports VTM29 Expansion Module

XVR19-12220021 Abaco

Expansion Module 2x Gigabit Ethernet ports 2x SATA (Gen 2) ports 2x USB 2.0 ports 2x Serial ports DVI-D connector Environmental Specifications

Operational Temperature Range 0 to +55 °C (with minimum airflow of 300 ft/m) Vibration 0.002g/Hz from 10 to 2000 Hz random and 2g sinusoidal from 5 to 500 Hz Shock 20g peak sawtooth, 11 mS duration

VTM29-1000 Abaco

SOW-PWS Template 12 January 2024 version Page 7

Network Interface Card Four-channel Gigabit Ethernet Small Form Factor Pluggable (SFP) interface.

Provides access to the Intel® I350-AM4 quad-port Gigabit Ethernet controller via an x4 PCIe link.

SFP transceiver modules supported include:

• Intel XDACBL1M (SFP+ Direct Attach Twinaxial Cable)

• Finisar FCBG110SD1C01 (SFP+ SFPwire Active Optical Cable)

• Intel E10GSFPSR (SFP+ 1000BASE-SX)

• Finisar FTLX8574D3BCV (SFP+ 1000BASE-SX)

• Intel E10GSFPLR (SFP+ 1000BASE-LX)

• Finisar FTLX1475D3BCV (SFP+ 1000BASE-LX)

• Finisar FTLF8519P3BTL (SFP 1000BASE-SX)

• Finisar FTLF1318P3BTL (SFP 1000BASE-LX)

• Finisar FCLF8522P2BTL (SFP 1000BASE-T).

XMC477RC-9040 Abaco

Digital I/O Card 6U VME with Master VME Bus capability Independent x1 SerDes interface to each function module slot Control via either VME Bus or dual Gigabit Ethernet (Gig-E) interfaces Connections via front panel, rear panel, or both 2x 10/100/1000 Base-T Ethernet: 2 to rear, or 1 to rear and 1 to front I/O

64G5-2-RT1DT1Z00

Z00Z00Z000RC00

North Atlantic Industries

1U Rack Mount Keyboard Monitor 19” Display - 1280 x 1024 Resolution DVI and VGA Input

ENVIRONMENTAL SPECIFICATIONS

OPERATIONAL TEMP: MIL-STD-810F, Method 501.5 Procedures I/II; -15°C to +55°C STORAGE TEMP: MIL-STD-810F, Method 501.5, Procedures I/II; -55°C to +85°C HUMIDITY: MIL-STD-810F, Method 507.4; 48 Hour, 95% RH 40-65C (with conformal coat option) ALTITUDE: MIL-STD-810F, Method 500.4; 12,500ft operation with 40,000ft transport VIBRATION: MIL-STD-810G, Method 514.6 Procedure I; 4.43 GRMS, 5-20000Hz, 60min/axis SHOCK: MIL-STD-810G, Method 516.6, Procedures I/V; 20g, 11msec - functional shock; 40g, 11msec crash hazard shock OTHER: MIL-STD-461F CE & RE emissions

G219-TP-USB CoreSystems

8 Port KVM Switch 1U rackmount KVM switch Control up to 8 computers via a single VGA monitor and USB or PS/2 keyboard/mouse Extend control for up to 248 computers by daisy chaining additional KVM switches Compatibility with all major operating systems

B042-008 Tripp Lite

SOW-PWS Template 12 January 2024 version Page 8

400 Hz Converter Input Voltage115Vac nominal, 47-63Hz97-132Vac operating range Output Voltage115Vac/400Hz/4.34Arms continuous

SPECIFICATIONS

Load Crest Factor: Maximum 2.5 at 90% load

Output Noise: High frequency ripple is less than 500mVrms (20MHz BW) Output Overload Protection: Current limiting with short circuit protection. At approximately 700VA, unit enters cycling (hiccup) mode. Thermal shutdown with automatic recovery in case of insufficient cooling.

Output Overvoltage Protection: 140Vac by internal supply voltage limiting Efficiency 80% at full load Operating Temperature Range: 0ºC to +50ºC for full specification with proper installation Temperature Drift: 0.05% perºC over operating temperature range Cooling By built-in high quality fan Environmental Protection: Basic ruggedizing Conformal coating Humidity: 5–95% non-condensing

FCA500-115.60-

115.400-T7631

Analytic Systems

N6449824Q5162

The example part numbers above are already certified and qualified for the NCDS IOC. If alternative items are proposed, certification/qualification of those parts for use in the NCDS IOC will need to be included in the proposal and shall require the assembly of a complete IOC system per technical data package (TDP)*, certification testing per the IOC FAT Procedure_Official_10 JUL 2024, and qualification testing per the CVN68_NCDS_SyRS_Basic_JUL 2024.

The factory acceptance test and qualification results shall per submitted to the NSWCPD C541 as CDRL 0001.

The four CLINs require quantities of the above components in the following quantities:

CLIN 1; CVN 71 IOC1 Qualified PN QTY

Uninterruptable Power Supply ACG1625XRLISHC1 1

Rugged 1U Computer 20659-1UMIL-LB 1

VME Chassis, VME64X, 21 SLOT, 2 P/S REV A 078-619-04 1

CPU Card XVR19-12220021 1

Expansion Module VTM29-1000 1

Network Interface Card XMC477RC-9040 1

Digital I/O Card 64G5-2-RT1DT1Z00Z00Z00Z000RC00 1

1U Rack Mount Keyboard Monitor G219-TP-USB 1

8 Port KVM Switch B042-008 1

400 Hz Converter FCA500-115.60-115.400-T7631 1

CLIN 2; CVN 71 IOC2 Qualified PN QTY

Uninterruptable Power Supply ACG1625XRLISHC1 1

Rugged 1U Computer 20659-1UMIL-LB 1

VME Chassis, VME64X, 21 SLOT, 2 P/S REV A 078-619-04 1

CPU Card XVR19-12220021 1

Expansion Module VTM29-1000 1

Network Interface Card XMC477RC-9040 1

Digital I/O Card 64G5-2-RT1DT1Z00Z00Z00Z000RC00 1

1U Rack Mount Keyboard Monitor G219-TP-USB 1

8 Port KVM Switch B042-008 1

400 Hz Converter FCA500-115.60-115.400-T7631 1

CLIN 3; CVN 71 IOC3 Qualified PN QTY

Uninterruptable Power Supply ACG1625XRLISHC1 1

Rugged 1U Computer 20659-1UMIL-LB 1

VME Chassis, VME64X, 21 SLOT, 2 P/S REV A 078-619-04 1

CPU Card XVR19-12220021 1

Expansion Module VTM29-1000 1

Network Interface Card XMC477RC-9040 1

Digital I/O Card 64G5-2-RT1DT1Z00Z00Z00Z000RC00 1

1U Rack Mount Keyboard Monitor G219-TP-USB 1

8 Port KVM Switch B042-008 1

400 Hz Converter FCA500-115.60-115.400-T7631 1

CLIN 4; CVN 71 IOC4 Qualified PN QTY

Uninterruptable Power Supply ACG1625XRLISHC1 1

Rugged 1U Computer 20659-1UMIL-LB 1

VME Chassis, VME64X, 21 SLOT, 2 P/S REV A 078-619-04 1

CPU Card XVR19-12220021 1

Expansion Module VTM29-1000 1

Network Interface Card XMC477RC-9040 1

Digital I/O Card 64G5-2-RT1DT1Z00Z00Z00Z000RC00 1

1U Rack Mount Keyboard Monitor G219-TP-USB 1

8 Port KVM Switch B042-008 1

400 Hz Converter FCA500-115.60-115.400-T7631 1

2.0 APPLICABLE DOCUMENTS

(as required for certification and qualification test results)

*PMS3264-868 DANI Base Cabinet rev B

*PM3264-873 CVN-74

IOC FAT Procedure_Official_10 JUL 2024 CVN68_NCDS_SyRS_Basic_JUL 2024

3.0. REQUIREMENTS

3.1 The contractor shall support telecons as requested by the government.

3.2 The contractor shall include the provision to ship in place (i.e., store at local facility) for future shipment of all material in one shipment per hull.

4.0 DATA REQUIREMENTS

CDRL A001 Technical Reports: As required for certification and EQT test results.

5.0 SECURITY REQUIREMENTS

Not applicable.

6.0 PLACE OF PERFORMANCE

Not applicable.

7.0 TRAVEL

Not applicable.

8.0 GOVERNMENT FURNISHED PROPERTY

Not applicable.

9.0 GOVERNMENT FURNISHED INFORMATION

Not applicable.

10.0 PURCHASES

Not applicable.

11.0 COUNTERFEIT MATERIAL PREVENTION

11.1 Electronic End-Items

The contractor planning shall document procedures and processes to minimize the risk of procuring and/or using counterfeit parts and materials, and their process for detecting counterfeit materiel in the event it is procured. This requirement applies to both new/modified and existing mission and safety critical hardware. SAE AS5553 contains information regarding the detection, avoidance, and mitigation of counterfeit electronic components, and may be used as a reference document for the development of the plan.

11.2 Non-Electronic Materiels

11.2.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:

11.2.1.1 If the materiel is currently in production or currently available, materiel shall be obtained only from authorized suppliers.

11.2.1.2 If the materiel is not in production or currently available from authorized suppliers, materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria.

11.2.1.3 Contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier.

11.2.1.4 Contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier.

11.2.1.5 Contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.

12.0 DELIVERY REQUIREMENTS

The four CLINs shall all be delivered to Naval Sea Logistics Center, 1601 Langley Ave, Building 542, Philadelphia, PA 19112. All four (4) CLINs are due no later than January 30, 2025.

CLAUSES INCORPORATED BY FULL TEXT

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of text)

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No.

N6449824Q5162.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-227-H010 COMPUTER SOFTWARE AND COMPUTER DATA BASES DELIVERED TO OR RECEIVED

FROM THE GOVERNMENT (NAVSEA) (JAN 2019)

(a) The Contractor agrees to test for viruses, malware, Trojan Horses, and other security threats such as those listed in NIST Special Publication 800-12 Rev 1, An Introduction to Computer Security, The NIST Handbook, Chapter 4, in all computer software and computer data bases (as defined in the clause entitled “Rights In Noncommercial

Computer Software and Noncommercial Computer Software Documentation” (DFARS 252.227-7014)), before delivery of that computer software or computer data base in whatever media and on whatever system the computer software or data base is delivered whether delivered separately or imbedded within delivered equipment. The Contractor warrants that when delivered any such computer software and computer data base shall be free of viruses, malware, Trojan Horses, and other security threats such as those listed in NIST Special Publication 800-12 Rev 1.

(b) The Contractor agrees that prior to use under this contract, it shall test any computer software and computer data base received from the Government for viruses, malware, Trojan Horses, and other security threats listed in NIST Special Publication 800-12 Rev 1, An Introduction to Computer Security, The NIST Handbook, Chapter 4.

(c) Any license agreement governing the use of any computer software or computer software documentation delivered to the Government as a result of this contract must be paid-up, irrevocable, world-wide, royalty-free, perpetual and flexible (user licenses transferable among Government employees and personnel under Government contract).

(d) The Contractor shall not include or permit to be included any routine to enable the contractor or its subcontractor(s) or vendor(s) to disable the computer software or computer data base after delivery to the Government.

(e) No copy protection devices or systems shall be used in any computer software or computer data base delivered under this contract with unlimited or Government purpose rights (as defined in DFARS 252.227-7013 and 252.227- 7014) to restrict or limit the Government from making copies.

(f) It is agreed that, to the extent that any technical or other data is computer software by virtue of its delivery in digital form, the Government shall be licensed to use that digital-form data with exactly the same rights and limitations as if the data had been delivered as hard copy.

(g) Any limited rights legends or other allowed legends placed by a Contractor on technical data or other data delivered in digital form shall be digitally included on the same media as the digital-form data and must be associated with the corresponding digital-form technical data to which the legend(s) apply to the extent possible.

Such legends shall also be placed in human-readable form on a visible surface of the media carrying the digital-form data as delivered, to the extent possible.

C-227-H014 PROTECTION OF DEPARTMENT OF NAVY TRADEMARKS - BASIC (NAVSEA) (JUL 2021)

(a) The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) [contracting officers shall list terms(s) (Government assigned or approved nomenclature)] (the “Designation(s)”), against the Government or others authorized by the Government to use the Designation(s) (including the word(s), name, symbol, or design) acting within the scope of such authorization (i.e. claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting). Such authorization shall be implied by the award of a Government contract to any party for the manufacture, production, distribution, use, modification, maintenance, sustainment, or packaging of the products and services identified under this contract, and the scope of such implied authorization is defined as the use of the Designation(s) in performance under such contract by the prime contractor and its subcontractors and suppliers at any tier. In all other cases, the scope of the authorization will be defined by the Government in writing.

(b) The contractor shall notify the contracting officer at least 30 days before asserting rights in, or filing an application to register, any one of the Designation(s) in any jurisdiction within the United States. Any such notification shall be in writing and shall identify the Designation(s) (including the word(s), name, symbol, or design), provide a statement as to its intended use(s) in commerce, and list the particular classes of goods or services in which registration will be sought.

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.

Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph

(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

C-239-W001 ELECTRONIC AND INFORMATION TECHNOLOGY (EIT) ACCESSIBILITY

STANDARDS/SECTION 508 COMPLIANCE (NAVSEA) (OCT 2018)

(a) Requirements for accessibility based on Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d) are determined to be relevant for product(s)/service(s) procured under this solicitation.

(b) Each Electronic and Information Technology (EIT) item or service provided under this contract shall comply with the EIT Accessibility Standards listed below:

_____ 36 C.F.R. § 1194.21 - Software applications and operating systems _____ 36 C.F.R. § 1194.22 - Web-based and internet information and applications _____ 36 C.F.R. § 1194.23 - Telecommunications products _____ 36 C.F.R. § 1194.24 - Video and multimedia products _____ 36 C.F.R. § 1194.25 - Self-contained, closed products _____ 36 C.F.R. § 1194.26 - Desktop and portable computers _____ 36 C.F.R. § 1194.31 - Functional Performance Criteria _____ 36 C.F.R. § 1194.41 - Information, Documentation, and Support

(c) For more information on Voluntary Product Accessibility Template (VPAT) and Government Product/Service Accessibility Template (GPAT) please refer to: http://www.buyaccessible.gov/ or http://www.section508.gov/content/sell/vpat.

(d) The Contractor shall comply with the VPAT or GPAT document submitted. If the Contracting Officer determines that any item or service delivered under this contract does not comply with the EIT Accessibility Standards, the Contracting Officer will notify the Contractor in writing accordingly. If the Contractor fails to promptly correct or replace the nonconforming products or services with conforming products or services within the delivery schedule contained in the contract, the Government will have the rights and remedies contained in the basic contract.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-246-H002 WARRANTY NOTIFICATION FOR ITEM(S) 0001-0004—BASIC (NAVSEA) (OCT 2018)

The Contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT N6449824PXXXX TO CONFORM TO DESIGN,

MANUFACTURING, AND PERFORMANCE REQUIREMENTS AND BE FREE FROM DEFECTS IN

MATERIAL AND WORKMANSHIP FOR 13 MONTHS FROM DATE OF ACCEPTANCE. IF ITEM IS

DEFECTIVE NOTIFY TPCO AND PCO.

(End of Text)

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)

Item(s) 0001-0004 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

E-246-H023 QUALITY REQUIREMENT FOR SOFTWARE DEVELOPMENT OR PRODUCTION (NAVSEA)

(JAN 2019)

The contractor's software quality program shall be an integral part of the overall Quality Management System.

Software quality program controls shall be applicable to all project software that is developed, maintained, or modified within the following categories:

(a) All deliverable software

(b) All deliverable software that is included as part of deliverable hardware or firmware.

(c) Non deliverable software (commercially available or user-developed) used for development, fabrication, testing, or acceptance of deliverable software or hardware (includes automated fabrication, test, and inspection/acceptance equipment software and software design, test, and inspection tools).

(d) Commercially available, reusable, or Government software designated as part of a deliverable item.

E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)

(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.

(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(d) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N64500

Issue By DoDAAC N64498

Admin DoDAAC** N64498

Inspect By DoDAAC N64498

Ship To Code N64498

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS

Appendix F.

(g) W AW F point of contact.

Erica Treichel Erica.l.treichel.civ@us.navy.mil

(1) The Contractor may obtain clarification regarding invoicing in W AW F from the following contracting activity’s W AW F point of contact.

Caitlin Tamase Caitlin.i.tamase.civ@us.navy.mil

(2) Contact the W AW F helpdesk at 8 66-618 -59 8 8 , if assistance is needed.

(E nd of clause)

G-232-H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024)

Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.

Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

G-242-H001 Government Contract Administration Points-of-Contact and Responsibilities (NAVSEA) (OCT 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Jillian Randazzo

Contracting Officer Naval Sea Systems Command (NAVSEA) Naval Surface Warfare Center Philadelphia Division 5001 South Broad Street Philadelphia, PA 19112-5083 Cell: 267-990-6035 Email: jillian.randazzo.civ@us.navy.mil

(ii) The Contract Specialist is:

Shawn Waters Contract Specialist, Code 0233 Contracts Department NSWC Philadelphia 5001 South Broad Street Bldg. 4, Flr 2, Room 2900 Philadelphia, PA 19112-5083 Gov’t Cell Phone: 267-990-6169 email: shawn.m.waters11.civ@us.navy.mil

(iii) The Administrative Contracting Officer (ACO) is:

N/A

(d) The Contracting Officer’s Representative (COR) is the contracting officer’s appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer’s Representative (COR) is:

(e) The Alternate Contracting Officer’s Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

The Alternate Contracting Officer’s Representative (ACOR) is:

(f) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

TBD

(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

The Alternate Technical Point of Contact (ATPOC) is:

(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the

(i) The Authorized Ordering Person(s) for Per-Call Maintenance is:

(j) The Contractor's point of contact for performance under this contract is:

Name: [ * ] Title: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

[ * ] To be completed at contract award

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods.

Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor’s expense with no cost or liability to the U.S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link:

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company’s established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

NSWCPD 0800 1500

(g) All deliveries to the Receiving Officer, Building 542; 1601 Langley Ave, Philadelphia, PA 19112, shall be made Monday through Friday from 0800 to 1500, local time. Deliveries will not be accepted after 1500. No deliveries will be accepted on federal government holidays.

G-242-W001 CONTRACT ADMINISTRATION FUNCTIONS (NAVSEA) (OCT 2018)

(a) In accordance with FAR 42.302(a) all functions listed are delegated to the ACO except the following items to be retained by the PCO:

All functions to be retained by PCO

(b) In accordance with FAR 42.302(b), the following additional functions are delegated to the ACO:

All functions to be retained by PCO

Section H - Special Contract Requirements

H-209-H003 REQUIRED DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST (NAVSEA)

(NOV 2022)

(a) "Organizational Conflict of Interest" means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person's objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. "Person" as used herein includes Corporations, Partnerships, Joint Ventures, and other business enterprises.

(b) The Contractor warrants that to the best of its knowledge and belief, and except as otherwise set forth in the contract, at the time of execution of this contract the Contractor does not have any organizational conflict of interest(s) as defined in paragraph (a).

(c) The Contractor agrees that, if after award, it discovers an actual or potential organizational conflict of interest, it shall make immediate and full disclosure in writing to the Contracting Officer. The notification shall include a description of the actual or potential organizational conflict of interest, a description of the action which the Contractor has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevant information that would assist the Contracting Officer in making a determination on this matter. Notwithstanding this notification, the Government may terminate the contract for the convenience of the Government if determined to be in the best interest of the Government.

(d) Notwithstanding paragraph (c) above, if the Contractor was aware, or should have been aware, of an organizational conflict of interest prior to the award of this contract or becomes, or should become, aware of an organizational conflict of interest after award of this contract and does not make an immediate and full disclosure in writing to the Contracting Officer, the Government may terminate this contract for default.

(e) If the Contractor fails to take action required by this requirement, or required by the Contracting Officer upon receipt of the Contractor’s disclosure required by paragraph (c), the Government may terminate this contract for default.

(f) The Contracting Officer's decision as to the existence or nonexistence of an actual or potential organizational conflict of interest shall be final.

(g) The Contractor shall promptly notify the Contracting Officer, in writing, if it has been tasked to evaluate or advise the Government concerning its own products or activities, those of its subcontractors, those of one of its prime contractors (to which the contractor is a subcontractor), or those of a competitor in order to ensure proper safeguards exist to guarantee objectivity and to protect the Government's interest.

(h) The Contractor shall include this requirement in subcontracts of any tier which involve access to information or situations/conditions covered by the preceding paragraphs, substituting "subcontractor" for "contractor" where appropriate.

(i) The rights and remedies described herein shall not be exclusive and are in addition to other rights and remedies provided by law or elsewhere included in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .