RSC Industry Day Questions and Answers.pdf

PDF 294 KB Posted

Attached to
Naval Surface Warfare Center Philadelphia Division (NSWCPD) Repair Station Console (RSC) Industry Day
Solicitation number
N64498-23-RFPREQ-PD-22-0060
Issued by

About this file

This document contains questions and answers from an industry day event for a forthcoming Naval Surface Warfare Center Philadelphia Division solicitation for a Repair Station Console. The opportunity will be for design-build of hardware with minimum dimensions of 19 inches that includes fuel and oil labs with touchscreen capability, while the RSC component cannot have touchscreen. Clarification was provided that enveloped specifications and product requirements will be included in the solicitation. Inquiries were made about secret requirements, first article testing, and security clearance needs, with responses noting further information will be provided in the solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RSC Industry Day Attendee’s and Questions and Answers:

Attendee’s:

- Ed Malinowski - emalinowski@wesco.com

- Keith Vreeland - kvreeland@comarkcorp.com

- Jack Smith - jack.e.smith@leidos.com

- Jonny Kim - jong.kim@leidos.com

- Cody Miller - daniel.c.miller@leidos.com

- Shawn Breegle - breegles@leidos.com

- Robert King - robert.t.king@leidos.com

- John Reichl - j.reichl@drs.com

- William Hock - william.hock@drs.com

Q&A Session:

1. Question: With set up of first article testing, is this design build or is it build to print?

a. Answer: This is design build.

2. Question: With design build is there an NRE task that would be associated with the first article?

a. Answer: Yes, that is correct.

3. Question: What is the purpose of the secret requirement? Why is there a secret requirement on a set of hardware that’s being delivered to an endpoint that doesn’t have software loaded?

a. Answer: This question is still under review at this time, further information will be provided at time of solicitation.

4. Question: Regarding the minimum dimension requirement of 19 inches minimum is there a desired size, and if so, is there a GFI provided to show what a maximum dimension should be achieved?

a. Answer: This would be enveloped specifications in the product specifications that would be provided. Official solicitation will include enveloped specifications

5. Question: Mention of touch screen as desired in the oil lab as opposed to additional labs, should not all be touch screen.

a. Answer: No, only fuel and oil lab can have touch screen, RSC cannot have touch screen, which is due to some software requirements separate from this. However, the RSC could also have the ability to be if they can also be disabled that would be acceptable.

To clarify, the touchscreen feature can only be active on the FOLPC.

6. Question: Clarification into the Security question above, specifically for key personnel always had the security clearance requirement, the question of specifically who needs the clearance when it comes to production staff?

a. Answer: This question is still under review at this time, further information will be provided at time of solicitation.