Exhibit A.pdf
PDF 2 MB Posted
- Attached to
- Panel Meter Calibrators Federal contract opportunity
- Solicitation number
- N6426724R0347
About this file
This document package includes a data item description, software change request forms, and commercial off-the-shelf manuals data item description related to a federal solicitation for panel meter calibrators.
The solicitation seeks panel meter calibrators and related calibration services from contractors. The Navy's Naval Sea Systems Command issued the solicitation, numbered N6426724R0347, with an anticipated award date of January 2024. Responses are due within 60 days. The included data item descriptions outline requirements for documentation of calibration certificates, software change requests, and commercial operation and maintenance manuals for COTS equipment. Contractors must follow the specified formats and include required content such as equipment identification, test procedures, calibration results, and configuration management details. The software change request forms provide templates for contractors to submit updates to software or firmware on calibrated equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6426724R0347_solicitation.pdf | ||
| Attachment 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CALIBRATION CERTIFICATE/REPORT
Number: DI-QCIC-80798C Approved Date: 20170123 AMSC Number: F9766 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 36 Project Number: QCIC-2017-003 Applicable Forms: N/A Use/Relationship: The Calibration Certificate/Report documents calibration certificates or reports accompanying the calibrations performed on Department of Defense (DoD) test, measurement, and diagnostic equipment.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID is applicable to contracts requiring calibration of test equipment prior to delivery.
This DID is consistent with ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories, requirements for calibration reports or certificates.
(Copies of this document are available online at http://www.iso.org.)
c. This DID supersedes DI-QCIC-80798B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The calibration certificate or report shall include:
a. Title (e.g., calibration certificate or calibration report);
b. The name and address of the laboratory and the location where the calibrations were carried out, if different from the address of the laboratory;
c. Unique identification of the calibration certificate or test report (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the calibration certificate or test report;
d. The name and address of the client or customer;
e. Identification of the method used;
f. A description of, the condition of, and the unambiguous identification of the item(s) tested or calibrated;
g. The date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Source: http://assist.dla.mil -- Downloaded: 2023-04-05T14:45Z Check the source to verify that this is the current version before use.
DI-QCIC-80798C
h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
i. The test or calibration results with, where appropriate, the units of measurement;
j. The name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the calibration certificate or test report;
k. Where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
l. The conditions (e.g., environmental) under which the calibrations were made that have an influence on the measurement results;
m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. Evidence that the measurements are traceable.
End of DI-QCIC-80798C.
Source: http://assist.dla.mil -- Downloaded: 2023-04-05T14:45Z
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. I B. EXHIBIT
A IC. CATEGORY:
IPSC
TDP __ TM __ OTHER
D. SYSTEM/ITEM I E. CONTRACT/PR NO.
I
F.CONTRACTOR
PANEL METER CALIBRATOR TBD TBD
16. REMARKS ICominuedJ
DD FORM 1423-1, FEB 2001 Page of
2_Pages
Source: http://assist.dla.mil -- Downloaded: 2023-04-05T14:47Z
Data Item Description
Title: Software/Firmware Change Request Approval Date: 20100420 Number: DI-MISC-81807 Limitation: N/A AMSC Number: N9130 GIDEP Applicable: N/A DTIC Applicable: N/A Office of Primary Responsibility: SH/PMS-408 Applicable Forms: N/A
Use/relationship: The Software/ Firmware Change Request will be used to alert or inform the government about changes to software and firmware and also to provide detailed information to the government about the changes and the estimated cost of the software/firmware changes.
This DID contains the format, content and preparation instructions for the data product generated by the specific and discrete work task requirement as delineated in the contract.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions shall be as specified in the contract.
2. Format. The Software/Firmware Change Request shall be presented in the Contractor’s format.
3. Content. The Software/Firmware Change Request shall contain all the information identified in Figures 1-7.
4. End of DI-MISC-81807.
Page 1 of 8 Pages
Source: http://assist.dla.mil -- Downloaded: 2023-04-05T14:51Z
DI-MISC-81807
SOFTWARE CHANGE REQUEST (SCR), PAGE 1
2. DATE
3. JUSTIFICATION CODE
1. ORIGINATOR NAME AND ADDRESS (include e-mail address and telephone number)
Name:
Organization:
Street 1:
Street 2:
City, State, Zip Code:
Telephone Number: ( ) ext:: E-mail address:
4. TYPE OF SCR
Class I Class II
5. PRIORITY
Emergency Urgent Routine
6. SCR DESIGNATION 7. BASELINE AFFECTED
a. CI/CSCI AFFECTED
b. CAGE CODE
c. SYSTEM DESIGNATION
FUNCTIONAL ALLOCATED PRODUCT
d. SCR No.
e. REVISION
f. TYPE Preliminary Final
8. OTHER SYS/CONFIG ITEMS AFFECTED
YES NO
9. IN PRODUCTIO N
YES NO
10. DOCUMENTS AFFECTED
CAGE CODE SPEC/DOC NO. REVISION SCN/NOR/ECN/ECO NO.
11. TITLE OF CHANGE
12. CONTRACT NO. & LINE ITEM
13. CONFIGURATION ITEM NOMENCLATURE
14. PROCURING CONTRACTING OFFICER
15. LOWEST ASSEMBLY AFFECTED
a. NOMENCLATURE
b. PART NO.
16. DESCRIPTION OF CHANGE
17. NEED FOR CHANGE
18. PRODUCTION EFFECTIVITY BY SERIAL NUMBER
19. EFFECT ON PRODUCTION DELIVERY
SCHEDULE
20. RETROFIT
a. RECOMMENDED ITEM EFFECTIVITY
b. ESTIMATED KIT DELIVERY SCHEDULE
c. PLATFORMS AFFECTED
21. ESTIMATED COST or (SAVINGS) UNDER CONTRACT
No Additional Cost/Savings – In Scope of the Contract
22. SUBMITTING ACTIVITY AUTHORIZING SIGNATURE
22a. TITLE
23. APPROVAL/DISAPPROVAL
a. LCCB CHAIRMAN
DATE :
RECOMMEND APPROVAL
RECOMMNED DISAPPROVAL
b. CCB CHAIRMAN
DATE :
APPROVED
DISAPPROVED
Figure 1 Page 2 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 2
SCR NUMBER & REV:
EFFECT ON FUNCTIONAL/ALLOCATED CONFIGURATION IDENTIFICATION
24. OTHER SYSTEMS AFFECTED
25. OTHER CONTRACTORS/ACTIVITIES AFFECTED
26. CONFIGURATION ITEMS AFFECTED
27. EFFECTS ON PERFORMANCE ALLOCATIONS AND INTERFACES IN SYSTEM SPECIFICATION
28. EFFECTS ON EMPLOYMENT, INTEGRATED LOGISTICS SUPPORT, TRAINING, OPERATIONAL, EFFECTIVENESS, OR SOFTWARE
29. EFFECTS ON CONFIGURATION ITEM SPECIFICATIONS
30. DEVELOPMENTAL REQUIREMENTS AND STATUS
31. TRADE-OFFS AND ALTERNATIVE SOLUTIONS
32. DATE BY WHICH CONTRACTUAL AUTHORITY IS NEEDED
Figure 2 Page 3 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 3
SCR NUMBER & REV:
EFFECTS ON PRODUCT CONFIGURATION IDENTIFICATION, LOGISTICS, AND OPERATIONS
(X) FACTOR ENCL. PAR. (X) FACTOR ENCL. PAR.
33. EFFECT ON PRODUCT CONFIGURATION
IDENTIFICATION OR CONTRACT
35. EFFECT ON OPERATIONAL
EMPLOYMENT
a. PERFORMANCE a. SAFETY
b. WEIGHT-BALANCE STABILITY (Aircraft) N/A N/A b. SURVIVABILITY
c. WEIGHT-MOMENT (Other equipment) N/A N/A c. RELIABILITY
d. CDRL, TECHNICAL DATA d. MAINTAINABILITY
e. NOMENCLATURE e. SERVICE LIFE
f. OPERATING PROCEDURES
g. ELECTROMAGNETIC INTERFERENCE 34. EFFECT ON INTEGRATED LOGISTICS
SUPPORT (ILS) ELEMENTS
h. ACTIVATION SCHEDULE
a. ILS PLANS i. CRITICAL SINGLE POINT FAILURE ITEMS
b. MAINTENANCE CONCEPT, PLANS, PROCEDURES j. INTEROPERABILITY c LOGISTICS SUPPORT ANALYSIS
d. INTERIM SUPPORT PROGRAMS 36. OTHER CONSIDERATIONS
e. SPARES AND REPAIR PARTS N/A N/A a. INTERFACE
f. TECH MANUALS/PROGRAMMING TAPES b. OTHER AFFECTED EQUIPMENT/GFE/GFP N/A N/A
g. FACILITIES N/A N/A c. PHYSICAL CONSTRAINTS N/A N/A P h. SUPPORT EQUIPMENT N/A N/A d. COMPUTER PROGRAMS AND RESOURCES
i. OPERATOR TRAINING e. REWORK OF OTHER EQUIPMENT N/A N/A
j. OPERATING TRAINING EQUIPMENT f. SYSTEM TEST PROCEDURES
k. MAINTENANCE TRAINING g. WARRANTY/GUARANTEE
l. MAINTENANCE TRAINING EQUIPMENT h. PARTS CONTROL N/A N/A
m. CONTRACT MAINTENANCE i. ENVIRONMENTAL
n. PACKAGING , HANDLING, STORAGE, AND
TRANSPORTABILITY
N/A N/A j. FMS RELEASE
37. ALTERNATE SOLUTIONS
38. DEVELOPMENTAL STATUS
39. RECOMMENDATIONS FOR RETROFIT
40. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
a. ORGANIZATION
b. INTERMEDIATE
c. DEPOT
d. OTHER
41. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT
42. THIS CHANGE MUST BE ACCOMPLISHED
BEFORE WITH AFTER THE FOLLOWING CHANGES:
43. IS CONTRACTOR FIELD
SERVICE ENGINEERING
REQUIRED?
YES NO
44. OUT-OF-SERVICE TIME
45. EFFECT OF THIS SCR AND PREVIOUSLY APPROVED SCRs
46. DATE CONTRACTUAL AUTHORITY NEEDED
FOR PRODUCTION:
FOR RETROFIT:
Figure 3 Page 4 of 8 Pages
Figure 4 Page 5 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 5 SCR NUMBER and REV:
48. ESTIMATED COSTS SAVINGS/SUMMARY, RELATED SCRs (Use parentheses for savings)
FACTOR
CAGE CODE
(a)
SCR NUMBER
(b)
COSTS/SAVINGS
UNDER CONTRACT
(c)
OTHER COSTS/
SAVINGS
(d)
a. PRODUCTION COST/SAVING (Subtotal of Costs/Savings Elements from block 51a applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)
SUBTOTAL PRODUCTION COSTS/SAVINGS
b. RETROFIT COSTS (Applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)
SUBTOTAL RETROFIT COSTS
c. INTEGRATED LOGISTICS SUPPORT COSTS/SAVING REVISED
REQUIREMENTS
(1) ITEM RETROFIT (If not covered under “b”) (Applicable to aircraft, ship tank, vehicle, missile, or its subsystem)
(2) ILS SUBTOTAL (Applicable to aircraft, ship, tank, vehicle, missile or its subsystem)
(3) OPERATOR TRAINER (Net total cost/saving from each SCR covering operator trainer)
(4) MAINTENANCE TRAINER (Net total cost/saving from each SCR covering maintenance trainer)
(5) OTHER TRAINING EQUIPMENT
(6) SUPPORT EQUIPMENT (Net total cost/saving from each SCR on support equipment)
(7) ILS PLANS
(8) MAINTENANCE CONCEPT, PLANS, SYSTEM DOCUMENTS
(9) INTERIM SUPPORT PLAN
RECURRING COSTS
NEW REQUIREMENTS
PROCURIN
G
ACTIVITY
CODE
NON-
RECURRING
COSTS UNIT QTY TOTAL
(10) PROVISIONING DOCUMENTATION
(11) OPER TRNR/TRNG DEVICES/EQUIP
(12) MANUALS/PROGRAMMING TAPES, SPARES,
REPAIR PARTS (For 11)
(13) MAINTENANCE TRNR/TRNG DEVICES/
EQUIPMENT
(14) MANUALS/PROGRAMMING TAPES, SPARES,
REPAIR PARTS (For 13)
(15) SUPPORT EQUIPMENT
(16) MANUALS/PROGRAMMING TAPES (For 15)
(17) PROVISIONING DOCUMENTATION (For 15)
(18) REPAIR PARTS (For 15) N/A N/A N/A N/A N/A N/A N/A
(19) SUBTOTAL ILS COSTS/SAVINGS (Sum of c. 1 through c. 18)
CAGE CODE SCR NUMBER
d. OTHER COSTS/SAVINGS (Total from block 48d of related SCRs)
TOTAL OTHER COSTS/SAVINGS
SUBTOTALS OF COLUMNS
SUBTOTAL UNDER CONTRACT
Figure 5 Pages 6 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 6
SCR NUMBER and REV:
49. TITLE OF CHANGE
50. DATE AUTHORIZATION TO PROCEED
RECEIVED BY CONTRACTOR (YYMMDD)
S START DELIVERY C COMPLETED DELIVERY PROGRESS POINT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Figure 6 Page 7 of 8 Pages a.
C O
(1) Software Engineering
N F I
(2) Software Documentation
G U R
(3) Software Engineering Test
A T
(4) Update TDP b.
S
(1) Software Engineering Environment Upgrade
P
(2) Software Test Environment Upgrade
E Q
M c.
(1) Operator
A
(2) Maintenance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2
26 27 28 29 30 31 32 33 34 35 36
SOFTWARE CHANGE REQUEST (SCR), Continuation Sheet, Figure 7
TITLE OF CHANGE
SCR NUMBER and REV:
PARAGRAPH# BLOCK/LINE NO. BLOCK TITLE AND SUPPLEMENTARY INFORMATION
Figure 7 Page 8 of 8 Pages
Title: PROPOSED SPARE PARTS LIST
Number: DI-PSSS-80134B Approval Date: 20171107 AMSC Number: F9866 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFLCMC/WIN) Project Number: PSSS-2017-030 Applicable Forms: N/A
Use/Relationship: The Proposed Spare Parts List identifies the contractor’s recommended spare parts required to maintain a system under a given set of circumstances and duration and will be used to determine spare parts stocking levels.
a. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.
b. This DID supersedes DI-ILSS-80134A.
Requirements:
1. Reference documents. None.
2. Format. Contractor’s format shall be acceptable.
3. Content. The Proposed Spare Parts List shall contain the contractor’s recommended quantities of every type of spare part required for the system, to include all consumable and expendable items. This list shall explain any assumptions, formulas, or models used by the contractor in the creation of the list and shall include the following:
a. Complete item name.
b. Prime manufacturer’s or vendor’s part number.
c. Commercial and Government Entity (CAGE) Code
d. National Stock Number (NSN).
e. Quantity per end item.
f. Unit of issue (e.g., each, feet, lot).
g. Estimated unit price.
h. Recommended quantity to sustain operation for the time period and under the conditions stated in the contract.
i. Alpha numeric numbering of items on list.
j. Shelf life (if not indefinite).
k. Mean-Time-Between Failure (MTBF) of each item.
l. Production lead time for each item
m. Explanatory narrative which describes the recommended quantity to take into account multiple end items at a single location.
4. End of DI-PSSS-80134B.
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Source: http://assist.dla.mil -- Downloaded: 2023-04-05T14:50Z
Title: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED
SUPPLEMENTAL DATA
Approval Date: 20211203 Limitation: No GIDEP Applicable: No
Number: DI-TMSS-80527D AMSC Number: 10283 DTIC Applicable: No Office of Primary Responsibility: TM
Applicable Forms: None
Use/relationship: Commercial Off-the-Shelf Manuals may be used as-is or with supplementation to support COTS equipment used by DOD. This DID is used to:
a. Acquire sample COTS manuals for evaluation.
b. Acquire COTS manuals that have been evaluated and found to be acceptable.
c. Acquire associated supplemental data, if required.
This DID contains format, content, and intended use information for the data deliverable(s) resulting from the work described in MIL-PRF-32216.
This DID supersedes DI-TMSS-80527C, dated 12 Aug 2011.
Requirements:
1. Content. The manual shall contain all technical information on the assembly, installation, operation, parts, and maintenance of commercial equipment.
2. Evaluation. The manual shall be evaluated using the criteria found in MIL-PRF-32216.
3. Supplementation. The manual may be supplemented with additional data to comply with contract.
Supplemental data shall be prepared in accordance with MIL-PRF-32216.
4. Format. The basic manual shall be presented in the contractor's format. Supplemental data shall be presented in the format specified by the acquiring activity.
5. Digital files. Interactive Electronic Technical Manuals (IETMs) or PDFs are preferred for electronic COTS manuals.
6. PDF Files. PDF files shall be searchable, capable of having links added, and have fonts embedded.
7. IETMs. IETMs shall meet the general style and format and user interface requirements in MIL- STD-40051-1 (Army only) or MIL-STD-3031 (Army only).
8. Paper manuals. If paper manuals are acquired, the data shall be clearly legible and on paper of sufficient quality for long term use.
9. Quick Reference Guides (QRGs). QRGs shall meet the requirements of MIL-PRF-32614.
End of DI-TMSS-80527D
Source: http://assist.dla.mil -- Downloaded: 2023-04-05T14:52Z
| A001 signed2_Redacted |
| DID A001 |
| A002 signed2_Redacted |
| DID A002 |
| A003 signed2_Redacted |
| DID A003 |
| 23. APPROVAL/DISAPPROVAL |
| Figure 1 Page 2 of 8 Pages |
| SOFTWARE CHANGE REQUEST (SCR), Figure 2 |
| SCR NUMBER & REV: |
| SOFTWARE CHANGE REQUEST (SCR), Figure 3 |
| SCR NUMBER & REV: |
| SCR NUMBER and REV: |
| SOFTWARE CHANGE REQUEST (SCR), Figure 6 |
| SCR NUMBER and REV: |
| SCR NUMBER and REV: |
| A004 signed2_Redacted |
| DID A004 |
| T001 signed2_Redacted |
| DID T001 |
File details come from the government source that posted it. Updated .