About this file
This document is a solicitation for a contract (N6449824P5120) for the preventative and corrective maintenance of air compressors and dryers at the Naval Foundry and Propeller Center in Philadelphia, PA. The contract is for a one-year period and includes 21 CLINs for scheduled quarterly or bi-annual maintenance visits on various air compressor and dryer models. An additional CLIN allows for up to $36,600 in additional repairs as needed. The contract was awarded to ACE CONTROLS & INSTRUMENTATION INC on March 26, 2024 for a total of $136,119.00. The work is to be performed at the Naval Foundry and Propeller Center in accordance with the detailed Statement of Work. The solicitation was issued by the Department of the Navy Naval Sea Systems Command.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N6449824Q4008 30-Nov-2023
b. TELEPHONE NUMBER
215.897.7368
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 21 Feb 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
X
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.610-876-2000 EXT 201
N644989. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
N6449824P5120 26-Mar-2024
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KARETTE A BRISSETT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
1301148358
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
SEAN M MCCOLGAN / CONTRACT SPECIALIST
See Schedule $136,119.00
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE SCHEDULE
.15-Feb-2024 YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE 3RBC3 FACILITY
OFFEROR CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0223, MELISSA FORD
MELISSA.E.FORD3.CIV@US.NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
ACE CONTROLS & INSTRUMENTATION INC
JOHN MCCROSSAN
3905 W 9TH ST STE F
MARCUS HOOK PA 19061-5244
NSWC PHILA, NAVY ERP
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
18a. PAYMENT WILL BE MADE BY CODE N64500
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE
SEE ITEM 9
SCD: C
15. DELIVER TO CODE N00151 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NAVAL FOUNDRY & PROPELLER CENTER
JAMES ADGALANE
1701 KITTY HAWK AVE
RECEIVING GATE 3
PHILADELPHIA PA 19112
FAX:
TEL: 445-942-2589 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,000
NAICS:
333912
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
X
EMAIL: sean.m.mccolgan.civ@us.navy.mil
215-897-3071TEL:
31c. DATE SIGNED
26-Mar-2024
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF77
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N6449824P5120
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot $4,739.00 $4,739.00 IRN60H-CC Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
PURCHASE REQUEST NUMBER: 1301148358
PSC CD: J043
NET AMT $4,739.00
ACRN AA
CIN: 130114835800001
$4,739.00
0002 1 Lot $4,739.00 $4,739.00 NVC400A400 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800002
0003 1 Lot $4,739.00 $4,739.00 R110i-A125 Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800003
0004 1 Lot $4,739.00 $4,739.00 NVC600A4H0 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800004
0005 1 Lot $4,739.00 $4,739.00 SF22+ Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800005
0006 1 Lot $4,739.00 $4,739.00 DA212ECA100 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800006
0007 1 Lot $4,739.00 $4,739.00 SSR-EP60 Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800007
0008 1 Lot $4,739.00 $4,739.00 BSD50 Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800008
0009 1 Lot $4,739.00 $4,739.00 KADPS-260 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800009
0010 1 Lot $4,739.00 $4,739.00 NVC400A40N Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800010
0011 1 Lot $4,739.00 $4,739.00 IR45IE-A-125 Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800011
0012 1 Lot $4,739.00 $4,739.00 IR45IE-A-125 Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800012
0013 1 Lot $4,739.00 $4,739.00 SX 7.5 Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800013
0014 1 Lot $4,739.00 $4,739.00 60UDVAW Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800014
0015 1 Lot $4,739.00 $4,739.00 SPRF-470A-436 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800015
0016 1 Lot $4,739.00 $4,739.00 TMS0380 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800016
0017 1 Lot $4,739.00 $4,739.00 60UDMBW Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800017
0018 1 Lot $4,739.00 $4,739.00 SSR-EP20SE Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800018
0019 1 Lot $4,739.00 $4,739.00 TMS0200 Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800019
0020 1 Lot $4,739.00 $4,739.00 SSR-EP20SE Compressor
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800020
0021 1 Lot $4,739.00 $4,739.00 GA15FF Compressor w/ Dryer
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: 1 Lot = 4 Visits Per Year FOB: Destination
CIN: 130114835800021
0022 1 Lot $36,600.00 $36,600.00 Additional Repairs
FFP
All work shall be completed in accordance with Section C, Statement of Work.
NOTE: This is a Not-To-Exceed (NTE) CLIN in the amount of $36,600.00.
FOB: Destination
NET AMT $36,600.00
CIN: 130114835800022
$36,600.00
0023 1 Lot NSP Technical Data
FFP
Technical Data in accordance with Contract Data Requirements List (CDRL):
CDRL A001 - Activity Summary Report
NOTE: CDRL Not Separately Priced (NSP) FOB: Destination
NET AMT
Section C - Descriptions and Specifications
Statement of Work (SOW) for Preventative Maintenance Program for Facility’s Air Compressors & Dryers at the Naval Foundry and Propeller Center
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence
(c) Contractor personnel under this contract shall not engage in any of the inherently governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
(d) Employee Relationship:
1) The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
2) Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
(e) Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship.
Accordingly, entitlements and benefits applicable to such relationships do not apply.
(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor should notify the Contracting Officer in writing within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the estimate in time by which the Government must respond to this notice to minimize cost, delay, or disruption of performance.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
The Naval Foundry and Propeller Center (NFPC) utilizes a multitude of high speed machines which require air compressors and air dryers to operate. These air compressors and air dryers require periodic preventative maintenance according to a pre-determined cycle throughout the year. NFPC intends to procure a preventative and corrective maintenance program to ensure the air compressors and air dryers maintain full functionality and identify potential issues with the equipment.
1.2 SCOPE OF WORK
The contractor shall preform preventative maintenance on the air compressor and dryer equipment at the Naval Foundry and Propeller Center. Please see below table for CLIN structure and list of equipment intended to be covered on contract (nameplates are included as Exhibits B & C). The contractor is responsible for tasks listed in Section 3.0.
CLIN# Model # Equipment Description
Manufacturer/HP Visit
Quarterly or Bi-Annually
Location
0001 IRN60H-CC Compressor IR/60HP Quarterly 1029 C19
0002 NVC400A400 Dryer IR Quarterly 1029 C24
0003 R110i-A125 Compressor IR/150HP Quarterly 1029 C3
0004 NVC600A4H0 Dryer IR Quarterly 1029 C3
0005 SF22+ Compressor Atlas Copco/30HP Bi-Annually 1029 D4
0006 DA212ECA100 Dryer IR Bi-Annually 1029 D4
0007 SSR-EP60 Compressor IR/60HP Quarterly 1029 North Shanty
0008 BSD50 Compressor Kaeser/50HP Quarterly 20 A1
0009 KADPS-260 Dryer Kaeser/Air Dryer Quarterly 20 A1
0010 NVC400A40N Dryer IR Dryer Quarterly 20 B1
0011 IR45IE-A-125 Compressor IR/60HP Quarterly 20 East Outside
0012 IR45IE-A-125 Compressor IR/60HP Quarterly 20 East Outside
0013 SX 7.5 Compressor Kaeser/7.5HP Bi-Annually 546
0014 60UDVAW Compressor Sullivan/Palletek 60HP Quarterly 546 B4
0015 SPRF-470A-436 Dryer Sullivan/Palletek Dryer Quarterly 546 B4
0016 TMS0380 Dryer IR/Air Dryer Quarterly 546 B4
0017 60UDMBW Compressor Sullivan/Palletek 60HP Quarterly 546 B5
0018 SSR-EP20SE Compressor IR/20HP Quarterly 592
0019 TMS0200 Dryer IR/Air Dryer Quarterly 592
0020 SSR-EP20SE Compressor IR/20HP Quarterly 592
0021 GA15FF Compressor/w Dryer Atlas Copco/20HP Quarterly B123
0022 Additional Repairs – 1 Lot – Not-To-Exceed (NTE) $36,600.00
1.3 DESCRIPTION OF SERVICES:
As stated above, NFPC requires outside contractor support for preventative maintenance of (21) of our air compressors and air dryers of various makes and models listed in the above table. The period of performance is one (1) year. The preventative maintenance program shall consist of the below services:
a) Change air intake & oil filter.
b) Check air compressor oil level, change oil if necessary
c) Change separator element
d) Change coolant plus fluid analyst recommendations
e) Check starter contacts & clean every visit and quote replacement if requirement
f) Check cooler condition and blow out as needed
g) Check capillary tubing
h) Check and clean condensate drains as needed
i) Check conditions of belts, adjust tension and/or replace as needed
j) Lubricate main drive motor and cooling fan motor as needed
k) Complete a multi-point inspection & document control panel parameter per visit
l) Review warning shutdown history for any abnormal shutdowns per visit
m) Take oil sample and record Shock Pulse Monitoring (SPM) readings per visit
n) All parts & lubricants shall be disposed of in accordance with all local, state, and federal
OSHA/EPA regulations
o) Perform a multi-point inspection
p) Drain water from separators
q) Clean or replace air dryer separators (oil & water)
r) Inspect desiccant dryer each visit
s) Check and clean condenser and fan assembly on refrigerated air dryers
2.0 APPLICABLE DOCUMENTS
Not applicable.
3.0 REQUIREMENTS
3.1. The contractor shall meet all specifications described in the Description of Services above.
3.2. The contractor shall perform preventative maintenance on all models and brands listed. Services shall be in accordance with the noted item description, product numbers and quantities listed in the respective CLIN Structure in Section 1.2.
3.3 After completion of service to each air compressor/dryer, the contractor shall complete and submit an Activity Summary Report (CDRL A001).
3.4 In case of emergency or if corrective maintenance is required to complete PM, the contractor shall utilize NTE CLIN 0022 – Additional Repairs.
3.3.1 This requirement shall be awarded as an unpriced purchase order pursuant to FAR 13.302-2 Unpriced Purchase Order. CLIN 0001 - CLIN 0021 are firm fixed price line items to cover the scheduled preventative maintenance of the air compressor and dryer equipment listed in Section 1.2. In the event there are required emergency corrective maintenance repairs requirements, the contractor shall continue with the repairs under CLIN 0022 without costs exceeding the NTE amount. Once all required repairs are completed, the contractor shall provide the Government with a detailed itemized invoice that captures all of the labor, direct material, and indirect costs associated with the repairs. The Government shall analyze the invoice and come to an agreement of price with the contractor.
4.0 DATA REQUIREMENTS
4.1. Activity Summary Report (CDRL A001)
4.1.1. The contractor shall provide a detailed service report following the Preventative and Scheduled Maintenance visits for each air compressor/dryer. The report shall fully detail any deficiencies found during inspections and recommendations of remediation. The contractor shall prepare and deliver the report in accordance with the instructions of the CDRL. After completion of the visit, the contractor shall deliver the report within fourteen (14) days.
5.0 SECURITY REQUIREMENTS
5.1 The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.
5.2 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid security clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.
The requesting NFPC code/shop will coordinate the visit and security code 1123 will verify two forms of Government issued identification. The responsible code shall provide escort during the contractor’s visit.
Acceptable documents include:
US Birth Certificate (original) US Voters registration US Passport (Home Land security), Transportation Workers Identification Credential (TWIC) Naturalization paperwork Driver’s License Social Security Card
Installation Access for Visitors/Contractors
All visitors/contractors having a valid purpose for access shall submit a completed and signed Form 5512/1 to their identified Government sponsor 14 working days prior to the date of their required visit.
The entire document shall be completed and form dated/signed by the visitor/contractor.
Visitor/Contractor shall retain a copy of the form 5512/1 to present on the first day at the installation.
The visitor/contractor shall communicate all on-site day to day schedules and schedule changes to the NFPC base sponsor to be submitted to code 1123 in a detailed security plan.
Note: It is critical that start/end dates/work hours are identified, accurate, and short term visitors/contractors are not granted extended or after-hours access if not required Reporting to PNY-A for the first time.
Visitor/Contractor Responsibility
Visitor/Contractor shall report to the location designated by their sponsor (Security Office or other designated location, Pass and ID office) or if operating a Commercial Vehicle requiring inspection; to the Vehicle Inspection Station.
Visitor/Contractor shall present their completed and signed 5512/1.
The Sentry or Security Assistant shall verify vetting is cleared and issue the appropriate passes. If visitor/contractor has not completed the 5512/1 their access will be delayed until they correct the form.
Code 1123 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.
5.3 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected at Lot 753 prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound.
Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual.
Parking of POV's is available at Lot 753, which is approximately one mile from the work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor’s expense. Delivery drivers must present two forms of Government issued identification.
5.4 PEDs (Portable Electronic Devices) are not allowed in areas where work is being performed.
Should the Contractor require a laptop, tablet or other similar device on-site to fulfill the Scope of Work, the Contractor must complete an asset authorization form for each device and submit the devices to code 109 for inspection and approval prior to site access. The laptops cannot have camera capabilities. Procedures regarding laptop access are subject to change.
PEDs (Portable Electronic Devices) are PROHIBITED:
In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.
PEDs are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street.)
Cell Phones/Smart Watches/Fitness Bands/ Wireless Headsets and Speakers are permitted in outside areas of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted. Cell Phones, Smart Watches, Fitness Bands or Wireless Headsets and Speakers are prohibited in the OSC Areas.
PEDs are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.
Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.
********CAA-Controlled Access Area is anywhere within the fence line********
5.5. The contractor shall adhere to the facility/base access guidance per the following website:
https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html
5.6. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:
Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").
Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.
On the Sex Offender Registry.
Is barred from any Navy installation.
If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.
5.7 OPERATIONS SECURITY (OPSEC)
The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure.
NFPC’s Critical Information List, (CIL) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NFPC approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NFPC Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NFPC CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) ) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency.
CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer.
Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
NFPC’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NFPC Public Release Authority for review.
Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NFPC Security Division (Code 1123). Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NFPC Security Division (Code 1123).
5.8 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION
(CUI)
All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.
6.0 PLACE OF PERFORMANCE
6.1.1 Contractor shall perform at the following location:
Naval Foundry & Propeller Center 1701 Kitty Hawk Ave. Gate #3 BLDG 20 (Foundry) WEST END Philadelphia, PA 19112
6.1.2 The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Code 1120 Security Personnel no later than three business days after the date of award. The work space provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.
6.1.3 Access to Government buildings at NFPC is from 0730 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0730 to 1800, Monday through Friday. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this contract. Contractor personnel are not allowed to access any Government buildings at NFPC outside the hours of 0730 to 1800 without the express approval of the Procuring Contracting Officer (PCO).
6.1.4 Early Dismissal and Closure of Government Facilities
When a Government facility is closed and/or early dismissal of Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall not direct charge to the contract for time off, but shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy. Those Contractors who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, and closings in accordance with the FAR, applicable cost accounting standards, and company policy. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The PCO will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.
7.0 TRAVEL
Not applicable.
8.0 GOVERNMENT FURNISHED PROPERTY
Not applicable.
9.0 GOVERNMENT FURNISHED INFORMATION
Not applicable.
10.0 PURCHASES
Not applicable.
11.0 COUNTERFEIT MATERIAL PREVENTION
11.2 Non-Electronic Materials
11.2.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
11.2.1.1 If the materiel is currently in production or currently available, materiel shall be obtained only from authorized suppliers
11.2.1.2 If the materiel is not in production or currently available from authorized suppliers, materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria
11.2.1.3 Contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier;
11.2.1.4 Contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier
11.2.1.5 Contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.
12.0 PERSONNEL
Not applicable.
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (ECRAFT) SYSTEM
Not applicable.
14.0 SPECIAL REQUIREMENTS
Not applicable.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated 15 February 2024 in response to Solicitation No.
N6449824Q4008.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018)
(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee’s name, work site, and contract number.
(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.
(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office, via the COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a contractor’s injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.
(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.
(e) The Safety Office points of contacts are as follows:
Matt Luketina
(215) 897-1881 (O)
(757) 284-8809 (C)
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit 1, attached hereto.
(End of Text)
C-246-H001 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (OCT 2018)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.
Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) sponsor: Steve Eckart (Name of Individual Sponsor) Naval Foundry and Propeller Center (Name of Requiring Activity) Philadelphia, PA (City and State)
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)
All item(s) The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
E-246-H014 INSPECTION AND ACCEPTANCE OF ENGINEERING SERVICES (NAVSEA) (OCT 2018)
All item(s) - Inspection and acceptance shall be made by the Contracting Officer’s Representative (COR) or a designated representative of the Government.
E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)
(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.
(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(d) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.
Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________
Section F - Deliveries or Performance
VISITS SCHEDULE AND LOCATION
CLIN# Model # Equipment Description
Manufacturer/HP Visit
Quarterly or Bi-Annually
Location
0001 IRN60H-CC Compressor IR/60HP Quarterly 1029 C19
0002 NVC400A400 Dryer IR Quarterly 1029 C24
0003 R110i-A125 Compressor IR/150HP Quarterly 1029 C3
0004 NVC600A4H0 Dryer IR Quarterly 1029 C3
0005 SF22+ Compressor Atlas Copco/30HP Bi-Annually 1029 D4
0006 DA212ECA100 Dryer IR Bi-Annually 1029 D4
0007 SSR-EP60 Compressor IR/60HP Quarterly 1029 North Shanty
0008 BSD50 Compressor Kaeser/50HP Quarterly 20 A1
0009 KADPS-260 Dryer Kaeser/Air Dryer Quarterly 20 A1
0010 NVC400A40N Dryer IR Dryer Quarterly 20 B1
0011 IR45IE-A-125 Compressor IR/60HP Quarterly 20 East Outside
001…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .