STATEMENT OF WORK (SOW)
OVERHAUL TROUGH COVERS
A. RECEIVE AND STEAM CLEAN (108) CVN-73 TROUGH COVERS FROM
THE SUPERVISOR OF SHIPBUILDING NEWPORT NEWS.
B. REMOVE, SCRAP, AND REPLACE THE (6) BUSHINGS NAWC
PN-524404-1 ON THE (1EA) FORWARD R/H AND L/H TROUGH
COVERS AND THE (3) BUSHINGS ON THE (2) STATION ONE R/H AND
L/H TROUGH COVERS.PROVIDE AN ESTIMATE TO REPLACE AN
ADDITIONAL 300 BUSHINGS. REMOVE, SCRAP AND REPLACE THE
(108) BAR KEYS NAWC PN-427857-1, AND (108) BAR KEY SCREWS
NAWC PN-427856-1. PROVIDE AN ESTIMATE TO KEENSERT
(P/N MS51831A110) REPAIR ALL TROUGH COVER LIFTING EYE
BOLTHOLES.
C. WELD REPAIR THE SHUTTLE SPIN DAMAGE ON THE FORWARD (2)
MOST TROUGH COVERS NAWC PN-627133-2LH/RH. (MT)
REPAIRED AREAS. INSPECT DESI BAR WELDS AND REPAIR IF
NECESSARY. REMOVE THE LABEL PLATE (P/N 427418-1) FROM THE
DESI TROUGH COVER. INSPECT AND REPAIR THE 4 X .164-32UNC-2B
BOLTHOLES AS NECESSARY.
D. PRIOR TO BLAST, IDENTIFY EACH COVER FOR CATAPULT AND
STATION LOCATION (I.E. CATAPULT 4-32 R/H). BLAST AND COAT
(103) INTERMEDIATE TROUGH COVERS NAWC PN-627110-1,
(1) FORWARD TROUGH COVER NAWC PN-627133-2LH ,
(1) FORWARD TROUGH COVER NAWC PN-627133-2RH ,
(1) STATION ONE COVER NAWC P/N 627109-1 LH,
(1) STATION ONE COVER NAWC P/N 627109-2 RH AND
(1) WIRING CONDUIT MODIFIED COVER (LH) PN-627202-1.
COAT IAW NAWCADLKE-MISC-48J100-0045 REV. C.
E. IF THE FORWARD TROUGH COVERS HAVE A GROOVE THE FULL
LENGTH OF THE COVER, PROVIDE A WELD BEAD IAW NAWC
DRAWING 627133-2.
F. STENCIL CATAPULT AND TROUGH COVER LOCATION ON THE
OUTSIDE OF THE SHIPPING CONTAINER I.E.(CATAPULT 4- 32 R/H).
G. ENSURE THE NNS SCHEDULE A-4 REQUIRED DELIVERY DATES CAN
MET. THE NNS SCHEDULE A-4 MATERIAL REPORT WILL BE SENT
DIRECTLY TO THE CONTRACTOR ON A MONTHLY BASIS STARTING 1
YEAR PRIOR TO THE START OF THE RCOH PERIOD BY SUPSHIP.
H. SHIP BACK TO NNS FOR INSTALLATION IAW SCHEDULE A-4 DATES.
I. ENSURE THE TROUGH COVERS ARE OVERHAULED IAW
NAWCADLKE-MISC-48J100-0045 AND THE REQUIREMENTS OF
NAVAIR TDR 16-25010 FOR P/N 627110-1 AND NAVAIR TDR’S
16-25011 & 16-25012 FOR P/N'S 627109-1 AND 627109-2.
J. STATION ONE COVERS ARE CSI AND THEREFORE IRAC #8 SHALL
APPLY TO THEIR OVERHAUL/REPAIR. IRAC #8 STATES THAT "FOR
CSI PARTS WITHOUT A FLIGHT SAFE CRITICAL PROCESS FOR
OVERHAUL/REPAIR, A WRITTEN COPY OF THE PROCESS SHALL
BE SUBMITTED TO NAVAIR LAKEHURST CODE 4.8.2 FOR
REVIEW/APPROVAL.
K. THE OVERHAULING ACTIVITY SHALL SUBMIT VIA REI A WRITTEN
PROCESS DETAILING THE WORK TO BE COMPLETED ON P/N
627109-1/2. NAWCADLKE-MISC-48J100-0045 MAY BE USED AS A
REFERENCE FOR ANY REPAIRS WHICH MAY BE REQUIRED.
L. Other Pertinent Information or Special Considerations.
Any potential contractor will need to submit a Source Approval Request (SAR) to become a qualified source to work on trough covers. Any potential vendor should be advised that SAR package review and approval process for ALRE CSI parts typically takes between 90-120 days. The package is first sent to NAVSUP and then to NAVAIR Quality Assurance. Since Trough covers are CSI, any potential vendor will need to fulfill this requirement.