This is a Job Specification document for repair and inspection work on USS NEW ORLEANS (LPD-18), a naval vessel undergoing maintenance at Sasebo. The work order (ICN: 38KFA12321RR, Revision 03) addresses repair of Ballast Tank 6-193-2-W and inspection of degaussing piping systems.
The scope of work encompasses cleaning and repair of a single ballast tank with a capacity of 191.678 cubic meters located in compartment 6-193-2-W, plus inspection and air testing of approximately 24 feet of 6-inch IPS degaussing piping that runs from Frame 193 through the Steering Gear Pump Room (4-188-2-Q) and Stern Gate Machinery Room No. 2 (3-188-6-Q). Key requirements include attending a pre-brief with contractor, government, and ship's force; accomplishing tank cleaning per enclosure specifications; conducting air pressure testing at 50 PSIG (+1/-0) with zero allowable leakage for minimum 30 minutes; submitting condition reports documenting test results; and performing surface cleaning and preservation. The anticipated award date is 08/24/2026 with production completion by 09/30/2026 and period of performance from 09/01/2026 through 10/31/2026. Government-furnished materials include bolts, screws, washers, gaskets, cotton grommets, rubber and cork sheets, welding rods, insulation board, tape, adhesives, steel pipe, fittings, and couplings. Related work on cofferdam installation and degaussing coil removal will be conducted under separate ICNs (H01 and H02 respectively). The work is prepared at Sasebo and requires coordination with ship's Damage Control Assistant to maintain stability and prevent flooding during fluid transfers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264926Q0563.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ShlD/HULL NO. ShlD/HULL NAME ICN: Rev:
LPD-18 USS NEW ORLEANS
JON: 38KFA12321RR 03
TITLE: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1)-Degausslng Piping; Inspect
JOB SPECIFICATION
Anticipated Award Date: Production Completlon Date:
D3 /2.-t/ /;;.,- o9/~o/~ POP Start Date: POP End Date:
c/1/01 f~~b (fJ/~,1~~
PREPARED BY: CODE
Y.HAMABE H HA
APPROVED BY: ~
CODE
S.MURAKAMI s22s· CONCURRED BY: ~ .. en.. ' CODE
S.MOROOKA ...,. J S231
ASSIST PLANNER'S NAME: CODE
S.TERASHITA P TE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DIVING OPS
DESCRIPTION:
PREPARING ACTIVITY:
SASEBO
DATE
8/11/2026
JSN(Sl: ER01-2356 CASREP # 25079, C-2, DTG: 150008ZAUG25
S/F CONTACT: TORREY DCC/ CHAVEZ LTJG CWP# CCNS#
Approved by S300/S900 ~ Date: \ I ~ 2(J2..li, Avl: 6CM
1.-T f\,\ot..l tvA
LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.:
WORK CERTIFICATION SIGNATURES
Key Op:
A02
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
1301404011
Ship/HULL NO. Ship/HULL NAME
LPD-18 USS NEW ORLEANS
JON:
TITLE: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1)~Degausslng Piping; Inspect
1. SCOPE:
ICN:
38KFA12321 RR
1.1 Title: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1)~Degaussing Piping; inspect
1.2 Location of Work:
1.2.1 Ballast Tank (6-193-2-W)
1.2.2 Steering Gear Pump Room (4-188-2-Q)
1.2.3 Stern Gate Machinery Room No.2 (3-188-6-Q)
1. 3 Identification:
Rev:
1.3.1 Quantity (One EA), Ballast Tank, Capacity 191.678 Cubic Meters, Located in 1.2.1
Key Op:
A02
1.3.2 Quantity (One EA), 6 Inch IPS Degaussing Piping (Approximately 24 Feet Long) Located in 1.2.1 through 1.2.3 from Bulkhead Penetration (Frame 193) and Overhead Penetration, Steel
2 . REFERENCES:
2. 1 Standard Items ( FY2 6)
2.2 167-7317994 Rev F, Manhole List
2.3 600-7318177 Rev G, Outfitting Items Structural Unit 3452
2.4 505-7319711 Rev G, Piping Arrangement Unit 3452 SPECON
2.5 06-3452-07 Rev G, Piping Arrangement Unit 3452 P/D
3. REQUIREMENTS:
(V) (G) "PRE-BRIEF"
3.1 Prior to the start of work, attend Pre-Brief to confirm that the Contractor, the Government, and the Ship's Force understand the tasks the contractor is required to accomplish as part of this job specification and that each of the parties understand the precautionary measures to be taken to prevent flooding while the repairs/alterations are in progress and who has responsibility for such measures. -SHIPSUPT
TANK NO.
6-193-2-W
Opening Item 085-7318347 Rev C
P/S
PORT
Valve #/Size 529-7317947 Rev G
BAL-V-6-193-6 SEA VLV NO.1/ 6 Inch
Ship/HULL NO. ShlD/HULL NAME ICN: \ Rev: Key Op:
JON:
LPD-18 USS NEW ORLEANS 38KFA12321 RR 1 03 A02
TITLE: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1)-Degausslng Piping; inspect
3.1.1 Upon completion of the work, contact SHIPSUPT and ensure that each temporary cofferdam has been cleared by Diver.
3.2 Accomplish the requirements of ENCLOSURE (T) for cleaning of each ballast tank listed in 1.3.1 using 2.2 and 2.3 for guidance.
3.3 Accomplish an air test of existing piping listed in 1.3.2 to verify tightness of existing piping listed in 1.3.2, using clean air at 50 (+1/-0) PSIG for a minimum of 30 minutes, using 2.4 and 2.5 for guidance. Allowable leakage: None.
(V) "REPORT"
3.3.1 Submit one legible condition report listing results of the requirements of 3.3 to SUPERVISOR.
3.4 Accomplish the requirements of 009-032 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.
4. NOTES:
4.1 Initial Condition - During ships recent AMW CERT, Ships force discovered multicable penetration to be degraded causing sea water from the ballast tank to leak by into the space. When ships force attempted to pressurize the tank to remove sea water the assembly came out completely making the tank OOC. Tank is heavily relied upon for ballast and DEBALLASTING evolutions and is crucial to ships mission.
4.2 SRF tool room will issue each torque wrench and pressure gauge when required.
4.3 Each Cofferdam will be installed and removed by ICN 38KFA12321 H0l for the ballast tank.
4.4 Degaussing coil removal and installation work will be conducted under
38KFA12321 H02.
5. GOVERNMENT FURNISHED MATERIAL (GEM) :
5.1 Government Furnished Materials as follows.
MATERIAL LIST
QTY
ITEM PC REF STOCK HAZ DOC REQD/ PARA
NO. NO. NO. M/C DESCRIPTION NUMBER MAl NO. UNIT NO.
930 M BOL T,MAC, 5/8"-11 UNC X 1- 9B 5306 000873762 N 5261B001 26/EA 3.2
1/4"L
931 M SCREW,CA, 5/8"-11 UNC X 1- 9B 5305 007215322 N 5261B002 26/EA 3.2
1/2"L
932 M WASHER,F, 0.656" I.DX 9B 5310 006143505 SY N 5261B003 26/EA 3.2
1.312"O.D X 0.095" THK
Shlo/HULL NO. Shlo/HULL NAME J ICN: I Rev: Key Op:
LPD-18 USS NEW ORLEANS JON: I 38KFA12321 RR I oa A02 TITLE: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1 )-Degaussing Piping; Inspect
MATERIAL LIST
ITEM PC REF STOCK
NO. NO. NO. M/C DESCRIPTION NUMBER
933 M COT GROM, SIZE: 5/8 9B 9999 SACOT5850
NOMINAL SIZE, .50/1 COTTON
ROVING YARN, 100% COTTON,
HAND-WOVEN
934 M NUT,PLAI, 3/4-10 UNC-2B, 9B 5310 015401448
ASTM F594
935 M WASHER,F, 0.812" I.DX X 9B 5310 013844230
1.469"O.D X 0.134" THK
936 M COT GROM, SIZE: 3/4 9B 9999 SACOT3450
NOMINAL SIZE, .20/3 COTTON
ROVING YARN, 100% COTTON,
HAND-WOVEN
937 M RUBBERS, MIL-PRF-1149 9B 5330 SA2100947
TYPE-II CLASS-2, SIZE;
3/16"THK X 36" W X 36" L
938 M CORK AND, SAE-AMS-C-6183 9B 5330 002971073
TYPE-II CLASS-1, GRADE C
SIZE· 3/16"THK X 36" W X 36" L
939 C BAR.META, 3/4" DIA, CRES 9B 9510 001890622
960 C PIPE, PIPE, STEEL, 6"IPS, 9B 4730 SAPTE0277
6.625"OD X 0.219'WT,
ELECTRIC RESISTANT
WELDED APl-5L GR-X42
961 C FITTING, REDUCER, 8" X 6" 9B 4730 SA4892246
IPS, 260-8X6, BW, ASA B16.9,
ASTM A234 C-STEEL
963 C FITTING, COUPLING, SLIP ON, 9B 4730 SAPTE0288
6"IPS, FILLET WELD, 3000 PSI,
STEEL ASTM A105
964 C ROD.WELD, WELDING 9B 3439 010172792
ELECTRODE, 3/32 X 36, MIL-
70S-2, MIL-E-23765/1, CL.6,
GTAW
965 C INSULATI, INSULATION 9Q 5640 013713263
BOARD, 1" X 2' X 3', W/CLOTH,
MIL-DTL-24688 TY.II, CL.1,
POLYIMIDE
966 C TAPE.TEX, 2" X 50 YD, MIL-C- 9B 8315 002671632
20079H TY.II, CL.1, STATIN
WEAVE GLASS FIBER
967 C ADHESIVE, ADHESIVE, WHITE, 9B 8040 002738708
MIL-DTL-3316D CL.1, GR.A
1GUUI
QTY
HAZ DOC REQD/ PARA
MAl NO. UNIT NO.
N 5338E906 1/BG 3.2
N 5261B004 25/EA 3.2
N 5261B005 25/EA 3.2
N 5338E904 1/BG 3.2
N 5338E902 2/SH 3.2
N 5261B006 2/SH 3.2
N 5261B007 10/FT
N 5342D805 10/FT
N 5342D821 2/EA
N 5342D820 4/EA
y 5290D512 1/CO
N 5290D511 1/SH
N 5290D510 1/RO
y 5294D753 1/GL
Ship/HULL NO. Ship/HULL NAME I ICN: I Rev: Key Op:
JON: I 38KFA12321 g_i· LPD-18 USS NEW ORLEANS
TITLE: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1)~Degaussing Piping; inspect
General Requirements For Tank. Void and/or Cofferdam Cleaning
: 03 A02
Ver.05012021
1 . REQUIREMENTS:
1.1 Open, ventilate, conduct gas free, empty, clean, render dry, and maintain each tank, void and/or cofferdam throughout the work item performance period.
1.1.1 Ensure that each harmful vapor, fume, and mist is ventilated to the exterior of the vessel.
(V) "REPORT"
1.1.1.1 Submit one legible copy of a report listing the location, origin, and quantity of each manhole cover removed in 1.1 with respect to its tank, ship's frame and distance off centerline to SUPERVISOR after the inspection.
1.1.2 Remove and dispose of waste liquid that is not being stored for reuse to a Government provided waste liquid conveyance.
1.1.2.1 Contact the SRF-JRMC Detachment Sasebo ESH Division, Environmental Branch, Sl06.3 prior to transfer of waste liquid to the conveyance.
1.1.2.2 Provide watches and following spill kits (absorbent pads, booms, etc. for oil or chemical spill containment) at each affected area where waste liquid is being transferred to ensure that each liquid is not released to any shipboard compartment or the sea. In case of a spill, take immediate action to contain the spill, and contact Sl06.3.
1.1.2.3 Identify each transfer hose to the conveyance by affixing the company's name and tank/space location pumping from on each hose.
1.1.2.4 Establish and maintain communication between the pumping station and the conveyance when the waste liquid is being transferred.
(V) "INSPECT PIPING AND HOSE ALIGNMENT"
1.1.2.5 Inspect alignment of each hose, valve and piping in the flow path prior to the start of pumping, purging, or flushing.
1.1.2.6 Accomplish a periodic walkthrough of each piping, hose, and valve alignment for leaks at least once an hour.
1.1.2.7 Pumping after sunset is not authorized unless approved by
SUPERVISOR.
ENCLOSURE ( T) 1/2
ShlD/HULL NO. ShlD/HULL NAME
JON:
ICN: Rev: Key Op:
LPD-18 USS NEW ORLEANS
TITLE: MCP for Ballast Tank (6-193-2-W); repair
Rev-03(FO1 )~Degaussing Piping; inspect
38KFA12321 RR 03 A02
1.1.3 Coordinate the off-loading or transferring of each fluid through the ship's Damage Control Assistant (DCA), via SHIPSUPT, to maintain ship's stability and to prevent flooding.
(V) (G) "VISUAL INSPECTION"
1.2 Inspect each tank, void and/or cofferdam for cleanliness, prior to final closing. Document the personnel who were present during the inspection and confirm that they have exited the space prior to closure of each tank, void, and cofferdam. Designate one person to account for personnel who may have entered the space. -S130
1.2.1 Install each manhole cover for each tank, using each new gasket and fastener.
2. NOTES:
2.1 Booklet of General Plans and Tank Sounding Tables are available for review at the office of the SUPERVISOR.
2.2 The SUPERVISOR will provide a waste liquid conveyance to accumulate waste liquids in each tank for work being accomplished for SRF-JRMC availabilities.
2.3 See additional CHT/sewage tanks disinfection requirements of Local Standard Item 099-901YO for SRF-JRMC Sasebo availabilities.
ENCLOSURE (T) 212