Item Description (20260831).pdf

PDF 191 KB Posted

Attached to
Pipe Bending Machine
Solicitation number
N6264926QE043
Issued by

About this file

This is an Item Description for a federal procurement of a pipe bending machine and related equipment.

The procurement requires delivery and installation of one TAIYO TB-DR-2HANC pipe bending machine to support the pipe shop at SRF Sasebo for ship repair and maintenance. The machine measures 2,940mm length x 950mm width x 1,010mm height, weighs 1,900kg, and requires 3-phase 200V, 60Hz power supply with a 5.5kw electric motor and 13.9KVA total electrical capacity. The machine can bend pipes with outer diameter 60.5mm and 5.5mm thickness in CRES, C-steel, and CU/NI materials at angles up to 180 degrees with a maximum machining radius of 300mm. The contractor must provide 29 items including the base machine, pneumatic rail retraction device, power cable, safety equipment, instruction manuals in Japanese and English, and comprehensive pipe bending molds ranging from 1/4-inch to 2-inch diameters with various specifications. All items must be delivered and installed within 6 months after contract date. Requirements include electrical installation (3-phase, 200V, 60Hz), witnessing test runs with the manufacturer engineer, and conducting training in operation, maintenance, and inspection. The Government will furnish no materials, equipment, or services. The Technical Point of Contact is Hideaki Ura (Equipment Specialist, SRF Sasebo), and the Contracting Point of Contact is Yasuhiko Motooka (Contract Specialist, NAVSUP FLCY Sasebo Contracts Division). All schedule coordination must occur through the Technical POC, and only the Contracting Officer may authorize changes to contract terms.

View the file

Other files

File Type Posted
RFQ_N6264926QE043.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM DESCRIPTION (20260831)

1. SCOPE:

1.1 The purpose of this procurement is for the contractor to Pipe Bending Machine with various molds to support the pipe shop in SRF Sasebo for ship repair and maintenance. Provide all required labor, tools, materials, and equipment to accomplish this requirement.

1.2 Delivery Location:

See block 15 “DELIVER TO” at the first page and/or “SHIP TO ADDRESS” in “DELIVERY

INFORMATION”.

1.3 Identification:

1.3.1 Item Name: Pipe Bending Machine

Manufacturer Name: TAIYO Production/Model #: TB-DR-2HANC Quantity: One (1) each Other Information:

Machine size: Length2940mm x Width950mm x Height1010mm Machine Weight: 1900kg Power Supply: 3-Phase 200V, 60Hz Electric Motor: 5.5kw Total electrical capacity: 13.9KVA (40.2A) Hydraulic Tank: 150ℓ Bendable Diameter: Outer diameter 60.5, Thickness5.5mm Bendable Material: CRES, C-Steel, CU/NI Pipe Bending Mold (see paragraph 1.3.2 for detail):

a. Pipe Out Dia (IPS) X5DR (1/4, 3/8, 1/2, 3/4, 1”, 1”1/4, 1”1/2, 2”)

b. Nominal Dia of Pipe (IPS) X5DR ((1/4, 3/8, 1/2, 3/4, 1”, 1”1/4, 1”1/2, 2”)

c. OD Thickness t0.035X 3DR (5/8, 3/4, 1”, 1”1/4, 1”1/2)

Bending Angle: 180 Degrees Max Machining Radius: Radius 300mm Control Specification: Remote Push Button Angle Selection: 6 Stages (manual) Operation method: 1 Cycle interlock

1.3.2 Provide following accessories for the item 1.3.1.

Description Qty. Unit of Issue 1 Pneumatic Rail Retraction Device (for 90° bends) 1 EA 2 Wipers mounting frame 1 EA 3 Primary power cable (10m) 1 EA 4 Safety Sticker 1 EA 5 Safety Switch (Safety Mat) 1 EA 6 Instruction Manual (Japanese and Englich) 1 EA 7 SDS for Hydraulic Oil (Japanese and English) 1 EA 8 PCB Certification 1 EA

a. Molds for item 1.3.1: IPS (roll, clamp, guide rail, mandrel) 9 1/4(φ13.72×R70) (t1.651, t2.24, t3.02Shared) 1 EA

10 3/8(φ17.15×R90) (t1.651, t2.31, t3.2Shared) 1 EA 11 1/2(φ21.34×R110) (t1.651, t2.77, t3.73Shared) 1 EA 12 3/4(φ26.67×R135) (t1.651, t2.89, t3.91Shared) 1 EA 13 1"(φ33.4×R170) (t1.651, t3.38, t4.55Shared) 1 EA 14 1"1/4(φ42.16×R210) (t1.829, t3.56, t4.85Shared) 1 EA 15 1"1/2(φ48.26×R240) (t1.829, t3.68 t5.08Shared) 1 EA 16 2"(φ60.33×R302) (t2.108, t3.91 t5.54Shared) 1 EA

b. Molds for item 1.3.1 (roll only) 17 1/4(φ13.72×R32) (t2.24, t3.02Shared) (washer roll) 1 EA

18 3/8(φ17.15×R48) (t2.31, t3.2Shared) (washer roll) 1 EA 19 1/2(φ21.34×R64) (t2.77, t3.73Shared) 1 EA 20 3/4(φ26.67×R96) (t2.89, t3.91Shared) 1 EA 21 1"(φ33.4×R127) (t3.38, t4.55Shared) 1 EA 22 1"1/4(φ42.16×R159) (t3.56, t4.85Shared) 1 EA 23 1"1/2(φ48.26×R191) (t3.68, t5.08Shared) 1 EA 24 2"(φ60.33×R254) (t3.91, t5.54Shared) 1 EA

c. Molds for item 1.3.1 (rollers, clamps, guide rails, mandrels, wipers) 25 5/8(φ15.87×t0.889×R50) (washer roll) 1 EA 26 3/4(φ19.05×t0.889×R60) 1 EA 27 1"(φ25.4×t0.889×R80) 1 EA 28 1"1/4(φ31.75×t0.889×R100) 1 EA 29 1"1/2(φ38.1×t0.889×R120) 1 EA

1.4 See DELIVERY INFORMAITON on SF 1449.

Coordinate delivery schedule with the Government Technical Point of Contact (Govt TPOC). If the contractor realizes any potential or actual delay in delivery, report to the Government Contracting POC via the Government Technical POC.

Note: Deliver and install all items to the designated delivery location within 6 months After Date of Contract (ADC). This is preferred completion date, and actual completion date will be specified upon award.

2. REFERENCE/ATTACHMENT: N/A

3. REQUIREMENTS:

3.1 Transport and install the item listed in paragraph 1.3.1 and 1.3.2 to the designated Delivery Location at paragraph 1.2. The installation work includes electrical work (machine power supply:

3-phase, 200V, 60Hz)

3.2 Witness the test run (together with the manufacture engineer)

3.3 Conduct training in operation, maintenance, and inspection (together with the manufacture engineer).

4. GOVERNMENT FURNISHED

4.1 MATERIAL (GFM): None.

4.2 EQUIPMENT (GFE): None.

4.3 SERVICE: None.

5. NOTE:

5.1 The Government POC:

Technical POC Contracting POC

Name: Hideaki Ura Title: Equipment Specialist Command/Ship: SRF Sasebo

TEL: 0956-50-6748

E-Mail: hideaki.ura.ln@us.navy.mil

Name: Yasuhiko Motooka Title: Contract Specialist Command: NAVSUP FLCY Sasebo Contracts

Division

TEL: 0956-50-68227

E-Mail: Yasuhiko.motooka3.ln@us.navy.mil

5.1.1 Only the Government Technical POC has authority to coordinate schedule with the contractor within terms and conditions of this contract. The Government Technical POC will coordinate base access and provide escorts for the contractor if escorts are required for personnel entering, departing, and working in required areas. Ask any payment issue as the first POC.

5.1.2 Only the Contracting Officer and/or designated Contracting POC have authority to change any terms and conditions of this contract. Report any conditions, discrepancies, and/or finding to the Contracting POC via the Government Technical POC. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. See NAVSUP Local Text titled “Authorized Changes Only by the Contracting Officer.”

(End of Item Description)

File details come from the government source that posted it. Updated .