2.02 Attachment II Price Proposal Form N6264926RA001.xlsx

XLSX spreadsheet 109 KB Posted

Attached to
USS DEWEY (DDG-105) FY26 6C1 SRA Bundle# 4 (Yokosuka, Japan)
Solicitation number
N6264926RA001
Issued by

About this file

This is a Price Proposal Form for a ship repair and maintenance solicitation (N6264926RA001) for USS DEWEY (DDG-105) at Commander, Fleet Activities Yokosuka Naval Base in Japan. The solicitation covers 11 specific Task Group Instructions (TGIs) involving inspection, preservation, and repair of various ship components including deck plating, air intake systems, uptake spaces, structural bulkheads, and weather-exposed areas. The period of performance is from 30 March 2026 through 07 September 2026, with proposals due by 17 November 2025 at 10:00 AM Japan Standard Time.

The pricing document is structured to capture labor hours, material costs, and other direct costs (ODCs) across multiple work items, with a growth CLIN percentage of 8.80%. The solicitation is specifically targeted to sources authorized to operate in Japan, issued by the Department of the Navy Naval Supply Systems Command (NAVSUP Fleet Logistics Center Yokosuka). References for detailed work instructions will be provided to offerors via DoD Safe, a secure file transfer platform, with contact points for inquiries being Kumi Matsumoto and Ai Gillard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA001CLIN 0001(11 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS DEWEY (DDG-105)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:FY26 6C1 SRA Bundle# 4Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)11Total Evaluated Price¥0
Growth CLIN %8.80%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138K42123AD-A01F/O - INSPECT AND PRESERVE DECK PLATING IN 1-388-2-Q000¥0¥0¥0¥0
238K4212352-A01F/O - INSPECT, REPAIR, AND PRESERVE NO. 2 SSGTG INTAKE DIRTY SIDE000¥0¥0¥0¥0
338K4212353-A01F/O - INSPECT AND PERSERVE AIR INTAKE AND UPTAKE LOUVER000¥0¥0¥0¥0
438K4212355-A01F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE000¥0¥0¥0¥0
538K4212391-A01F/O - ASSESS, REPAIR, AND PRESERVE NO. 2B GTM INTAKE DIRTY SIDE, 02-275-0-Q000¥0¥0¥0¥0
638K4212392-A01F/O - ASSESS, REPAIR, AND PRESERVE NO. 2A GTM INTAKE DIRTY SIDE000¥0¥0¥0¥0
738K4212393-A01F/O - ASSESS, REPAIR, AND PRESERVE NO. 2B GTM INTAKE DIRTY SIDE, 03-274-0-Q000¥0¥0¥0¥0
838K4213905-A01F/O - REPAIR WTRTT EXTERIOR LONGITUDINAL BULKHEAD PLATE, 05 LEVEL WEATHER, STBD000¥0¥0¥0¥0
938K4215002-A01F/O - PRESERVE VARIOUS LOCATION ON WEATHER000¥0¥0¥0¥0
1038K4215004-A01F/O – PRESERVE FORWARD SUPERSTRUCTURE000¥0¥0¥0¥0
1138K4262201-A01F/O – REPAIR AND PRESERVE STRUCTURAL MEMBER IN 4-174-0-E000¥0¥0¥0¥0
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_38K42123AD-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 1_38K42123AD-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:1_38K42123AD-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INSPECT AND PRESERVE DECK PLATING IN 1-388-2-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

2_38K4212352-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 2_38K4212352-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:2_38K4212352-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INSPECT, REPAIR, AND PRESERVE NO. 2 SSGTG INTAKE DIRTY SIDE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

3_38K4212353-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 3_38K4212353-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:3_38K4212353-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INSPECT AND PERSERVE AIR INTAKE AND UPTAKE LOUVER00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

4_38K4212355-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 4_38K4212355-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:4_38K4212355-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - INSPECT, REPAIR, AND PRESERVE FWD UPTAKE SPACE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

5_38K4212391-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 5_38K4212391-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:5_38K4212391-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - ASSESS, REPAIR, AND PRESERVE NO. 2B GTM INTAKE DIRTY SIDE, 02-275-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

6_38K4212392-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 6_38K4212392-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:6_38K4212392-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - ASSESS, REPAIR, AND PRESERVE NO. 2A GTM INTAKE DIRTY SIDE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

7_38K4212393-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 7_38K4212393-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:7_38K4212393-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - ASSESS, REPAIR, AND PRESERVE NO. 2B GTM INTAKE DIRTY SIDE, 03-274-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

8_38K4213905-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 8_38K4213905-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:8_38K4213905-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPAIR WTRTT EXTERIOR LONGITUDINAL BULKHEAD PLATE, 05 LEVEL WEATHER, STBD00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

9_38K4215002-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 9_38K4215002-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:9_38K4215002-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - PRESERVE VARIOUS LOCATION ON WEATHER00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

10_38K4215004-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 10_38K4215004-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:10_38K4215004-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – PRESERVE FORWARD SUPERSTRUCTURE00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

11_38K4262201-A01

SHIP NAME/AVAILABILITY:USS DEWEY (DDG-105) - FY26 6C1 SRA Bundle# 4TGI 11_38K4262201-A01 SUMMARY
SOLICITATION #:N6264926RA001
SRF-JRMC TGI #:11_38K4262201-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – REPAIR AND PRESERVE STRUCTURAL MEMBER IN 4-174-0-E00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .