Attachment II Price Proposal Form N6264926RA030.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Solicitation, Barge (CVE-202) FY26 Overhaul, PRO 20260001885
Solicitation number
N6264926RA030
Issued by

About this file

This is a Price Proposal Form template for solicitation N6264926RA030, establishing the framework for offerors to submit pricing for a Barge (CVE-202) FY26 Overhaul contract. The form is structured to capture labor costs (both in-house and sub-contractor man-hours), material costs, and other direct costs (ODCs) in Japanese Yen, with columns for detailed labor breakdowns by skill categories including Structural Fabrication/Repair (SFTR), Installation (INSL), Welding (WELD), Sheet Metal (SMTL), Rigging (RGRS), Painting (PNTR), Electrical (ELEC), Pipe Fitting (PFTR), Quality Assurance (QA), and other classifications.

The template includes two Cost Line Items (CLINs): CLIN 0001 for the Statement of Work covering the Barge (CVE-202) Overhaul and CLIN 0002 as a Growth CLIN, with performance scheduled from 15 June 2026 through 15 September 2026 at Yokosuka Naval Base, Japan. The form requires offerors to input data in orange-highlighted cells for in-house labor hours, sub-contractor labor hours, labor costs in Japanese Yen, material costs, and ODCs. The proposal must be submitted to Kazuo Takamura at kazuo.takamura.ln@us.navy.mil by 13 April 2026 at 10:00 AM. The form automatically links summary totals to individual work item tabs, eliminating the need for manual consolidation. Offerors must also address hazardous materials per FAR 52.223-3 and DFARS 252.223-7001, and indicate anticipated sea transportation per DFARS 252.247-7022 in their proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA030CLIN 0001(1 SOW)0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
SHIP NAME:Barge (CVE-202)CLIN 0002 (Growth CLIN)0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
AVAILABILITY:15 JUN 2026 - 15 SEP 2026Total for All CLIN0ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total WIs (Specify Total)1Total Evaluated PriceERROR:#REF!
Growth CLIN %
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.SOW No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
1N6105426RCPR112-0SOW Barge (CVE-22) OverhaulERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

N6105426RCPR112-0

SHIP NAME/AVAILABILITY:Barge (CVE-202)SOW N6105426RCPR112-0 SUMMARY
SOLICITATION #:N6264926RA030
SOW #:N6105426RCPR112-0In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:SOW Barge (CVE-202) Overhaul00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .