J_4_QnAs_BSK_VR.xlsx
XLSX spreadsheet 568 KB Posted
- Attached to
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
- Solicitation number
- N6264927RK003
About this file
This is a Questions and Answers (Q&A) document from a federal contract solicitation for the USNS CITY OF BISMARCK (T-EPF 9) Voyage Repair Availability. The Q&A compilation addresses clarifications submitted by multiple bidders, including Hanwha Ocean Co., Ltd., UNITHAI SHIPYARD AND ENGINEERING LTD., Seatrium Repair & Upgrades Pte. Ltd., and Mitsubishi Heavy Industries, Ltd., regarding the work specification MSCOJ 27-001 and associated work items. Key technical clarifications provided include confirmation that 17 Tank Level Indicators (TLIs) require OEM inspection and calibration; detailed specifications for waterjet system hydraulic hoses to be installed outside the vessel hull, including pressure ratings (350 BAR), materials (stainless steel 304/316 fittings), hose diameters ranging from 3/4 inch to 1 inch, lengths, and swivel JIC fitting configurations; and guidance that bidders proposing alternative calibration laboratories outside Korea for equipment unavailable domestically must submit those facilities for government review and approval. The document also indicates pending answers for specifications related to material items in Paragraph 7.4 of WI 0460, carpet color and thickness requirements, and lagging specifications, suggesting these clarifications may be addressed in subsequent amendments.
The Q&A reflects the government's requirement that all responses include appropriate technical documentation such as photos and serial numbers, and clarifies scope boundaries regarding Tank Level Indicator work to include routine signal output checks and calibration. All amendments referenced are marked as "0001," indicating these are responses to initial bidder inquiries submitted during the pre-award phase of this competitive Firm-Fixed-Price solicitation conducted by NAVSUP Fleet Logistics Center Yokosuka (FLCY) for performance in South Korea.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6264927RK0030001 SF 30.pdf | ||
| 0601_WJ Photos.docx | DOCX document | |
| Solicitation - N6264927RK003.pdf | ||
| J_1_Work_Spec_MSCOJ 27-001_N6264927RK003.pdf | ||
| J_2_Contractor_Price_Breakdown_N6264927RK003.xlsx | XLSX spreadsheet | |
| J_3_IRS_FORM_W_14_N6264927RK003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question No. | Contractor | WI No. | Para. No. | Question | Answer | Amendment | |
| 1 | Hanwha Ocean co., Ltd. | 0598 | For bidding purpose, please verify the quantity of TLIs required for inspection. Enclosure 2.2.1. list of Tanks was not provided. | ||||
| Based on reference 2.1.2. 17EA tanks are identified. For bidding purpose, is it acceptable to assume 17EA TLIs are required for OEM inspection and calibration? | Yes, we need all 17 tanks calibrated. | 0001 | |||||
| 2 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0561 | After checking with KOLAS (Korea Laboratory Accreditation Scheme) approved calibration subcon, it was replied that two sets of equipment below cannot be calibrated in Korea. Is it acceptable to bid without those two sets of equipment? | ||||
| : ELEMENT BIRD/4410-3 & WATT METER 4410A | If in-country sources are not available, please propose another lab outside Korea that can complete those two items within this availability for review. | 0001 | |||||
| 3 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0601 | For bidding purpose, please provide photos of stateroom 3-34-1 and C4I. | ERROR:#VALUE! | 0001 | ||
| 4 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0601 | 7.3 | 1. Could you please provide the relevant waterjet system drawings and technical manuals, including the hydraulic hose specifications, for our review? | |||
| 2. Could you please confirm whether the waterjet hydraulic hoses are located inside or outside the vessel's hull, particularly the 10 hoses to be installed? | Hoses will be installed outside the hull. Reference Photos attached. |
Here is additional information:
ALL HOSES
- HOSES TO BE USED MUST HAVE 350 BAR PRESSURE RATTING, ABRASION RESISTANT, SALT WATER ENVIROMENT
- HYDROTESTED AND TAGGED WITH STAINLESS STEEL TAGS AND WIRE
- OFFICAL CERTIFCATION FOR HOSE AND HYDRO TESTING
- STAINLESS 304 / 316 STEEL TO BE USED FOR FITTINGS
- HOSES ENDS NEED TO BE NON-SKIVE TYPE CRIMPS
16X - TRANSOME TO HOSE BLOCK HYDRAULIC HOSES
- 1IN HOSE DIAMETER
- 40 IN HOSE LENGTH WITHOUT FITTINGS
- 1IN FEMALE SWIVEL JIC FITTINGS
16X - STEERING HYDRAULIC HOSES
- 3/4 IN HOSE DIAMETER
- 27 IN HOSE LENGTH WITHOUT FITTINGS
- 3/4 IN MALE SWIVEL JIC FITTIG WITH O-RING TO 90 DEGREE ELBOW 3/4 IN MALE SWIVEL JIC FITTIG WITH O-RING
8X - REVERSING BUCKET HOSES
- 3/4 IN HOSE DIAMETER
- 41 IN HOSE LENGTH WITHOUT FITTINGS
| - 3/4 IN MALE SWIVEL JIC FITTIG WITH O-RING TO 90 DEGREE ELBOW 3/4 IN MALE SWIVEL JIC FITTIG WITH O-RING | 0001 | ||||
| 5 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0406 | Please provide the manufacturer, model or part number, and technical specifications for each material item listed in Paragraph 7.4 of WI 0460. | Pending answer. | |
| 6 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0598 | Please provide S/N for all the Tank Level Indicators | ||
| Please clarify whether this scope only covers routine signal output checks and calibration, or if it also includes adjustment or repair of defective sensors? | See the attached list. | 0001 | |||
| 7 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0601 | Please provide the colour and thickness of the carpet | ||
| Please provide the specifications for the lagging | Pending answer. | ||||
| 8 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 9 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 10 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 11 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 12 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 13 | Seatrium Repair & Upgrades Pte. Ltd. | ||||
| 14 | Seatrium Repair & Upgrades Pte. Ltd. | ||||
| 15 | Seatrium Repair & Upgrades Pte. Ltd. | ||||
| 16 | Seatrium Repair & Upgrades Pte. Ltd. | ||||
| 17 | Mitsubishi Heavy Industries, Ltd. | ||||
| 18 | Mitsubishi Heavy Industries, Ltd. | ||||
| 19 | Mitsubishi Heavy Industries, Ltd. | ||||
| 20 | Mitsubishi Heavy Industries, Ltd. | ||||
| 21 | Mitsubishi Heavy Industries, Ltd. | ||||
| 22 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 23 | UNITHAI SHIPYARD AND ENGINEERING LTD. | ||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 | |||||
| 31 | |||||
| 32 | |||||
| 33 | |||||
| 34 | |||||
| 35 | |||||
| 36 | |||||
| 37 | |||||
| 38 | |||||
| 39 | |||||
| 40 |
File details come from the government source that posted it. Updated .