N6449820R4018.docx
DOCX document 308 KB Posted
- Attached to
- Siemens/RuggedCom network switching equipment
- Solicitation number
- N6449820R4018
About this file
This is a combined synopsis and solicitation from the Department of the Navy seeking quotes for Siemens/RuggedCom networking switching equipment to be awarded as a small business set-aside contract. Required products include empty chassis, power supplies, line modules, switch modules, and accessories for Siemens/RuggedCom MX5000 equipment. Quotes are due by May 15, 2020 and the ordering period will be from date of award through 60 months thereafter. Delivery will be to Philadelphia, PA. Quoters must be registered in SAM and include completed provision and clauses with their quotes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20-JNS-007 JA (redacted).pdf | ||
| N6449820R4018-0001.pdf | ||
| Siemens RuggedCom JA Attachment (Redacted).pdf | ||
| Siemens RuggedCom JA (Redacted) .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6449820R4018
Section SF 1449 - CONTINUATION SHEET
RFP INFORMATION
The Naval Surface Warfare Center Philadelphia Division (NSWCPD) proposes to award a single Total Small Business Set Aside for this requirement.
MINIMUM AND MAXIMUM QUANTITIES
As referred to in paragraph (b) of FAR clause 52.216-22 “Indefinite-Quantity”, the total required contract minimum is $500.00. The required contract minimum quantity will be met by the issuance of the first task order.
The contract maximum is the total amount of all CLINs. The maximum amount is not to be exceeded without prior approval of the Procuring Contracting Officer.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
6GK6050-0MB00-0AG1
FFP
YEAR 1
Siemens/RUGGEDCOM MX5000 empty chassis: Front panel with Fan Controller and Power Terminal Blocks Conformal Coating Ordering period: 1 July 2020 - 3 June 2021 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PURCHASE REQUEST NUMBER: 20JNS007
PSC CD: 5895
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 28 |
| Each |
6GK6050-0MB00-0AG1
YEAR 2
Siemens/RUGGEDCOM MX5000 empty chassis: Front panel with Fan Controller and Power Terminal Blocks Conformal Coating Ordering period: 1 July 2021 - 3 June 2022 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 48 |
| Each |
6GK6050-0MB00-0AG1
YEAR 3
Siemens/RUGGEDCOM MX5000 empty chassis: Front panel with Fan Controller and Power Terminal Blocks Conformal Coating Ordering period: 1 July 2022 - 3 June 2023 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 88 |
| Each |
6GK6050-0MB00-0AG1
YEAR 4
Siemens/RUGGEDCOM MX5000 empty chassis: Front panel with Fan Controller and Power Terminal Blocks Conformal Coating Ordering period: 1 July 2023 - 3 June 2024 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
6GK6050-0MB00-0AG1
YEAR 5
Siemens/RUGGEDCOM MX5000 empty chassis: Front panel with Fan Controller and Power Terminal Blocks Conformal Coating Ordering period: 1 July 2024 - 3 June 2025 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0AH1
YEAR 1
Siemens/RUGGEDCOM MX5000 empty chassis: Front Panel with Power Terminal Blocks Conformal Coating Ordering period: 1 July 2020 - 3- June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0AH1
YEAR 2
Siemens/RUGGEDCOM MX5000 empty chassis: Front Panel with Power Terminal Blocks Conformal Coating Ordering period: 1 July 2021 - 3- June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0AH1
YEAR 3
Siemens/RUGGEDCOM MX5000 empty chassis: Front Panel with Power Terminal Blocks Conformal Coating Ordering period: 1 July 2022 - 3- June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0AH1
YEAR 4
Siemens/RUGGEDCOM MX5000 empty chassis: Front Panel with Power Terminal Blocks Conformal Coating Ordering period: 1 July 2023 - 3- June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0AH1
YEAR 5
Siemens/RUGGEDCOM MX5000 empty chassis: Front Panel with Power Terminal Blocks Conformal Coating Ordering period: 1 July 2024 - 3- June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0CA0
YEAR 1
Siemens/RUGGEDCOM MX5000 Panel Mount Kit, RX5000, MX5000 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0CA0
YEAR 2
Siemens/RUGGEDCOM MX5000 Panel Mount Kit, RX5000, MX5000 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0CA0
YEAR 3
Siemens/RUGGEDCOM MX5000 Panel Mount Kit, RX5000, MX5000 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0CA0
YEAR 4
Siemens/RUGGEDCOM MX5000 Panel Mount Kit, RX5000, MX5000 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0MB00-0CA0
YEAR 5
Siemens/RUGGEDCOM MX5000 Panel Mount Kit, RX5000, MX5000 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
6GK6050-0MB00-0DA0
YEAR 1
Siemens/RUGGEDCOM MX5000 19 Inch Rack Mount Kit, RX5000, MX5000 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 28 |
| Each |
6GK6050-0MB00-0DA0
YEAR 2
Siemens/RUGGEDCOM MX5000 19 Inch Rack Mount Kit, RX5000, MX5000 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 48 |
| Each |
6GK6050-0MB00-0DA0
YEAR 3
Siemens/RUGGEDCOM MX5000 19 Inch Rack Mount Kit, RX5000, MX5000 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 88 |
| Each |
6GK6050-0MB00-0DA0
YEAR 4
Siemens/RUGGEDCOM MX5000 19 Inch Rack Mount Kit, RX5000, MX5000 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
6GK6050-0MB00-0DA0
YEAR 5
Siemens/RUGGEDCOM MX5000 19 Inch Rack Mount Kit, RX5000, MX5000 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 160 |
| Each |
6GK6050-0ML16-0AA1
YEAR 1
Siemens/RUGGEDCOM Power Supply 88- 300VDC or 85 - 264VAC supports Terminal Block on Front Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 56 |
| Each |
6GK6050-0ML16-0AA1
YEAR 2
Siemens/RUGGEDCOM Power Supply 88- 300VDC or 85 - 264VAC supports Terminal Block on Front Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 96 |
| Each |
6GK6050-0ML16-0AA1
YEAR 3
Siemens/RUGGEDCOM Power Supply 88- 300VDC or 85 - 264VAC supports Terminal Block on Front Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 176 |
| Each |
6GK6050-0ML16-0AA1
YEAR 4
Siemens/RUGGEDCOM Power Supply 88- 300VDC or 85 - 264VAC supports Terminal Block on Front Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 16 |
| Each |
6GK6050-0ML16-0AA1
YEAR 5
Siemens/RUGGEDCOM Power Supply 88- 300VDC or 85 - 264VAC supports Terminal Block on Front Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0AA1
YEAR 1
Siemens/RUGGEDCOM Line module Blank Module Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0AA1
YEAR 2
Siemens/RUGGEDCOM Line module Blank Module Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0AA1
YEAR 3
Siemens/RUGGEDCOM Line module Blank Module Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0AA1
YEAR 4
Siemens/RUGGEDCOM Line module Blank Module Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0AA1
YEAR 5
Siemens/RUGGEDCOM Line module Blank Module Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 434 |
| Each |
6GK6050-0ML20-0BD1
YEAR 1
Siemens/RUGGEDCOM Line module 8x 100FX Multimode LC 2km Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 122 |
| Each |
6GK6050-0ML20-0BD1
YEAR 2
Siemens/RUGGEDCOM Line module 8x 100FX Multimode LC 2km Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 242 |
| Each |
6GK6050-0ML20-0BD1
YEAR 3
Siemens/RUGGEDCOM Line module 8x 100FX Multimode LC 2km Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 482 |
| Each |
6GK6050-0ML20-0BD1
YEAR 4
Siemens/RUGGEDCOM Line module 8x 100FX Multimode LC 2km Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BD1
YEAR 5
Siemens/RUGGEDCOM Line module 8x 100FX Multimode LC 2km Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BH1
YEAR 1
Siemens/RUGGEDCOM Line module 4x 100FX Multimode LC 2km Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BH1
YEAR 2
Siemens/RUGGEDCOM Line module 4x 100FX Multimode LC 2km Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BH1
YEAR 3
Siemens/RUGGEDCOM Line module 4x 100FX Multimode LC 2km Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BH1
YEAR 4
Siemens/RUGGEDCOM Line module 4x 100FX Multimode LC 2km Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BH1
YEAR 5
Siemens/RUGGEDCOM Line module 4x 100FX Multimode LC 2km Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BK1
YEAR 1
Siemens/RUGGEDCOM Line module 4x 1000SX Multimode, 850nm, LC, 500m Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BK1
YEAR 2
Siemens/RUGGEDCOM Line module 4x 1000SX Multimode, 850nm, LC, 500m Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BK1
YEAR 3
Siemens/RUGGEDCOM Line module 4x 1000SX Multimode, 850nm, LC, 500m Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BK1
YEAR 4
Siemens/RUGGEDCOM Line module 4x 1000SX Multimode, 850nm, LC, 500m Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0BK1
YEAR 5
Siemens/RUGGEDCOM Line module 4x 1000SX Multimode, 850nm, LC, 500m Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Each |
6GK6050-0ML20-0CR1
YEAR 1
Siemens/RUGGEDCOM Line module 4x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Each |
6GK6050-0ML20-0CR1
YEAR 2
Siemens/RUGGEDCOM Line module 4x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Each |
6GK6050-0ML20-0CR1
YEAR 3
Siemens/RUGGEDCOM Line module 4x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Each |
6GK6050-0ML20-0CR1
YEAR 4
Siemens/RUGGEDCOM Line module 4x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Each |
6GK6050-0ML20-0CR1
YEAR 5
Siemens/RUGGEDCOM Line module 4x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0FD1
YEAR 1
Siemens/RUGGEDCOM Line module 4x 10/100/1000TX microD Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0FD1
YEAR 2
Siemens/RUGGEDCOM Line module 4x 10/100/1000TX microD Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0FD1
YEAR 3
Siemens/RUGGEDCOM Line module 4x 10/100/1000TX microD Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0FD1
YEAR 4
Siemens/RUGGEDCOM Line module 4x 10/100/1000TX microD Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0FD1
YEAR 5
Siemens/RUGGEDCOM Line module 4x 10/100/1000TX microD Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0KB1
YEAR 1
Siemens/RUGGEDCOM Line module 8x RS232/RS422/RS485 via DB9 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0KB1
YEAR 2
Siemens/RUGGEDCOM Line module 8x RS232/RS422/RS485 via DB9 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0KB1
YEAR 3
Siemens/RUGGEDCOM Line module 8x RS232/RS422/RS485 via DB9 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0KB1
YEAR 4
Siemens/RUGGEDCOM Line module 8x RS232/RS422/RS485 via DB9 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0KB1
YEAR 5
Siemens/RUGGEDCOM Line module 8x RS232/RS422/RS485 via DB9 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0NB1
YEAR 1
Siemens/RUGGEDCOM Line Module 16x 10/100 BaseTX RJ45 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0NB1
YEAR 2
Siemens/RUGGEDCOM Line Module 16x 10/100 BaseTX RJ45 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0NB1
YEAR 3
Siemens/RUGGEDCOM Line Module 16x 10/100 BaseTX RJ45 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0NB1
YEAR 4
Siemens/RUGGEDCOM Line Module 16x 10/100 BaseTX RJ45 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0NB1
YEAR 5
Siemens/RUGGEDCOM Line Module 16x 10/100 BaseTX RJ45 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0ND1
YEAR 1
Siemens/RUGGEDCOM Line module 8x 10/100 BaseTX MicroD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0ND1
YEAR 2
Siemens/RUGGEDCOM Line module 8x 10/100 BaseTX MicroD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0ND1
YEAR 3
Siemens/RUGGEDCOM Line module 8x 10/100 BaseTX MicroD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0ND1
YEAR 4
Siemens/RUGGEDCOM Line module 8x 10/100 BaseTX MicroD Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML20-0ND1
YEAR 5
Siemens/RUGGEDCOM Line module 8x 10/100 BaseTX MicroD Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
6GK6050-0ML30-0BA1
YEAR 1
Siemens/RUGGEDCOM Control Module with Layer 3 Standard Edition Layer-3-Hardware Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 28 |
| Each |
6GK6050-0ML30-0BA1
YEAR 2
Siemens/RUGGEDCOM Control Module with Layer 3 Standard Edition Layer-3-Hardware Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 48 |
| Each |
6GK6050-0ML30-0BA1
YEAR 3
Siemens/RUGGEDCOM Control Module with Layer 3 Standard Edition Layer-3-Hardware Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 88 |
| Each |
6GK6050-0ML30-0BA1
YEAR 4
Siemens/RUGGEDCOM Control Module with Layer 3 Standard Edition Layer-3-Hardware Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
6GK6050-0ML30-0BA1
YEAR 5
Siemens/RUGGEDCOM Control Module with Layer 3 Standard Edition Layer-3-Hardware Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML30-0CA1
YEAR 1
Siemens/RUGGEDCOM Control Module with Layer 3 Security Edition Layer-3-Hardware Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML30-0CA1
YEAR 2
Siemens/RUGGEDCOM Control Module with Layer 3 Security Edition Layer-3-Hardware Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML30-0CA1
YEAR 3
Siemens/RUGGEDCOM Control Module with Layer 3 Security Edition Layer-3-Hardware Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML30-0CA1
YEAR 4
Siemens/RUGGEDCOM Control Module with Layer 3 Security Edition Layer-3-Hardware Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML30-0CA1
YEAR 5
Siemens/RUGGEDCOM Control Module with Layer 3 Security Edition Layer-3-Hardware Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0RA1
YEAR 1
Siemens/RUGGEDCOM Switch module with 2x 1000LX Singlemode, 1310nm LC, 10km Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0RA1
YEAR 2
Siemens/RUGGEDCOM Switch module with 2x 1000LX Singlemode, 1310nm LC, 10km Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0RA1
YEAR 3
Siemens/RUGGEDCOM Switch module with 2x 1000LX Singlemode, 1310nm LC, 10km Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0RA1
YEAR 4
Siemens/RUGGEDCOM Switch module with 2x 1000LX Singlemode, 1310nm LC, 10km Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0RA1
YEAR 5
Siemens/RUGGEDCOM Switch module with 2x 1000LX Singlemode, 1310nm LC, 10km Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0VA1
YEAR 1
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, no uplink ports Conformal Coating Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0VA1
YEAR 2
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, no uplink ports Conformal Coating Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0VA1
YEAR 3
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, no uplink ports Conformal Coating Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0VA1
YEAR 4
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, no uplink ports Conformal Coating Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0VA1
YEAR 5
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, no uplink ports Conformal Coating Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0WA1
YEAR 1
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G SFP+ Slots Blank Conformal Coating Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0WA1
YEAR 2
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G SFP+ Slots Blank Conformal Coating Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0WA1
YEAR 3
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G SFP+ Slots Blank Conformal Coating Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0WA1
YEAR 4
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G SFP+ Slots Blank Conformal Coating Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0ML40-0WA1
YEAR 5
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G SFP+ Slots Blank Conformal Coating Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 80 |
| Each |
6GK6050-0ML40-0XA1
YEAR 1
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G-LR Singlemode, 1310nm, LC, 10km SFP+ ports (populated) Conformal Coating Ordering period: 1 July 2020 - 30 June 2021 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 28 |
| Each |
6GK6050-0ML40-0XA1
YEAR 2
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G-LR Singlemode, 1310nm, LC, 10km SFP+ ports (populated) Conformal Coating Ordering period: 1 July 2021 - 30 June 2022 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 48 |
| Each |
6GK6050-0ML40-0XA1
YEAR 3
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G-LR Singlemode, 1310nm, LC, 10km SFP+ ports (populated) Conformal Coating Ordering period: 1 July 2022 - 30 June 2023 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 88 |
| Each |
6GK6050-0ML40-0XA1
YEAR 4
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G-LR Singlemode, 1310nm, LC, 10km SFP+ ports (populated) Conformal Coating Ordering period: 1 July 2023 - 30 June 2024 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
6GK6050-0ML40-0XA1
YEAR 5
Siemens/RUGGEDCOM Switch module Layer 3/88 Gigabit Throughput, 2x 10G-LR Singlemode, 1310nm, LC, 10km SFP+ ports (populated) Conformal Coating Ordering period: 1 July 2024 - 30 June 2025 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
6GK6050-0ML20-0PR1
YEAR 1
Siemens/RUGGEDCOM Line module PRP/HSR, 2x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
6GK6050-0ML20-0PR1
YEAR 2
Siemens/RUGGEDCOM Line module PRP/HSR, 2x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
6GK6050-0ML20-0PR1
YEAR 3
Siemens/RUGGEDCOM Line module PRP/HSR, 2x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
6GK6050-0ML20-0PR1
YEAR 4
Siemens/RUGGEDCOM Line module PRP/HSR, 2x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4 |
| Each |
6GK6050-0ML20-0PR1
YEAR 5
Siemens/RUGGEDCOM Line module PRP/HSR, 2x 1000LX Singlemode, 1310nm, LC, 10km Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0DA0
YEAR 1
Siemens/RUGGEDCOM RuggedEnclosure Mounting option for the RUGGEDCOM MX5000 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0DA0
YEAR 2
Siemens/RUGGEDCOM RuggedEnclosure Mounting option for the RUGGEDCOM MX5000 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0DA0
YEAR 3
Siemens/RUGGEDCOM RuggedEnclosure Mounting option for the RUGGEDCOM MX5000 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0DA0
YEAR 4
Siemens/RUGGEDCOM RuggedEnclosure Mounting option for the RUGGEDCOM MX5000 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0DA0
YEAR 5
Siemens/RUGGEDCOM RuggedEnclosure Mounting option for the RUGGEDCOM MX5000 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0FT0
YEAR 1
Siemens/RUGGEDCOM REPN-FT01 Fan Tray with 6 Fans, does not include controller Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0FT0
YEAR 2
Siemens/RUGGEDCOM REPN-FT01 Fan Tray with 6 Fans, does not include controller Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0FT0
YEAR 3
Siemens/RUGGEDCOM REPN-FT01 Fan Tray with 6 Fans, does not include controller Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0FT0
YEAR 4
Siemens/RUGGEDCOM REPN-FT01 Fan Tray with 6 Fans, does not include controller Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0FT0
YEAR 5
Siemens/RUGGEDCOM REPN-FT01 Fan Tray with 6 Fans, does not include controller Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XF0
YEAR 1
Siemens/RUGGEDCOM REPN-XXF Full Blank Panel Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XF0
YEAR 2
Siemens/RUGGEDCOM REPN-XXF Full Blank Panel Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XF0
YEAR 3
Siemens/RUGGEDCOM REPN-XXF Full Blank Panel Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XF0
YEAR 4
Siemens/RUGGEDCOM REPN-XXF Full Blank Panel Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XF0
YEAR 5
Siemens/RUGGEDCOM REPN-XXF Full Blank Panel Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XH0
YEAR 1
Siemens/RUGGEDCOM REPN-XXH Half Blank Panel Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XH0
YEAR 2
Siemens/RUGGEDCOM REPN-XXH Half Blank Panel Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XH0
YEAR 3
Siemens/RUGGEDCOM REPN-XXH Half Blank Panel Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XH0
YEAR 4
Siemens/RUGGEDCOM REPN-XXH Half Blank Panel Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0XH0
YEAR 5
Siemens/RUGGEDCOM REPN-XXH Half Blank Panel Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1CP0
YEAR 1
Siemens/RUGGEDCOM REPN-CP01 Control Module, Configuration for the MX5000 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1CP0
YEAR 2
Siemens/RUGGEDCOM REPN-CP01 Control Module, Configuration for the MX5000 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1CP0
YEAR 3
Siemens/RUGGEDCOM REPN-CP01 Control Module, Configuration for the MX5000 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1CP0
YEAR 4
Siemens/RUGGEDCOM REPN-CP01 Control Module, Configuration for the MX5000 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1CP0
YEAR 5
Siemens/RUGGEDCOM REPN-CP01 Control Module, Configuration for the MX5000 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1PS0
YEAR 1
Siemens/RUGGEDCOM REPN-PSP01 Power Connection, Configuration for the MX5000 for Power Module 1 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1PS0
YEAR 2
Siemens/RUGGEDCOM REPN-PSP01 Power Connection, Configuration for the MX5000 for Power Module 1 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1PS0
YEAR 3
Siemens/RUGGEDCOM REPN-PSP01 Power Connection, Configuration for the MX5000 for Power Module 1 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1PS0
YEAR 4
Siemens/RUGGEDCOM REPN-PSP01 Power Connection, Configuration for the MX5000 for Power Module 1 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1PS0
YEAR 5
Siemens/RUGGEDCOM REPN-PSP01 Power Connection, Configuration for the MX5000 for Power Module 1 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1SP0
YEAR 1
Siemens/RUGGEDCOM REPN-SP01 Switch Module, Configuration 2x Singlemode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1SP0
YEAR 2
Siemens/RUGGEDCOM REPN-SP01 Switch Module, Configuration 2x Singlemode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1SP0
YEAR 3
Siemens/RUGGEDCOM REPN-SP01 Switch Module, Configuration 2x Singlemode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1SP0
YEAR 4
Siemens/RUGGEDCOM REPN-SP01 Switch Module, Configuration 2x Singlemode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-1SP0
YEAR 5
Siemens/RUGGEDCOM REPN-SP01 Switch Module, Configuration 2x Singlemode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PS0
YEAR 1
Siemens/RUGGEDCOM REPN-PSP02 Power Connection, Configuration for the MX5000 for Power Module 2 Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PS0
YEAR 2
Siemens/RUGGEDCOM REPN-PSP02 Power Connection, Configuration for the MX5000 for Power Module 2 Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PS0
YEAR 3
Siemens/RUGGEDCOM REPN-PSP02 Power Connection, Configuration for the MX5000 for Power Module 2 Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PS0
YEAR 4
Siemens/RUGGEDCOM REPN-PSP02 Power Connection, Configuration for the MX5000 for Power Module 2 Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PS0
YEAR 5
Siemens/RUGGEDCOM REPN-PSP02 Power Connection, Configuration for the MX5000 for Power Module 2 Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4MM0
YEAR 1
Siemens/RUGGEDCOM REPN-4FMM1 4x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4MM0
YEAR 2
Siemens/RUGGEDCOM REPN-4FMM1 4x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4MM0
YEAR 3
Siemens/RUGGEDCOM REPN-4FMM1 4x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4MM0
YEAR 4
Siemens/RUGGEDCOM REPN-4FMM1 4x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4MM0
YEAR 5
Siemens/RUGGEDCOM REPN-4FMM1 4x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4RD0
YEAR 1
Siemens/RUGGEDCOM REPN-4RUD1 4x Micro-D connectors to RJ45 connectors Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4RD0
YEAR 2
Siemens/RUGGEDCOM REPN-4RUD1 4x Micro-D connectors to RJ45 connectors Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4RD0
YEAR 3
Siemens/RUGGEDCOM REPN-4RUD1 4x Micro-D connectors to RJ45 connectors Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4RD0
YEAR 4
Siemens/RUGGEDCOM REPN-4RUD1 4x Micro-D connectors to RJ45 connectors Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4RD0
YEAR 5
Siemens/RUGGEDCOM REPN-4RUD1 4x Micro-D connectors to RJ45 connectors Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4SM0
YEAR 1
Siemens/RUGGEDCOM REPN-4FSM1 4x Single Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4SM0
YEAR 2
Siemens/RUGGEDCOM REPN-4FSM1 4x Single Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4SM0
YEAR 3
Siemens/RUGGEDCOM REPN-4FSM1 4x Single Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4SM0
YEAR 4
Siemens/RUGGEDCOM REPN-4FSM1 4x Single Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-4SM0
YEAR 5
Siemens/RUGGEDCOM REPN-4FSM1 4x Single Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8MM0
YEAR 1
Siemens/RUGGEDCOM REPN-8FMM1 8x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2020 - 30 June 2021 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8MM0
YEAR 2
Siemens/RUGGEDCOM REPN-8FMM1 8x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2021 - 30 June 2022 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8MM0
YEAR 3
Siemens/RUGGEDCOM REPN-8FMM1 8x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2022 - 30 June 2023 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8MM0
YEAR 4
Siemens/RUGGEDCOM REPN-8FMM1 8x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2023 - 30 June 2024 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8MM0
YEAR 5
Siemens/RUGGEDCOM REPN-8FMM1 8x Multi Mode Military Circular Fiber Connectors with LC connectors Ordering period: 1 July 2024 - 30 June 2025 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8RD0
YEAR 1
Siemens/RUGGEDCOM REPN-8RUD1 8x Micro-D connectors to RJ45 connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8RD0
YEAR 2
Siemens/RUGGEDCOM REPN-8RUD1 8x Micro-D connectors to RJ45 connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8RD0
YEAR 3
Siemens/RUGGEDCOM REPN-8RUD1 8x Micro-D connectors to RJ45 connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8RD0
YEAR 4
Siemens/RUGGEDCOM REPN-8RUD1 8x Micro-D connectors to RJ45 connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8RD0
YEAR 5
Siemens/RUGGEDCOM REPN-8RUD1 8x Micro-D connectors to RJ45 connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8DR0
YEAR 1
Siemens/RUGGEDCOM REPN-8SDRJ 8x DB9 connectors to MIL connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8DR0
YEAR 2
Siemens/RUGGEDCOM REPN-8SDRJ 8x DB9 connectors to MIL connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8DR0
YEAR 3
Siemens/RUGGEDCOM REPN-8SDRJ 8x DB9 connectors to MIL connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8DR0
YEAR 4
Siemens/RUGGEDCOM REPN-8SDRJ 8x DB9 connectors to MIL connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-8DR0
YEAR 5
Siemens/RUGGEDCOM REPN-8SDRJ 8x DB9 connectors to MIL connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PR0
YEAR 1
Siemens/RUGGEDCOM PRP Panel with A and B ports SM fiber RUGGEDCOM 2x Single Mode Military Circular Fiber Connectors with LC connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PR0
YEAR 2
Siemens/RUGGEDCOM PRP Panel with A and B ports SM fiber RUGGEDCOM 2x Single Mode Military Circular Fiber Connectors with LC connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PR0
YEAR 3
Siemens/RUGGEDCOM PRP Panel with A and B ports SM fiber RUGGEDCOM 2x Single Mode Military Circular Fiber Connectors with LC connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PR0
YEAR 4
Siemens/RUGGEDCOM PRP Panel with A and B ports SM fiber RUGGEDCOM 2x Single Mode Military Circular Fiber Connectors with LC connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-2PR0
YEAR 5
Siemens/RUGGEDCOM PRP Panel with A and B ports SM fiber RUGGEDCOM 2x Single Mode Military Circular Fiber Connectors with LC connectors
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-6RR0
YEAR 1
Siemens/RUGGEDCOM 12-16x RJ-45 connectors to MIL connectors Ordering period: 1 July 2020 - 30 June 2021 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-6RR0
YEAR 2
Siemens/RUGGEDCOM 12-16x RJ-45 connectors to MIL connectors Ordering period: 1 July 2021 - 30 June 2022 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-6RR0
YEAR 3
Siemens/RUGGEDCOM 12-16x RJ-45 connectors to MIL connectors Ordering period: 1 July 2022 - 30 June 2023 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-6RR0
YEAR 4
Siemens/RUGGEDCOM 12-16x RJ-45 connectors to MIL connectors Ordering period: 1 July 2023 - 30 June 2024 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-6RR0
YEAR 5
Siemens/RUGGEDCOM 12-16x RJ-45 connectors to MIL connectors Ordering period: 1 July 2024 - 30 June 2025 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0CS0
YEAR 1
Siemens/RUGGEDCOM Cover clamps and Screws for MX5000RE Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0CS0
YEAR 2
Siemens/RUGGEDCOM Cover clamps and Screws for MX5000RE Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0CS0
YEAR 3
Siemens/RUGGEDCOM Cover clamps and Screws for MX5000RE Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0CS0
YEAR 4
Siemens/RUGGEDCOM Cover clamps and Screws for MX5000RE Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR00-0CS0
YEAR 5
Siemens/RUGGEDCOM Cover clamps and Screws for MX5000RE Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 56 |
| Each |
6GK6050-0AR00-0CG0
YEAR 1
Siemens/RUGGEDCOM RuggedEnclosure cover and EMI glass Ordering period: 1 July 2020 - 30 June 2021
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 90 |
| Each |
6GK6050-0AR00-0CG0
YEAR 2
Siemens/RUGGEDCOM RuggedEnclosure cover and EMI glass Ordering period: 1 July 2021 - 30 June 2022
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 16 |
| Each |
6GK6050-0AR00-0CG0
YEAR 3
Siemens/RUGGEDCOM RuggedEnclosure cover and EMI glass Ordering period: 1 July 2022 - 30 June 2023
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 38 |
| Each |
6GK6050-0AR00-0CG0
YEAR 4
Siemens/RUGGEDCOM RuggedEnclosure cover and EMI glass Ordering period: 1 July 2023 - 30 June 2024
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 60 |
| Each |
6GK6050-0AR00-0CG0
YEAR 5
Siemens/RUGGEDCOM RuggedEnclosure cover and EMI glass Ordering period: 1 July 2024 - 30 June 2025
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR10-0GA0-Z
6GK6050-0AR10-0GA0-Z A00+B00+C00+D00+E00+F00+G00+H00+J00+K00
YEAR 1
Siemens/RUGGEDCOM RE RuggedEnclosure; hard mount enclosure Ordering period: 1 July 2020 - 30 June 2021 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR10-0GA0-Z
6GK6050-0AR10-0GA0-Z A00+B00+C00+D00+E00+F00+G00+H00+J00+K00
YEAR 2
Siemens/RUGGEDCOM RE RuggedEnclosure; hard mount enclosure Ordering period: 1 July 2021 - 30 June 2022 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR10-0GA0-Z
6GK6050-0AR10-0GA0-Z A00+B00+C00+D00+E00+F00+G00+H00+J00+K00
YEAR 3
Siemens/RUGGEDCOM RE RuggedEnclosure; hard mount enclosure Ordering period: 1 July 2022 - 30 June 2023 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR10-0GA0-Z
6GK6050-0AR10-0GA0-Z A00+B00+C00+D00+E00+F00+G00+H00+J00+K00
YEAR 4
Siemens/RUGGEDCOM RE RuggedEnclosure; hard mount enclosure Ordering period: 1 July 2023 - 30 June 2024 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
6GK6050-0AR10-0GA0-Z
6GK6050-0AR10-0GA0-Z A00+B00+C00+D00+E00+F00+G00+H00+J00+K00
YEAR 5
Siemens/RUGGEDCOM RE RuggedEnclosure; hard mount enclosure Ordering period: 1 July 2024 - 30 June 2025 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
MX5000RE-EDGE-1
YEAR 1
Siemens/RUGGEDCOM MX5000RE EDGE SWITCH Base Configuration MX5000RE w/:
- Fan Controller & Pwr Terminal Blocks on Front Panel
- RuggedEnclosure Mounting for MX5000
- 2 88-300VDC or 85-264VAC Power Supplies
- Layer 3, 88G Switch Module w/ no uplink ports
- Control Module
- Layer 3 Standard Edition Software
- REMOVE (6 Blank Line Modules) (LM1,LM2,LM3,LM4,LM5 and LM6) Ordering period: 1 July 2020 - 30 June 2021 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
MX5000RE-EDGE-1
YEAR 2
Siemens/RUGGEDCOM MX5000RE EDGE SWITCH Base Configuration MX5000RE w/:
- Fan Controller & Pwr Terminal Blocks on Front Panel
- RuggedEnclosure Mounting for MX5000
- 2 88-300VDC or 85-264VAC Power Supplies
- Layer 3, 88G Switch Module w/ no uplink ports
- Control Module
- Layer 3 Standard Edition Software
- REMOVE (6 Blank Line Modules) (LM1,LM2,LM3,LM4,LM5 and LM6) Ordering period: 1 July 2021 - 30 June 2022 NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2 |
| Each |
MX5000RE-EDGE-1
YEAR 3
Siemens/RUGGEDCOM MX5000RE EDGE SWITCH Base Configuration MX5000RE w/:
- Fan Controller & Pwr Terminal Blocks on Front Panel
- RuggedEnclosure Mounting for MX5000
- 2 88-300VDC or 85-264VAC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .