This is a Job Specification document for temporary repair and preservation work on the Hot Water Accumulator Tank (PW-TK-0008) aboard USS TRIPOLI (LHA-7). The work is being performed at Naval Ship Repair Facility (SRF), Japan Regional Maintenance Center in Sasebo, Japan. The anticipated award date is 01/11/2026, with work scheduled from 10/13/2026 through 01/29/2027, with production completion targeted for 12/18/2026.

The primary scope involves repairing a pinhole leak discovered on the hot water accumulator tank located in the Laundry Water Heater Room (4-73-1-Q). The tank is an 8-foot-long, 500-gallon vessel with 1/4-inch steel plate construction. Work requirements include: conducting liquid penetrant inspection to identify the pinhole extent; performing build-up welding per NAVSEA S9074-AR-GIB-010/278; conducting 5X visual testing of the repair area; accomplishing complete internal surface cleaning to SSPC standards with tiered approaches (power tool, hand tool); performing a 176 psig hydrostatic strength test and operating pressure test; conducting disinfection and bacteriological testing at laboratories meeting potable water purity standards; and cleaning/preservation of all new and disturbed surfaces. Materials provided by SRF include welding electrodes, adhesives, insulation sheet, cloth, rubber sheets, pipe covering, fasteners, and anti-seize compound. The work certification process requires completion of work review signatures documenting personnel involvement and date completion. This specification is referenced against multiple supporting documents including engineering liaison memoranda addressing temporary repair procedures and potable water system purity certification requirements per NSTM Chapter 533 and Japanese water quality standards.

View the file

Other files

File Type Posted
Solicitation - N6264926Q0521.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LHA-7 USS TRIPOLI

JON. 38DJA65404 AOl

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:

SASEBOPOP Start Date: POP End Date:

PREPARED BY:

A.HAMADA

CODE

P_HA

DATE

2/25/2026

APPROVED BY:

S.MURAKAMI

CODE

S225

CONCURRED BY: -y'

T.TAKAMASU --?L.

CODE

S234

ASSIST PLANNER'S NAME:

T. SATO

CODE

H_ST

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(S): EAOI -0721 CASREP#

S/F CONTACT: SUYAT MMI / HANNA MMC CWP # CCNS # LHA7-004-26

0. PERKjN ,-

Approved by S300/S900 Date: C ' 1.i2 Z' . AvI: 6A1

LWC:

Work Completed

S/Force: Rate: Date:

SHIPSUPT: Date: SRF CONTROL NO.:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE DATE:

V7

Sakura.Yamaguchi.ja Cross-Out

Sakura.Yamaguchi.ja Typewritten Text

38DJ265401

Sakura.Yamaguchi.ja Typewritten Text 09/11/2026

Sakura.Yamaguchi.ja Typewritten Text 10/13/2026

Sakura.Yamaguchi.ja Typewritten Text 12/18/2026

Sakura.Yamaguchi.ja Typewritten Text 01/29/2027

Sakura.Yamaguchi.ja Cross-Out

Sakura.Yamaguchi.ja Typewritten Text 7J1

Sakura.Yamaguchi.ja Typewritten Text All pages of this documents will change ICN from 38DJA65404 to 38DJ265401 where written as shown on this cover sheet.

All pages of this documents will change avail from 6A1 to 7J1 where written as shown on this cover sheet.

Sakura.Yamaguchi.ja Typewritten Text 1301395483

Ship/HULL NO.

LHA-7

Ship/HULL NAME ICN: Rev: Key Op:

USS TRIPOLI JON: 38DJA65404 AOl

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve

1. SCOPE:

1.1 Title: Hot Water Accumulator Tank (PW-TK -0008); temporary repair and preserve

1.2 Location of Work:

1.2.1 Laundry Water Heater Room (4 -73 -l -Q)

1.3 Identification:

1.3.1 Quantity (One EA), Hot Water Accumulator Tank (PW-TK-0008) Located in 1.2.1, 8 Feet Overall Length by 42 Inches 0.0., Capacity:

500 Gallons, Consists of 1/4 Inch Thick Steel Plate Body (MIL-S- 22698, Grade-A, Class -U), 2 EA of 2:1 Ratio Elliptical Head (ASTM-A- 285, 1/4 Inch Thick) and One EA of 18 Inch IPS Manhole, See 2.3 and

ENCLOSURE (A)

2. REFERENCES:

2.1 Standard Items (-F'tS-fr)

sY:

2.2 ELM-265075, Hot Water Accumulator Tank TEMP Repair (Enclosed)

2.3 123-6125870 Rev H, 500 Gallon Hot Water ACC TK

2.4 533-7566301 Rev F, Potable Water Piping System Diagram

2.5 533-7569063 Rev B, Fresh Water Piping ASSY 317

2.6 T9074 -AS-GIB-010/271 Rev One, Requirements for Nondestructive Testing Methods

2.7 ELM-255141, Potable Water System Purity Certification (Enclosed)

3. RLQUIRENT5:

3.1 Accomplish the requirements of ENCLOSURE (T) for cleaning of each accumulator tank listed in 1.3.1.

3.2 Accomplish the requirements of 2.2 to repair each accumulator tank listed in 1.3.1, using 2.3 through 2.5 for guidance.

(I) "LIQUID PENETRANT INSPECTION (PT)"

3.2.1 Accomplish liquid penetrant inspection in accordance with Chapter 5 of 2.6 to identify extent of pinhole.

3.2.2 Accomplish the requirements of 009-12 of 2.1, including Table One Column 0, Lines One through 10.

2/ /7

Sakura.Yamaguchi.ja Cross-Out

LHA-7 USS TRIPOLI JON. 38DJA65404 AOl

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve

3.2.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean fresh water at 176 (+4/-O) PSIG, for new and disturbed accumulator tank.

3.3 Accomplish the requirements of 009-32 of 2.1 including Table 4, One system out of Line 4, Columns A, B and D or Line 5, Columns A and B for entire inside surface of each accumulator tank listed in 1.3.1, using manufacturer's instruction for guidance.

3.3.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.

3.3.1.1 Power tool clean each narrow area to SSPC-SP-3 where

power tool in 3.3.1 cannot reach.

3.3.1.2 Hand tool clean each narrow area to SSPC-SP --2 where power tool in 3.3.1.1 cannot reach.

3.4 Accomplish the requirements of 009-87 of 2.1 for each accumulator tank listed in 1.3.1.

3.4.1 Accomplish the requirements of 009-09 of 2.1 for disinfection.

3.4.2 Bacteriological testing must be conducted at laboratories that meet the paragraph 5 of 2.7.

(V) (G) "OPERATING PRESSURE TEST"

3.5 Witness an operating pressure test of new and disturbed accumulator tank and piping to, be conducted by ship's force to verify tightness of each mechanical joint affected by this work item, until the specified criteria is verified. Allowable leakage: None. - S130

3.6 Accomplish the requirements of 009-11 of 2.1 for the component affected by this work item.

3.7 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.

4. NOTES:

4.1 Initial Condition - Ship's Force discovered a pinhole leak on hot water accumulator tank and requires repair pinhole and preservation and coating of accumulator tank inside.

4.2 SRF tool room will issue pressure gauges.

5. GOVERNMENT FURNISHED MATERIAL:

5.1 SRF will provide following material.

/"7

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve

MATERIAL LIST

_-.ic _______ ____ QTY

ITEM PC REF / STOCK HAZ DOC REQD/ PARA

NO. NO NO C DESCRIPTION NUMBER MK NO. UNIT N

001 M INSULATION SHEET, SHEET, 3/4"THKX Q 5640 SA9607854 N 6027E983 36/SF 3.6

3FT W X 4FT L, K-FLEX ECO, NON

HALOGEN RUBBER FOAM

002 M CLOTH,PL, GLASS CLOTH, 5 FTWX 50

9B 8305 001487363 N

6012B004

1/RO 3.6

YD, MIL-C-20079H TY.I, CL.3, L/W

003 M ADHESIVE, ADHESIVE, WHITE, MIL-DTL-

9B 8040 002738708 Y

6048B824

1/GL 3.6

3316D CL.1, GR.A 1GUUI

004 M ADHESIVE, ADHESIVE, NEOPRENE, MIL-

9B 8040 008419773 Y

6027B823

8/PT 3.6

A-24179ATY.II, CLI, 1PT-CAN

005 M ROD,WELD, WELDING ELECTRODE,

9B 3439 009008737 Y

6016B007 1/CO 3.2

1/16 X 36, MIL-705-2, MIL-E-23765/1,

CL.6, GTAW, 5 LB/CO

006 M RUBBER SHEET,SOLID,, SHEET,

9B 5330 011261340 N

6040B066 1/SH 3.2

RUBBER, 1/8"X36"X36", I-IH-P-151,

CL.3, STYLENE-BUTADIENE

007 C PIPE, COVER, PIPE COVERING, 2"IPS, 2-

PQ 5640 SA9607844 N

6027E302

2/EA N/A

3/8" ID X 314" THK X 6 FT LG, 6FT/EA

008 C PIPE, COVER, PIPE COVERING, 3"IPS, 3-

Q 5640 5A9607846 N

6027E303

2/EA

N/A

1/2"IDX3/4"TFIKX6 FTLG, 6FT/EA

100 C SCREW,CAP,HEXAGON, HEAD, 1-1/8-

9B 5305 012770447 N

6009B036

20/EA

N/A

7UNC-2A, 3-3/4 INCH LG

101 C NUT,SELF-LOCKING, HEXAGON, 1-1/8-

9B 5310 010147290 N

6008B135

20/EA N/A

7UNC-3B, MS17829-18C

102 C RUBBER SHEET, SOLID,CLOTH INSERT,

9B 5330 001790052 N

6008B137 2/SY N/A

1/8 INCH THK, 36 INCH X 36 INCH, OIL

AND WATER RESISTANT, HH-P-151

103 M ANTISEIZECOMPOUND,A-A-59313, 8

9B 8030 002921102 Y

6048B809

1/TU 3.3

OZITU

LHA -7 USS TRIPOLI

JON. 380JA65404 AOl

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve e:in131

I 13-1-Q -

I

'C' I

I 4.

k

Pinhole Leak Spot

I:'

I

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve

General Requirements For Tank, Void and/or Cofferdain Cleaning

Ver. 05 0 12 021

1. REQtJIREMENTS:

1.1 Open, ventilate, conduct gas free, empty, clean, render dry, and maintain each tank, void and/or cofferdam throughout the work item performance period.

1.1.1 Ensure that each harmful vapor, fume, and mist is ventilated to the exterior of the vessel.

(V) "REPORT"

1.1.1.1 Submit one legible copy of a report listing the location, origin, and quantity of each manhole cover removed in 1.1 with respect to its tank, ship's frame and distance off centerline to SUPERVISOR after the inspection.

1.1.2 Remove and dispose of waste liquid that is not being stored for reuse to a Government provided waste liquid conveyance.

1.1.2.1 Contact the SRF-JRMC Detachment Sasebo ESH Division, Environmental Branch, S106.3 prior to transfer of waste liquid to the conveyance.

1.1.2.2 Provide watches and following spill kits (absorbent pads, booms, etc. for oil or chemical spill containment) at each affected area where waste liquid is being transferred to ensure that each liquid is not released to any shipboard compartment or the sea. In case of a spill, take immediate action to contain the spill, and contact S106.3.

1.1.2.3 Identify each transfer hose to the conveyance by affixing the company's name and tank/space location pumping from on each hose.

1.1.2.4 Establish and maintain communication between the pumping station and the conveyance when the waste liquid is being transferred.

(V) "INSPECT PIPING AND HOSE ALIGNMENT"

1.1.2.5 Inspect alignment of each hose, valve and piping in the flow path prior to the start of pumping, purging, or flushing.

1.1.2.6 Accomplish a periodic walkthrough of each piping, hose, and valve alignment for leaks at least once an hour.

SUPERVISOR.

1.1.2.7 Pumping after sunset is not authorized unless approved by

ENCLOSURE (T) 1/2

'7 '/7

Shi /HULL NO. Shi /HULL NAME ICN: Rev: Key Op:

LHA-7 USS TRIPOLI JON: 38DJA65404 AOl

TITLE:

Hot Water Accumulator Tank (PW-TK-0008); temporary repair and preserve

1.1.3 Coordinate the off-loading or transferring of each fluid through the ship's Damage Control Assistant (DCA), via SEIPSUPT, to maintain ship's stability and to prevent flooding.

(V) (G) "VISUAL INSPECTION"

1.2 Inspect each tank, void and/or cofferdam for cleanliness, prior to final closing. Document the personnel who were present during the inspection and confirm that they have exited the space prior to closure of each tank, void, and cofferdam. Designate one person to account for personnel who may have entered the space. -S130

1.2.1 Install each manhole cover for each tank, using each new gasket and fastener.

2. NOTES:

2.1 Booklet of General Plans and Tank Sounding Tables are available for review at the office of the SUPERVISOR.

2.2 The SUPERVISOR will provide a waste liquid conveyance to accumulate waste liquids in each tank for work being accomplished for SRF-JRMC availabilities.

2.3 See additional CHT/sewage tanks disinfection requirements of Local Standard Item 099-901Y0 for SRF-JRMC Sasebo availabilities.

ENCLOSURE (T) 2/2

38DJA65404-AOI

CU'

ENGINEERING LIAISON MEMORANDUM

SRF-.JRMC SASEBO 1ISTRIBUTION STATEMENT C Distribution authorized to U.S. Oovzremont

JAPAN gzeorrs end their 000troclors; Cniticel Toohoologv; /1/30/2020). Other U.S.

quests for this document shell ho eaforood so U.S. Novel Ship Rope/v Fecility nd Japan Regional Mniotonance Center, Smtho, Japan.

1. ItULL NO. I SHIP NAME I TITLE . ELM NO. REV I. ICN/KO . ESR NO.

LHA-7 / USS TRIPOLI

HOT WATER ACCUMMIJLATOR TANK TEMP

REPAIR .

265075 - I 38DJA65404-AO1 LHA7-0083

SCI)

. DFS REQUIRED

NA NA

. SWBS . ADDITIONAL APPLICABILITY:r Not Applicable

10. APPROVAL

Originator ate eviewer ate

S. HATA 1/30/26

Project Support Engineer ale

E .A.1K.1.JITA AO.1534833009

245 Design Branch Head ate

C. R. HADNOT OPHERR2 1/30/26

.240 LTA ate

NA

ale

NA

Ill. CORRECTIVE ACTION

1. REFERENCE:

a. ESR LHA7-0083, ACCUMULATOR (PW-TK-0008); TEMPORARY REPAIR AND

PRESERVE

b. 123-6125870 REV-H, 500 GL HOT WATER ACCUMULATOR TANK

c. 533-756630 1 REV-F, POTABLE WATER PP SYSTEM DIAGRAM

2. ENCLOSURE:

(1) None.

3. BACKGROUND:

a. SRF-JIRMC Sasebo has been tasked to repair a pin hole leak on Hot Water Accumulator Tank

(PW-TK-0008) located in Laundry Water Heater Room (4-73-1-Q).

b. The pin hole is located at the Elliptical Head (lower side head) of the accumulator tank.

c. Planning yard does not have ordering information for the tank. Therefore ref. (a) asks SRF-JRMC

Sasebo Code S245 to provide repair procedure for the tank and testing requirements.

4. GENERAL NOTES:

a. The purpose of this ELM is to provide repair plan for the accumulator tank (PW-TK-0008).

b. Template all work from ship and existing equipment.

c. All burrs and sharp edges shall be removed to prevent damage to equipment or injury personnel.

5. REOUIRED ACTIONS:

a. Repair accumulator tank (PW-TK-0008) by build-up welding as follows.

ELM 265075 CU! 1 of2 ifq

38 DJA65404-AO 1

b. Conduct PT to identify the extent of the pin hole. Grind down and clean the area to be inspected.

c. Conduct build-up weld in accordance with NAVSEA S9074-AR-GIB-010/278, paragraph 10-3.5.

Weld class is A-4.

d. Conduct 5X VT of repair area in accordance with NAVSEA T9074-AS-GIB-0 10/271.

6. TEST NOTES:

a. Strength test: The new or modified piping shall be hydrostatically pressurized to the listed pressure for time specified prior to and during inspection. -

System Test fluid Test pressure Time Potable hot Water Fresh water 176(+4/-O) psig 30 minutes Acceptance criteria: No leakage or permanent deformation allowed.

Note: These systems are reduced energy systems (500 psig or less and 200 degrees F or less). A tightness test at normal system operating pressure is preferred as a substitute for the strength test shown above, provided the requirements of S9086-RK-STM-010/CH-505, paragraph 505-1 1.1.2.6, are met.

b. Tightness test: The weld joint shall be inspected while subjected to normal system operation conditions. No leakage is allowed.

c. Operational test: after satisfactory completion of strength and tightness tests, the system shall be tested at normal operation pressure and temperature for proper operation and without leaking.

7. MATERIALS:

NONE

ELM265075 CU! 2of2

38DJA65404-AO 1

ENGINEERING LIAISON MEMORANDUM

SRF-JRMC SASEBO ISTRS3UTION STATEMI/NT C: Diattihation authotizad to U.S. Government

F0nttni05 and heir contractors; Critical Tnclatologv; (8/15/202)), Other U.S.

nquratn for thin docarnent shall ha rrfnnad to US. Navel Ship Rapair Facility nd Japan Regional Maintenance Centre, Sasrhn, Japan.

1. DULL NO. / SHIP NAME I TITLE . ELM NO. 3. REV 4. ICN/KO ESR NO.

POTABLE WATER SYSTEM PURITY

CERTIFICATION

255141 - I I

SCD DFS REQUIRED

NA see para 4.b I

SWBS . ADDITIONAL APPLICABILITY:

533 ALL SASEBO SHIPS / CRAFTS

10. APPROVAL

Originator ate leviewer ate

T at A mCrUO MATSUO.DANIE egsseaararcr 1 8/15/25L.T.1232040579

'roject Support Enganeer ate

T }TVTQ HAVENS.JACOB.R. n5080oorarr J. ±'4 a) ioror1506349474

245 Design Branch Head 'ate

C. R. HADNOT HADNOT.CHRISTOPHE sonaresrarar 8/15/25

200 I LTA 'ate 5 TOT TZTS A C55TT olgtallyetgnadby

3. VV. .E's..1.ttE, I O,[1_ BULLrtR0JtiaGELlNE.M.1386323700 BSLLARD.dJdGELINE.M.1380323760 3 25Sat.: 2025.082311:53,18 a0000'

1. CORRECTIVE

REFERENCE:

a. 59086-SE-SRM-010/533 Rev-4, NSTM CHAPTER 533 POTABLE WATER SYSTEMS

b. NAVMED P-50 10-5 Rev-7, Water Quality for Shore Installations

c. US CFR 40 Part 141, National Primary Drinking Water Regulations

d. Ministry of Health Labor and Welfare Japan - Waterworks Act

e. NAVSEA STD ITEM 009-87 FY25, Chemical Disinfection Procedure; Accomplish

f. S9AAO-ANB-GOS-010/GSO Rev-il, GENERAL SPECifICATIONS FOR OVERHAUL OF

SURFACE SHIPS GSO

2. ENCLOSURE:

(1) Comparison of Japan and US Water Quality Standards

(2) Email correspondence from ISEA, Subject: Potable Water Testing Requirements for USN Ships

3. BACKGROUND:

a. Reference (a) was recently revised, with new requirements for Potable Water Purity Certification.

The requirement states that upon completion of sanitization process, a certificate shall be obtained from a licensed or Government laboratory attesting that the water is safe for human consumption.

The certificate shall indicate water meets or exceeds the requirements of ref (b). However, ref (b) does not specifically address shipboard post repair water quality test requirements.

ELM255141 CUI lof 2 70' //7

38DJA65404-AO1

CU!

b. Potable Water ISEA, NSWC-PD Code 413, was contacted to provide clarification of Purity

Certification requirements on O2FEB 2025 and confirmed the following:

(1) Navy considers shipboard potable water systems as Public Water System (PWS) with regards to Safe Drinking Water Act (SDWA) of reference (c).

(2) U.S. Environmental Protection Agency (EPA) or state certified laboratory will test and determine if water is Fit For Human Consumption (FFHC)

c. There are no EPA certified labs in Japan and shipping water samples to CONUS for testing would exceed the 30-hour maximum sample hold time, so NAVFAC Sasebo was contacted on 06FEB2025 to inquire how determination for FFHC is done on Commander Fleet Activity Sasebo water systems. Their response was although they do additional testing besides bacteria, the determination for FFHC is owned by the Installation Commander so they do not require the use of an EPA certified laboratory.

d. SRF-JRMC CHENG was briefed on the above issues and is engaging with NAVSEA to get clarity.

In the interim, SRF-JRMC CHENG concurred with recommendation of SRF-JRMC Det. Sasebo S245 Design Engineering Branch to test water to Ministry of Health and Labor Welfare of Japan (MHLWJ) drinking water quality standards of reference (d), using a Japanese certified laboratory since it meets the intent of reference (c) EPA requirements. See enclosure (1) for comparison between EPA and MHLWJ drinking water quality Maximum Contaminant Level (MCL) criteria.

e. English translated website of MHLWJ provides background and links to criteria for MCL (https ://www.mhlw. go.jp/english/policy/health/water_supply/4 .html). Note that the English website is not up to date as far as list of contaminants and MCL. Enclosure (1) provides a consolidated list based on updated requirements from the MHLWJ Japanese website.

4. GENERAL NOTES:

a. The purpose of this ELM is to provide interim guidance for accomplishment of Potable Water

Purity Certification requirements per reference (a).

b. NST 009-87 requirement for certification that water is safe for human consumption is to be changed to meet requirements of reference (a), per email response from ISEA, see enclosure (2).

c. Until SRF-JRMC CHENG obtains clarification from NAVSEA on the requirement to test to reference (c) criteria, there is no non-conformance at this time. No DFS required to perform additional testing to Japanese water quality standards above current bacteriological and chlorine FAC testing.

d. The guidance of this ELM is applicable to all Sasebo homeported ships and combatant craft potable water systems for both Tn-House and Farmout work.

5. REQUIRED ACTIONS:

a. The testing requirements of Potable Water Purity Certification per reference (a) will be met by accomplishment of the following:

(1) Certification testing performed by Japanese laboratory certified by prefecture for measurement of drinking water quality.

(2) Contaminants and associated MCL criteria in accordance with Japan Water Works Act for

Drinking Water Quality Standard (51 items) and Complementary Items (27 items), enclosure

(1) refers.

(3) Certification to be provided by Japanese certified laboratory attesting that water meets Japan Drinking Water Quality Standards and Complementary Items.

ELM255141 CU! 2of2

38 DJA65404-AO 1

Comparison of Japan and US Water Quality Standards

# Contaminant EPA mg/L Comp MHLW

MHLW

Category

(4S, 4aS, 8aR) -Octahydro -4,8a -

Dimethylenaphtalene-4a (2H) -ol (Alias:

Geosmin)

0.0000lmglL DWQS 2 Alachlor 0.002

3 Alpha particles 15 picocuries per Liter (pCi/L)

4 Aluminium O.lmg/L COMPLEMENT

5 Anionic surface active agent

0.2mg/L DWQS 6 Antimony

0.006

< 0.02mgIL COMPLEMENT

7 Arsenic

0.010 as of 01/23/06 = 0.olmglL DWQS

8 Asbestos (fiber> 10 micrometers) 7 MEL

9 Atrazine 0.003

10 Barium 2

11 Benzene 0.005

< 0.olmg/L DWQS 12 Benzo(a)pyrene (PAHs) 0.0002

13 Beryllium 0.004

14 Beta particles and photon emitters 4 millirems per year

15 Boron

1.Omg/L DWQS 16 Bromate

0.01

= 0.olmglL DWQS 17 Bromodichloromethane 0.o3mg/L DWQS 18 Bromoform

0.o9mg/L DWQS 19 Cadmium

0:005

> 0.003mg/L DWQS 20 Calcium, Magnesium (Hardness) 100mgIL COMPLEMENT

21 Carbofuran

0 04

22 Carbon tetrachloride 0.005

> 0.002mg/L

DWQS

23 Causticity (Langelier's Index) -1'0 COMPLEMENT

24 Chlorate

0.6mg/L DWQS 25 Chlorate hydrate

0.02m/L(P) COMPLEMENT

26 Chlordane

0.002

27 Chloride ion

200mg/L

DWQS

28 Chlorine dioxide

MRDLO.81

> O.6mg/L COMPLEMENT

29 Chlorine residue MRDL4.01 lmglL COMPLEMENT

30 Chlorite 1

> 0.6mgIL COMPLEMENT

31 Chloroacetic acid 0.02mg/L DWQS 32 Chlorobenzene 0 1

33 Chloroform

0.06mg/L

DWQS

34 Chromium (total) 0.1 > .02mg/L DWQS 35 cis -1,2-Dichloroethylene 0.07 > 0.04mg/L DWQS 36 Color

5 degree DWQS 37 Common Bacteria (EPA: Total Coliforms) 5.0% < 100 per 1 ml DWQS

38 Copper 117; Action Level=1.3 > 1.omg/L DWQS

ELM 255141 CUI Enclosure (1) ///

CU!

# Contaminant EPA mg/L Comp MHLW

MHLW

Category

39 Cyanide (as free cyanide) 0.2

40 Cyanide ion and Cyanogens chloride

0.Ulmg!L DWQS 41 D-2,4 0.07

42 Dalapon 0.2

43 Di(2-ethythexyl) adipate 0.4

44 Di(2-ethylhexyl) phthalate 0.006

< 0.08mg/L

COMPLEMENT

45 Dibromo-3-chLoropropane (DBCP) - 1,2 0.0002

46 Dibromochloromethane 0.lmg/L DWQS 47 Dichloroacetic acid

0.03mg/L DWQS 48 Dichioroacetonitrile

0.olmg/L(P) COMPLEMENT

49 Dichloroethane - 1,2

0.005

> 0.oo4mg/L COMPLEMENT

50 Dichloroethylene - 1,1 0.007 < 0.lmg/L COMPLEMENT

51 Dichloromethane 0.005 < 0.02mg/L DWQS 52 Dichloropropane - 1,2 0.005

53 Dinoseb 0.007

54 dioxane - 1,4

0.o5mg/L DWQS 55 Dioxin (2,3,7,8 -TCDD)

0.00000003

56 Diquat 0.02

57 E. coli (EPA: Total CoUforms) 5.0%

Not to be detected

DWQS

58 Endothall 0.1

59 Endrin 0.002

60 Ethylbenzene 0.7

61 Ethylene dibromide 0.00005

62 Fluoride 4 >

0.8mgIL

DWQS

63 Formaldehyde 0.08mg/L DWQS 64 Free carbon dioxide

20mg1L COMPLEMENT

65 Glyphosate

0.7

66 Haloacetic acids (HAAS) 0.06

67 Heptachlor 0.0004

68 Heptachlorepoxide 0.0002

69 heterotrophic bacteria

2000 per I rnl(P)

COMPLEMENT

70 Hexachlorobenzene 0.001

71 Hexachlorocyclopentadiene 0.05

HFPO-DA (commonly knowns as GenX Chemicals) 0.00001

73 Iron

0.3mg/L

DWQS

74 Lindane

0.0002

75 Manganese 0 0lmg/L

COMPLEMENT

76 Mercury

0.002

> 0.0005mg/L DWQS 77 Methoxychlor 0.04

78 Methyl-t-butylether (MTBE)

0 .02rng/L

CO M PLEM ENT

79 Nickel

0.02mg/L COMPLEMENT 80 Nitrate (measured as Nitrogen)

= lOmg/L DWQS

ELM255141 CU! Enclosure (1)

380JA65404.-AO1

# Contaminant EPA mg/L Comp MHLW

MHLW

Category

81 Nitrite (measured as Nitrogen) 1 > 0.04mg/L DWQS 82 Nonionic surface active agent 0.o2mg/L DWQS 83 o -Dichlorobenzene

0.6

84 Odor/Taste

Notabnormal

DWQS

Organic substances (Potassium permanganate consumption)

3mg/L COMPLEMENT

Organic substances (Total Organic Carbon) (Note 2)

3mg/L DWQS 87 Oxamyl (Vydate)

0.2

88 p-Dichlorobenzene 0.075

89 Pentachlorophenot 0.001

90 Pesticides I COMPLEMENT

91 PFHxS

0.00001

92 PFNA 0.00001

93 PFOA 0.000004

0.00005mg/L(P)

COMPLEMENT

94 PFOS 0.000004 < 0.00005mglL(P) COMPLEMENT 95 pHValue 5.8-8.6 DWQS

96 Phenols

0.005mg/L in terms of Phenol DWQS

97 Picloram

0.5

98 Polychlorinated biphenyls (PCBs) 0.0005

99 Radium 226 and Radium 228 (combined) 5 pCi/L

100 Selenium 0.05

0.olmg/L

DWQS

101 Simazine 0.004

102 Sodium

200mg/L

DWQS

103 Styrene

104 Tetrachloroethylene I

0.005 < 0.olmg/L DWQS

Tetramethylbicyclo[2,2, 1]Heptane-2-ol (Alias: 2- MethylisoboLneol) - 1,2,7,7 0.0000lmg/L DWQS

106 Thallium I

0.002

107 Threshold Odor Number

3TON

COMPLEMENT

108 Toluene

> O.4mg/L COMPLEMENT

109 Total residue

30-200mg!L COMPLEMENT 110 TotalTrihalomethanes (TTHM5) 0.08

< 0.lmg/L DWQS 111 Toxaphene 0.003

112 TP (Silvex) - 2,4,5 0.05

113 trans-1,2-Dichloroethylene 0.1

114 Trichloloethane-I,I,1 0.2

0.3mg/L

COMPLEMENT

115 Trichloroacetic acid 0.03mg/L DWQS 116 Trichlorobenzene - 1,2,4

0.07

117 Trichloroethane - 1,1,2 0.005

118 lrichloroethylene 0.005

0.olmg/L

DWQS

119 Turbidity TT3 > idegree COMPLEMENT

120 Uranium 30 ug/L as of 12/08/03 > 0.002mg/L(P) COMPLEMENT

ELM 255141 Enclosure (1)

38 DJA65404 -AO 1

cU

# Contaminant EPA mg/L j J

Comp MHLW

MHLW

Category

121 Vinyl chloride 0.002

122 Xylenes (total) iqJ 123 Zinc

1.omg/L DWQS

ELM 255141 CUI Enclosure (1)

38 0JA65404-AO 1

From: Grippe. Joseph J Jr CIV USN NSWCDIV PHL PA (USA) joseph.j.grippe6.civ@us.navy.mil> Sent: Tuesday, May 27, 2025 Ii 12 PM To: Con, William E III CIV USN NAVSHIPYD NORFOLK VA (USA) <william.e.conl.civus.navy.mil>: Crosland, Nicholas C (Nick) CIV USN SRF YOKOSUKA (USA) <nicholas,c.crosland.civ@us.navy.niil>: Carotenuto, Anthony J CIV USN NAVMCPUBHLTHCEN PORS (USA) <anthony .j carotenuto.civ@health.mil>; N SWCPD-PotableWater <NSWCPD-PotableWater@us.navy mu> Cc: Gillooly, Paul B CIV USN NAVMCPUBHLTHCEN PORS (USA) <paul.b.giIlooly.civhealth.mil>; Damell, Brett A CTR (USA) <bretta.damell.ctr@health.mil>; Matsuo, Daniel T CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civus.navy.miI>; Hadnot, Christopher R CIV USN NAVSHIPREPFAC SAS JA (USA) <christopher.r.hadnot.civftjus.navy.mil>; Phillips, Shaun P CIV USN COMFLEACT SASEBO JA (USA) <shaun.pphil1ipsciv@us.navy.mil>; Colantonio, Kyle A (C240C) CIV USN SRF YOKOSUXA (USA) <kyle.a.colantonio,civus.navy.mil>; Lum, Daniel C (C240A) CIV USN SRF YOKOSUKA (USA) <daniel.c.1um2.civ@us.navy.mil>; Teufel, Adam R CIV USN NAVSHIPYD NORFOLK VA (USA) <adam.r.teufel.civ@us,navy.mil>; Munch, Jacob J Jr CIV USN SEA 05 (USA) <jacob.j.munch2.civ@us.navy.mil>; Worris, Matthew R CIV USN SEA 05 (USA) <matthew.r.worris.civus.navy.miI>; Rossi, Giuseppe E CIV USN SEA 05 (USA) <giuseppe.e.rossi.civ@us.navy.mil>; Modglin, Joseph Shane LCDR USN BUMED FCH VA (USA) <joseph.s.modglin.milPjhealth.mil> Subject: Re: Potable Water Testing Requirements for USN Ships

Mr. Crosland, Adding in NAVSEA 05Z41, as well as NAVSEA BUMED Liaison

I do not have a direct answer to your question, but agree with the, "multitude of document" statement. I would add that some even have differing requirements. We are working to clean these up, and in the interim I wanted to give you a bit of background as well as current actions being taken regarding this subject. One thing to note, is the statements used in GSO, NSTM, and NAVMED (ch 5) documents all similar to: declaring fit for human consumption. From my understanding and recent conversations this declarationlstatement is currently being done shore side by base commanders after testing and advisement from the health community on the testing results (someone please correct me if I am wrong or understating something critical). The afloat side lacks that similar process at present.

GSO has had a requirement for testing after availabilities (S9AAO-AB-GOS-010 532p. April 2016 version below, this statement is reflected in Revision 11,2022 version as well)

Potable water purity certification - After completion of the potable water svsteni disinfecting process. a certificate shall be obtained from a licensed or Government laboratory attesting that the water is safe for human consumption. This certificate shall indicate that the wa meets or exceeds the requirements of the Manriai of Naval Preventative Medicine. NXVMED P -SO 1 0-3. Chapter 5.

NSTM Chapter 533 (S9086-SE-STM-010/533 R 4) was recently published (14 March 2025). This update was intended in part to clean up the various document and outline clearly what the requirements are for potable water system sanitization and testing. This update matches or exceeds the GSO requirements and aligns more closely to commercial standards for similar equipment (AWWA). See section 3.

NAVSEA Standard Item change proposal has been submitted to the SSRAC to remove the BUIvIED reference in 009-87, replacing with the NSTM Chapter 533 reference.

Joe Grippe

NSWCPD C. 413

In-Service Engineering Agent Potable and Freshwater Technical Specialist joseph.j.grippe6.civ@us,navy.mil Desk: 215.897.8628 Cell: 215.964.5172

From: Crosland, Nicholas C (Nick) CIV USN SRF YOKOSUKA (USA) <nicholasc.crosland.civ@us.na.miI> Sent: Tuesday, May 27, 2025 2:06 AM To: Carotenuto, Anthony J CIV USN NAVMCPUBHLTHCEN PORS (USA) <anthony.j.carotenuto.civhealth.mil>; Grippe, Joseph J Jr CIV USN NSWCDIV PHL PA (USA) <joseph.j.grippe6.civus.navy.mil>; NSWCPD-PotableWater <NSWCPD.PotableWater@us.navy.mil> Cc: Corl, William E III CIV USN NAVSHIPYD NORFOLK VA (USA) <william,e.corl.civ@us.navy.mil>; Gillooly, Paul B CIV USN NAVMCPUBHLTHCEN PORS (USA) <paul.b.gillooly.civ@health.mil>; Darnell, Brett A CTR (USA) <brett.a.darnell.ctr@health.mil>; Matsuo, Daniel T CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civus.navy,miI>, Hadnot, Christopher R CIV USN NAVSHIPREPFAC SAS JA (USA) <christopher.r.hadnot civ@us.navy.mil>; Phillips, Shaun P CIV USN COMFLEACT SASEBO JA (USA) <shaun,p.phillips.civus.navy.mil>;

Colantonio, Kyle A (C240C) CIV USN SRF YOKOSUKA (USA) <kyIe.a.colantonio.civus.navy.mil>; Lum, Daniel C (C240A) CIV USN SRF YOKOSUKA (USA) <daniel.c.lum2.civus.navy.miI> Subject: RE: Potable Water Testing Requirements for USN Ships

Mr. Grippe! Mr. Carotenuto / NSWCPD Potable Water Team, Appreciate you and your teams help to answer our question

BLUF: When a REPAIR Facility performs work on USN ship (while OCONUS) that affects the Potable Water System. What is the correct testing requirements we (as the REPAIR Facility) should be doing to return the system as safe for ships force use. We have pulled a multitude of documents across multiple Regional Maintenance Centers (RMCs) and the vast majority only perform halogen (chlorine) residual test and bacteriological test, as outlined in NAVSEA Standard Item (NSI) 009-087.

(Q) Is this correct! sufficient? Or should we also be testing to the SDWA NPDWR requirements for contaminants? If we should be, are there any authorized laboratories OCONUS we can utilize?

Thank You, Nick Crosland Waterfront Chief Engineer, Code 240 SRF-JRMC Yokosuka, Japan DSN: 243-4278 (from US: 011-81-46-816-4278)

ELM 255141 CU! Enclosure (2)

Cell: 070-8785-9391 (from US: 011-81-70-8785-9391) Email. nicholas.c.crosland.civ@us.navy.mil SIPR: Nicholas.cros1andfe.navy.smil.mil

CU'

From: Carotenuto, Anthony J CIV USN NAVMCPUBHLTHCEN PORS (USA) <anthony.j.carotenuto.civ@health mil> Sent: Tuesday, May 20, 2025 4:01 AM To: Crosland, Nicholas C (Nick) CIV USN SRF YOKOSUKA (USA) <nicholas.c.crosland.civus.navy.mil> Cc: Con, William E Ill CIV USN NAVSHIPYD NORFOLK VA (USA) <william.e.corl.civ@us.navy.mil>; Gillooly, Paul B CIV USN NAVMCPUBHLTHCEN PORS (USA) <paul.b.gilloo1y.civhealth.mil>; Damell, Brett A CTR (USA) <brett adamell.ctr@health.mil>; Grippe, Joseph

Jr CIV USN NSWCDIV PHL PA (USA) <joseph.j.grippe6.civ@us navy.mil> Subject: Potable Water Testing Requirements for USN Ships

Sir;

We appreciate you reaching out to NAVSEA and us at NMCFHPC for clarification regarding water testing protocols for determining shipboard potable water systems fit for human consumption post-shipyard maintenance prior to taming the system over to ship's company. We are concerned regarding potential system contamination from chemicals and/or processes that may be used during repairs, cleaning, or within associated water systems as these constituents may not be included in standard Safe Drinking Water Act (SDWA) National Primary Drinking Water Regulations (NPDWR) testing protocols. We have reached out to Joe Grippe (NSWC-Philadelphia) for additional clarification on the testing requirements but have not received a response yet.

NAVSEA has authorized laboratories in many areas to conduct standard SDWA NPDWR sampling/testing. Any additional potential contaminants outside of the standard NPDWR list would necessitate a more comprehensive evaluation and consultation with NAVSEA Laboratory Authorities to determine appropriate testing methodologies.

We look forward to your reply and are committed to assisting you in ensuring the safety and quality of potable water systems.

Very respectfully, Mr. Anthony J. Carotenuto, USN (RET) Navy & Marine Corps Force Health Protection Command Environmental Programs Directorate Drinking Water Division Supervisor Food & Water Risk Assessments Navy Coordinator Desk: 757.953.0712 Perferred Cell: 757.630.1040 (Whatsapp for OCONUS) Work Cell: 757.274.1868

NEW WATER PAGE:

Progranis/Drmkmg-Water-Programs/

Z5O

/7/ELM 255141 CUt Enclosure (2) /1/7

File details come from the government source that posted it. Updated .