N64267-15-R-0057_0002.pdf
PDF 134 KB Posted
- Attached to
- Telcommunications Infrastructure Material Federal contract opportunity
- Solicitation number
- N6426715R0057
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N64267-15-R-0057_0003.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| RS14_BPA_Parts_List_20150504.xlsx | XLSX spreadsheet | |
| RS14_BPA_Parts_List_20150428_.xlsx | XLSX spreadsheet | |
| N64267-15-R-0057_0001.pdf | ||
| RS14_BPA_List_20150421.xlsx | XLSX spreadsheet | |
| RS14_BPA_List_20150410.xlsx | XLSX spreadsheet | |
| C5_Solicitation_15R0057.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions, revise Attachment 1 RS14 Parts List and extend the closing date. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Apr-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N64267-15-R-0057
X 9B. DATED (SEE ITEM 11)
10-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Apr-2015
CODE
NAVAL SURFACE WARFARE CENTER CORONA DIV
1999 FOURTH STREET BLDG 523
NORCO CA 92860
N64267 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N64267-15-R-0057
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
QUESTIONS AND ANSWERS
1.1. Vendor Questions/Concerns:
A) Do you have any specifications for the required Monopoles
B) Do you have any specifications for the required precast foundations
C) Specifications for both the specified Old Castle building and the Thermobond building. Precast
Building specs for door size, any electrical, lights, wall board insulation (R-11?), HVAC's, grounding, cable ladder, and power needed for the building
D) We have contacted both companies. Here are the responses we have received:
i. Old Castle will not sell Sabre any buildings. Get Original Quote
ii. Thermobond doesn't know which building is being specified in the RFP. They say they don't recognize the provided part #. Get Original Quote
1.2. RS14 Response
A) Monopole Tower – monopoles shall comply with the requirements of ANSI/TIA-222-G (and all current addendums).
REQUIREMENTS:
Structure Height (in feet): 100
Structure Type: Self-supporting (no guy wires)
Classificaiton of Structure: Structural Class III
Exposure Category: Exposure Category C
Topographic Category: Topographic Category 1
Antenna Loading:
*Assumptions
All parabolic antennas shall be solid 4ft diameter without radome
*All dipole antennas shall have dimensions of 111” x 3” OD
*All (parabolic and dipole) antennas shall have LDF5-50 feedlines
*All feedlines shall be considered to be on the inside of the monopole
*Antenna and cable specifications are provided for informational purposes only to perform tower loading analysis
Material Finish: All monopole components shall be hot-dip galvanized
Hardware: All necessary hardware shall be provided with each tower. All hardware connections shall be galvanized
A325 (or better) bolts, nuts, and locking devices.
Tower
Height
Antenna
Type
Mounted
Height Qty
100’
Parabolic 50’ 2
Omni
60’ 3
70’ 3
80’ 3
90’ 3
100’ 3
Anchor Bolts: All monopoles shall include anchor bolts compatible with base plate and capable of supporting specified load requirements. Tower manufacturer will need to coordinate with precast concrete foundation manufacturer to ensure anchor bolts are compatible with foundation sizing.
Hardware Surplus: All monopoles shall include a 3% surplus of hardware
Bonding: Any bonds between dissimilar metals shall be thoroughly sealed against moisture to minimize corrosion.
Horizontal/Vertical Ratio: The horizontal distance between the vertical centerlines at any two elevations shall not exceed
0.25% of the vertical distance between the two elevations
Continuity: The monopole shall be electrically continuous over the entire structure through the use of either direct bonds and/or bonding jumpers.
Grounding: The base of each monopole shall permit an exothermic weld for a bond to the grounding electrode system without compromising the rating of the tower.
Lightning Protection: Each monopole shall be equipped with a lightning rod(s) in compliance with NFPA 780 (2011 edition)
Climbing Facility: All monopoles shall be equipped with a climbing facility and a safety climb device, continuous over the entire height of the monopole. The cable support system of the safety climb device shall have a stamped or engraved metal identification tag affixed at the base of the structure indicating the size and type of cable to ensure compatibility with a climber’s safety sleeve, Item Unique Identification: All monopole components shall be marked in accordance with MIL-STD-130N for item unique identification.
Cable Access Port/Strain Relief: All monopoles shall provide the capability of routing feedlines on the inside of the monopole
(without exceeding the bending radius limits for cabling) and provide a mechanism to provide strain relief on cabling and port sealing.
PE- stamped Drawings: For each purchased tower, drawings shall be certified wet stamped by a licensed P.E. in the state of the installation site. The following information shall be provided for all towers:
Overturning moment
Axial load
Uplift reactions
Shear reactions
B) Precast Concrete Foundation for tower, shelter, generators and fuel tanks are to satisfy a one site communications area distribution node.
TOWER PRECAST CONCRETE FOUNDATION REQUIREMENTS:
Tower type: 3-legged with 21′ face widths
Maximum Allowable Footprint: 35’ X 35’
Tower load capacity: M (kip-ft) 4000
Axial (kips) 40
Uplift (kips) 250
The pre-cast concrete blocks shall be manufactured off site and transported to the point of installation for assembly by the Government.
The solutions shall provide for a non-penetrating installation (e.g. sits atop graded earth surface) and shall be comprised of multiple blocks. The blocks shall be fastened together via post-tensioning cables or steel rods.
The concrete blocks shall have alignment keys in the vertical faces that resist movement between the blocks upon post-tensioning.
Each block will have integral conduits perpendicular to each vertical face to accommodate the post-tensioning rods.
Each block shall not exceed 15,000 lbs.
The concrete shall have a minimum compressive strength of 5,000 psi @ 28 days matching the strength used in the engineering calculations.
The top surface of each block shall be fully level with the top surface of each of the adjacent blocks, once the blocks are post-tensioned. A cumulative variance not to exceed ½” across the entire foundation in any direction will be acceptable. Variance from block to block shall not exceed ¼”.
The design of the post-tensioning cables or threaded rods shall bind together the requisite number of blocks in a manner that can resist the tower loads. The block and post-tensioning design shall ensure that there will be no movement between blocks once they are post-tensioned. The contractor shall provide post-tensioning values and calculations for each site.
Stacking of blocks is acceptable as long as the design is approved and wet stamped by a qualified
Professional Engineer (P.E.) in the state of the installation site.
The design shall allow for increase in load capacity by adding additional blocks without disrupting the integrity of the existing foundation.
The spacing of the post-tensioning cables or rods shall accommodate the placement of three (3) sets of cast anchor bolts (one for each tower leg) spaced 21’ apart. The bolt center for each leg shall be 18”. See paragraph “s” for alternate tower mounting possibilities.
The foundation drawings and calculations shall be prepared in accordance with the specific state of installation standards. All drawings shall be certified wet stamped by a licensed P.E. in the state of the installation site.
The design and engineering analysis of the precast block foundation shall be in accordance with the American Concrete Institute’s ACI 318-08: Building Code Requirements for Structural
Concrete (and Commentary).
All post-tensioning cables or rods must be coated in a manner that will preclude corrosion due to prolonged exposure to the elements.
The conduits in the blocks are not required to be filled, following post-tensioning.
The exposed hardware used with the blocks shall be hot dip galvanized (HDG).
Each block shall have a minimum of three (3) lifting points that shall not protrude beyond the outer surface of the block. The top surface shall allow for drilling to a depth of 5”, which will allow for equipment anchoring at additional locations.
The block configurations shall be designed to the listed reactions and provided soil reports. The blocks shall be designed to accommodate 3-legged towers with 21′ face widths. Additionally, the bolt pattern for each leg shall consist of six (6) 2″ diameter bolts equally spaced in a bolt circle of
18″ diameter, centered on the 21′ face corners. The orientation of the bolts shall be aligned such that all bolts on opposite sides of the bolt circle are parallel with the faces of the tower.
Alternate tower mounting interface solutions (e.g. mounting plates that can be drilled in the field for precise alignment with the tower bolt pattern) can be proposed. Upon government approval, proposed mounting interface solutions may be utilized in lieu of precast bolts.
SHELTER PRECAST CONCRETE FOUNDATION REQUIREMENTS:
The foundations shall be pre-cast concrete sections that are manufactured off site and transported to the point of installation for assembly.
The solutions shall provide for a non-penetrating installation solution (i.e. sits atop graded earth surface) and shall be comprised of 2 individual pre-cast concrete sections. The 2 sections shall be fastened together via post-tensioning steel rods.
The blocks shall support the loads of a 26’x18’-4” communication shelter.
The foundation drawings and calculations shall be prepared in accordance with the specific state of instillation standards. All drawings shall be certified wet stamped by a licensed P.E. in the state of the installation site.
GENERATOR PRECAST CONCRETE FOUNDATION REQUIREMENTS:
The foundation shall be a pre-cast concrete block(s) that is manufactured off site and transported to the point of installation.
The solutions shall provide for a non-penetrating installation solution (i.e. sits atop graded earth surface) and shall be comprised of one pre-cast concrete block.
The foundation shall be capable of supporting generator loads.
The foundation shall be 12’-6”x6’x12”
The foundation drawings and calculations shall be prepared in accordance with the specific state of instillation standards. All drawings shall be certified wet stamped by a licensed P.E. in the state of the installation site.
6 bollards per shall be provided 18” from the generator as needed for protection per National Fire
Protection Agency’s NFPA 30, “Flammable and Combustible Liquids Code”. Placement shall not interfere with operation and access to generator entry points.
FUEL TANK PRECAST CONCRETE FOUNDATION REQUIREMENTS:
The foundation shall be a pre-cast concrete block(s) that is manufactured off site and transported to the point of installation.
The solutions shall provide for a non-penetrating installation solution (i.e. sits atop graded earth surface) and shall be comprised of a pre-cast concrete block.
The foundation shall be capable of supporting fuel tank loads.
Type foundation shall be 16’x6’x12”
The foundation drawings and calculations shall be prepared in accordance with the specific state
(AZ or CA) of instillation standards. All drawings shall be certified wet stamped by a licensed
P.E. in the state of the installation site.
8 bollards per shall be provided 18” from the fuel tank as needed for protection per National Fire
Protection Agency’s NFPA 30, “Flammable and Combustible Liquids Code”.
The contractor shall provide three days of all necessary training at the first job site to (to be determined by the Government upon award) to properly assemble foundations, including requirements, maintenance schedule and any necessary training for periodic maintenance. Training will be given to both Government
Employees and Support Contractors.
The contractor shall provide two sets of all equipment necessary to post-tension the steel rods.
C) Old Castle building and Thermobond building Specifications
OLD CASTLE BUILDING REQUIREMENTS:
Size: 24’ X 27’ turnkey precast reinforced concrete shelter
Minimum Interior Dimension: 263” X 287” X 120”
Concrete Strength: Concrete shall achieve a 28-day cure minimum comprehensive strength of 4000 pounds per square inch or greater
Bullet Protection: The shelter outer walls, floor, ceiling and doors shall provide protection against bullets in accordance with level 4 of UL 752 Standard for
Bullet-Resisting Equipment.
Shelter Door: Main Doorway (Metal double door 96” X 84”)
Rear Doorway (Metal 48” X 84”)
Ceiling R-value: R-11 utilizing 1 ¾” thick insulation material
Wall/floor R-value: R-11 utilizing 1 ¾” thick insulation material
Power: 120/208 VAC, 60 Hz, three phase “Y”
Interior Receptacles: Minimum of 11 Ceiling/Overhead Receptacle
Outlets NEMA 5-20R (T slot)
Lighting: Ceiling mounted fixtures to provide a minimum 700
Lux
Ground bar: Grounding busbars ¼” X 4” X 20”
Cable Management: 12” X 1 ½” cable tray ceiling mounted
Misc: All required electrical wire, breakers, boxes, conduit, etc.
Shelter design shall be prepared in accordance with the specific state of instillation standards certified wet stamped by a licensed P.E. in the state of the installation site.
The shelter shall be outfitted with fire retardant material. All design, provisioning, material selection and installation practices shall be in compliance with UFC 3-600-01 Fire Protection
Engineering for Facilities, with Change 1.
THERMOBOND BUILDING REQUIREMENTS:
Size: 10’ O.D. x 14’ O.D. x 9’ I.D. shelter
Exterior Door: 3’x7’ exterior steel door with passage and deadbolt hardware
Ceiling R-value: 19 minimum
Wall/floor R-value: 11 minimum
Base: Painted “I” beam box assembly
Roofing: Rubber roofing material with galvanized roof edging
Flooring: Vinyl tile floor covering
Interior: 1/2” plywood with white FRP interior finishing
Power panel: 200 amp, single phase distribution with main breaker
Lighting: 2 lamp, 4 foot fluorescent light fixture with switch
Convenience receptacles: 20v duplex receptacles (Minimum of 3)
Exterior receptacle: 120v exterior GFI receptacle (Minimum of 1)
Entry panel: 16 port 4” entry panel
Ground bar: 4”x12”x1/4” master ground bar mounted below entry panel
Bonding: Halo ground ring installed in shelter per R56 standards
Cable Management: 14’ of 12” ceiling mounted cable ladder
HVAC: 1 ton cool/5kW heat air conditioner with lead/lag master thermostat
Misc: All required electrical wire, breakers, boxes, conduit, etc.
D) Precast Shelter Quotes
i. Old Castle Precast Shelter
ii. Thermo Bond Buildings (Manufacturer Part Number 1014CSS)
2. Notes
A) Required Monopole’s will be 100ft with requirements met by manufacturer Ehresmann Engineering
Inc.
B) Pre-cast concrete foundation is for a single site that consist of a tower, shelter, generator(s) and fuel tank(s)
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Apr-2015 02:00 PM to 05-May-2015 02:00 PM.
(End of Summary of Changes)