SSJ_Redacted.pdf

PDF 402 KB Posted

Attached to
ICD-705 Planning, Design, and Construction Training Federal contract opportunity
Solicitation number
N6426723P0261
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a justification for a sole source or limited sources procurement. The Naval Surface Warfare Center, Corona Division seeks to procure a single lot of unspecified supplies or services to be compatible in all aspects with existing installed systems. The justification cites regulatory exceptions permitting other than full and open competition, including when only one source can meet requirements due to proprietary data or when items are direct replacements for existing equipment. The related opportunity is for planning, design, and construction training services under Navy solicitation number N6426723P0261 as a limited or sole source procurement.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL SURFACE WARFARE CENTER, CORONA DIVISION

CONTRACTS DEPARTMENT

BRAND NAME/SOLE SOURCE JUSTIFICATION (FBO) SAT

LIMITED-SOURCES JUSTIFICATION (GSA) SAT

JUSTIFICATION FOR AN EXCEPTION TO FAIR OPPORTUNITY

(ID/IQ TAKS ORDER/DELIVERY ORDER) SAT

1. Description of Supplies/Services.

Part # DESCRITION QTY N/A 1 Lot

The requested supplies services represent the minimum requirements of the government, which have been verified by the certifying technical and requirements personnel.

2. Regulatory Authority Permitting Other Than Full and Open Competition.

FBO

FAR 13.106-1(b)(i) Soliciting from a single source

FAR 13.106-1(b)(ii) Particular brand-name item

GSA

FAR 8.405-6(a)(i)(1)(A) An urgent and compelling need exists

FAR 8.405-6(a)(i)(1)(B) Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized

FAR 8.405-6(a)(i)(1)(C) In the interest of economy and efficiency, the new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures (the original order or BPA must not have been previously issued under sole-source or limited-sources procedures).

FAR 8.405-6 (b) Items peculiar to one manufacturer (brand-name item) ID/IQ Task Order/Delivery Order (e.g. NASA SEWP or ARMY CHESS)

FAR 16.505(b)(2)(i)(A) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

FAR 16.505(b)(2)(i)(B) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized

FAR 16.505(b)(2)(i)(C) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order. [When utilizing this exception, the rationale shall describe why the relationship between the initial order and the follow-on is logical (e.g., in terms of scope, period of performance, or value).]

FAR 16.505(b)(2)(i)(D) It is necessary to place an order to satisfy a minimum guarantee.

3. Rationale Justifying Use of Cited Regulatory Authority.

a.) The Items Described in Paragraph 1 Must Be Compatible In All Aspects (Form, Fit And Function) With Existing Systems Presently Installed.

b.) A Patent, Copyright, or Proprietary Data Limits Competition.

c.) The Items Described in Paragraph 1 are “Direct Replacements” Parts/Components for Existing Equipment.

d.) Foreign Military Sales (FMS) Supported By A Case Letter.

e.) Unusual and Compelling Urgency.

f.) Other: If required, discuss any other rationale that supports the use of a brand name/sole source for this effort.

4. Implication of Procuring another Brand/Manufacturer.

a.) Unacceptable Delays in Fulfilling the Agency’s Requirements.

File details come from the government source that posted it. Updated .