Q&A_1.docx
DOCX document 14 KB Posted
- Solicitation number
- N6279320R0010
About this file
This document contains a questions and answers file related to a federal solicitation for cabin furnishings aboard the USS George Washington. The solicitation seeks to procure furnishings to replace existing items in several compartments aboard the ship. Questions addressed include confirmation of a deviation allowing non-standard materials, lack of contractor vehicle access to the shipyard requiring coordinated deliveries, availability of an on-site office and secured storage space for the contractor, and lack of sample drawings from the end user. Interested offerors must submit any questions by January 6th, 2020 and bids must remain open for 120 days, with free delivery to the shipyard in Newport News, Virginia. The Navy seeks new equipment covered under manufacturer warranty for award of a firm-fixed price contract by January 15th, 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6279320R0010.docx | DOCX document | |
| N6279320R0010_Amendment.docx | DOCX document | |
| Supply Deck Matrix.xlsx | XLSX spreadsheet | |
| N6279320R0010.docx | DOCX document | |
| OPNAVINST 9640.1B Shipboard Habitability Program.pdf | ||
| NSWC SFC-2_Instructions.pdf | ||
| NSWC SFC-2_FurnReq.pdf | ||
| NSWC SFC-2_WhatMakesNavy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Q1: Paragraph 23.2 states "Cabinetry should be fabricated from aluminum extrusion, aluminum sheeting or stainless steel." Paragraph 23.6 states "All work performed must be in accordance with Shipboard Navy Standards. In multiple paragraphs throughout the statement of work, there are references for use of "fine wood". Is it the intent of the Government to issue a Deviation From Specification for use of non-Shipboard Navy Standard material for this Solicitation?
A: YES
Q2: There will be multiple pickups and deliveries needed during this contract. Will drive in passes to the Newport News Shipyard be provided to the Contractor?
A: No; S/F will coordinate material delivery utilizing organic methods.
Q3. Can HII-NNS or CVN 73 provide an On-site office for the Contractor?
A: YES
Q4: Will the contractor be given space on the main deck to set up a lockable caged area for material and tool staging?
A: YES
Q5: Does the end user have sample drawings of the desired design and look they are requesting?
A: NO
File details come from the government source that posted it. Updated .