- Overhaul/Repair of Tugboat 45WB0801
- Solicitation number
- N62786-15-T-0001
About this file
Reason for amendment is to change the period of performance for completion date and extend the response time.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300483833
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reason for amendment is to change the period of performence for completion date and extend the responce time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-May-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62786-15-T-0001
X 9B. DATED (SEE ITEM 11)
15-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-May-2015
CODE
SUPSHIP BATH
574 WASHINGTON STREET
ATTN: ANDREW WEBBER, CODE 401C
BATH ME 04530
N62786 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N62786-15-T-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 15-May-2015 12:00 PM to 29-May-2015 12:00 PM.
The Acquisition Set Aside has changed from Small Business to Hubzone Small Business.
The following have been modified:
STATEMENT OF WORK
Statement of Work for Item 0001 – Tugboat 45WB0801 (45WB)
1. Scope: Supervisor of Shipbuilding, C&R, USN, Bath, Maine has a requirement to contract for towing/overhaul/upgrade of the Tugboat 45WB0801 (45WB) currently located at the Portsmouth Naval Shipyard (PNSY) in Portsmouth, NH.
2. Period of Performance: From: Receipt of the Tugboat To: _____(contractor propose period of performance) Days after receipt of the Tugboat
*Final delivery date no later than 30 October 2015.
3. Place of Performance: Overhaul/upgrade services required are to be performed at the Contractor’s facility, which is required to be within 150 mile radius from PNSY. Towing service is to be performed between PNSY and the Contractor’s facility
4. Location of Delivery: The Contractor is required to deliver the Tugboat to:
Portsmouth Naval Shipyard Ted Knowles Portsmouth Naval Shipyard Portsmouth, NH 03801
TEL: 207-438-1100
5. Services Required: The Contractor is required to perform the following tasks in accordance with the individual work items. Provide specific services as described in section 5.1 below, which meets or exceeds the requirements of this contract. Reference all work in accordance with FY 15 NAVSEA Standard items which can be found at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/nsi/15nsi/15.htm
5.1 Work Items:
077-11-001 Hazardous Waste Produced on Naval Vessels; control 110-11-001 Underwater Hull; inspect and repair 123-14-001 Fuel Oil Tank; inspect and repair.
123-11-002 Fuel Tank Vent Piping Modifications; accomplish 123-14-001 Potable Water Tank; inspect and preserve 130-11-001 Main Deck Plating; inspect 167-11-001 Flush Watertight Hatch; replace 243-11-001 Propeller Shafting; remove, inspect and install 245-11-001 45WB Propeller; repair 251-11-001 Main Engine Air Filter and Housing; replace 256-11-001 Main Engine Seawater Piping and Strainer; replace 521-11-001 Fire Pump Drive Belt; replace
561-11-001 Hydraulic Steering System Piping; modify 562-11-001 Port and Starboard Rudder; inspect and repair 611-11-001 Rubber Fender System; inspect and repair
N62786-15-T-0001
631-11-002 Interior Preservation; accomplish 631-31-001 Underwater Hull and Freeboard Preservation; accomplish 633-11-001 Hull Zinc Anode: replace 634-21-001 Exterior Non-Skid and Deck Preservation; accomplish 992-11-001 Towing Services (45WB); provide 992-11-002 Temporary Services; provide 992-31-001 Cleaning and Pumping; accomplish 997-11-001 Dry-docking and Undocking: accomplish
6. Requirements:
6.1. The Contractor will:
6.1.1. Assume custody of the Tugboat at PNSY and provide towing service to/from the point of acceptance to/from the Contractor’s facility.
6.1.2. Assume custody of Government Furnished Material (GFM) and provide for proper use, storage, and maintenance as required by FAR 52.245-1.
6.1.3. Be within 150 mile radius from PNSY.
6.2. The Government shall:
6.2.1. Provide detailed work packages for work as stated in section 5.1 of this Statement of Work.
6.2.2. Provide technical clarification. Please contact the following individuals at Supervisor of
Shipbuilding Bath for all questions of a technical nature: Jeffery Mason at Jeffery.mason@supshipba.navy.mil, Gregory Bird at Gregory.bird@supshipba.navy.mil, Julie Brillard-Haley at Julie.brillard@supshipba.navy.mil, and Andrew Webber at Andrew.Webber@supshipba.navy.mil. In addition, all bidders’ questions shall be submitted in writing to Jeffery Mason, Gregory Bird, Julie Brillard-Haley, and Andrew Webber.
6.2.3. Provide necessary drawings and tech manuals as required for the accomplishment of the work as stated in section 5.1 of this Statement of Work. All interested parties will be added to the Interested Parties List and will need to contact Jeffery Mason by phone 207-442-2471, Gregory Bird 207-442- 2330, Julie Brillard-Haley 207-442-2476, or Andrew Webber 207-442-4486 or via e-mail to have the work specifications and drawings FedEx’d to them.
7. Attachments:
7.1. Detailed work packages, drawings, specifications, and technical manuals as provided by the Government as identified above.
(End of Summary of Changes)