This document is a Job Specification and accompanying test procedure for anchor and anchor chain assembly inspection, preservation, and load testing on the USS PATRIOT (MCM-7), a naval vessel under repair at SRF-JRMC Sasebo, Japan.

The work involves disassembly, inspection, cleaning, lubrication, and reassembly of one chain stopper assembly located on the forecastle deck, consisting of a pelican hook, turnbuckle, detachable link, and shackle. Key requirements include recording permeability test results for metallic materials; measuring and recording installation lengths for adjustment purposes; changing existing detachable links from three to two each where required; removing paint coating for load testing; replacing existing hairpins with new CRES hairpins; installing new tapered pins; lubricating turnbuckle assemblies and detachable links with sea water wash-resistant grease (CID A-A-50433); and preserving new surfaces to match surrounding areas. The work has a production completion date of June 30, 2026, with a POP start date of May 23, 2026. The associated load test procedure specifies applying a test load of 211,500 to 222,075 pounds for 15 seconds to the chain stopper assembly, with acceptance criteria requiring no rupture or surface cracks before or after loading. Government-furnished materials include bars, plugs, wire, grease, tapered pins, and a new K-Monel turnbuckle assembly. All work must use only non-magnetic materials and must be completed in accordance with referenced naval standards, specifications, and engineering liaison memoranda (ELM-255094A) addressing required inspections, material substitutions, and proof test requirements.

View the file

Other files

File Type Posted
2.01 SF30 26Q03120001.pdf PDF
1.02 REVSPEC 3807G58201R_06_A07.pdf PDF
2.01 SF18 26Q0312.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shio/HULL NO. Shio/HULL NAME

JON: I ICN:3807G58201 'R

Rev:

MCM-7 USS PATRIOT 06

TITLE: Anchor and Anchor Chain Assembly; inspect and preserve

Rev-6(FOA)~Chain Stopper Assembly; load test

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date:

s/ 2~/ .J-0~ 1., 6/ JD/ ~~b POP Start Date: POP End Date:

r/!>.1/~~, <t/ Jt,/ ~ ~t

PREPARED BY: CODE

N.MATSUYA l(H NO) H MA APPROVED BY: s,M CODE

S.MURAKAMI S225

CONCURRED BY:

S.Y

CODE

S.MOROOKA S231

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

PREPARING ACTIVITY:

SASEBO

DATE

5/5/2026

USE ONLY NON-MAGNETIC MATERIALS

DESCRIPTION:

JSN(S}: OD01-ZA66 CASREP#

S/F CONTACT: CIV

CCNS#

Approved by S300/S900A S 4,1, cir,.- / h Date: 71'3/ ,1- r':;2 ; Avl: 5C1

LWC:

Work Completed

S/Force: Rate: Date:

Ship Supt: Date: SRF CONTROL NO.: I JO / d 6 J I J 0

WORK CERTIFICATION SIGNATURES

Key Op:

A07

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Ship/HULL NO. Ship/HULL NAME ICN:

MCM-7 USS PATRIOT

JON: 3807G58201R

TITLE: Anchor and Anchor Chain Assembly; inspect and preserve

Rev-6(FOA)~Chain Stopper Assembly; load test

1. SCOPE:

! Rev:

I os

1.1 Title: Anchor and Anchor Chain Assembly; inspect and preserve Rev-6(FOA)~Chain Stopper Assembly; load test

1. 2 Location of Work:

1.2.1 Forecastle Deck

1. 3 Identification:

Key Op:

A07

1.3.1 Quantity (One AY), Chain Stopper Assembly (Consisting of Pelican Hook, Turnbuckle, Detachable Link, and Shackle), Located in

1. 2 .1

2 . REFERENCES:

2 .1 Standard Items (FY25)

2.2 S9086-TV-STM-010/CH-581/Rev 4, Anchoring

2.3 581-6135415 Rev A, Anchor Handling Arrangement and Details

2.4 803-921790 Rev H, Links, Detachable High Strength

2.5 804-860000 Rev G, Chain Stoppers for 3/4 to 4-3/4 Anchor Chain Assembly and Details

2.6 T.P. No.: 58111-1-100 260578, Anchor Chain Stopper Assembly - Load Test (Enclosed)

2.7 ELM-255094A, Anchor, Anchor Chain and Chain Appendages; Repair (Enclosed)

2.8 T9074-AS-GIB-010/271 Rev 1, Requirements for Nondestructive Testing Methods

2.9 MIL-STD-2035A, Nondestructive Testing Acceptance Criteria

3. REQUIREMENTS:

3.1 Record a permeability test result for the existing and new metallic material, using the SRF YOKOSUKA 4121/1.

3.2 Separate each chain stopper assembly listed in 1.3.1 by disassembling each detachable link, using 2.2 through 2.5 for guidance.

3.2.1 Measure and record each installation length from ship for the adjustment length of each chain stopper assembly.

Ship/HULL NO. Ship/HULL NAME I ICN: Rev: Key Op:

JON: I 3807G58201 I<. MCM-7 USS PATRIOT

TITLE: Anchor and Anchor Chain Assembly; Inspect and preserve

Rev-6(FOA)-Chain Stopper Assembly; load test

06 A07

3.2.1.1 Each new locking plate and cotter pin on the

turnbuckle assembly must not be removed for the adjustment length of chain stopper assembly.

3.2.1.2 Each quantity of existing detachable link must be

changed from 3 each to 2 each when required.

(V) "RE PORT"

3.2.1.3 Submit one legible copy of a report listing results

of the requirement of 3.2.1 to SUPERVISOR including quantity of installed detachable links.

3.2.2 Record each identification marking number of each detachable link.

3.2.3 Remove paint coating from each chain stopper assembly listed in 1.3.1 for load test including Nondestructive Testing (NOT).

3.3 Assemble each chain stopper assembly listed in 1.3.1, using requirement result of 3.2.1.3, 2.2 through 2.5 for guidance.

3.3.1 Clean, free up and lubricate each turnbuckle body including right-hand and left-hand threaded eye bolts with sea water wash resistant grease, CID A-A-50433, prior to installation.

3.3.2 Assemble each detachable link. Detachable link interior cavity and faying surfaces must be heavily lubricated with sea water wash resistant grease, CID A-A-50433, prior to final assembly.

3.3.3 Accomplish the requirements of paragraphs 581-6.2.1.5 and 581- 6-2.1.6 of 2.2 for each detachable link.

3.3.4 Install each new tapered pin in each detachable link in accordance with paragraph 581-6.2.1.4 and figure 581-6-4 of 2.2.

3.3.5 Remove each existing and install each new CRES hairpin in the outboard detachable links in accordance with paragraph 581-6.2.1.7 and figure 581-6-4 of 2.2.

(V) (G) "LOAD TEST"

3.3.6 Accomplish the requirements of 2.6 for the load test of each chain stopper assembly listed in 1.3.1, using TEST NOTE 6 of 2.7 for guidance.

-S246

(I) "PT INSPECTION"

3.3.7 Accomplish the NOT (PT) inspection of each equipment in accordance with TEST NOTE 6.a. (3) of 2.7 and Chapter 5 of 2.8. The acceptance· or reject criteria must be in accordance with Section 7 of 2.9 for each equipment. -Certified Contractor

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

JON: MCM-7 USS PATRIOT 3807G58201R._ 06 A07

TITLE: Anchor and Anchor Chain Assembly; inspect and preserve

Rev-6(FOA)~Chain Stopper Assembly; load test

(V) "REPORT"

3.3.7.1 Submit one legible copy of a report listing results

of the requirement of 3.3.7 to SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas, using 2.2 through 2.5 for guidance.

3.4.1 Each new turnbuckle assembly (Material: K-Monel) must be preserved.

3.5 Upon completion of the load test and preservation work, install each chain stopper assembly to ship, using 2.3 for guidance.

4. NOTES:

4.1 Modification initiated by condition report Serial No. SSK/008, SSK/010, and SSK/012 Date: 1/13/2026, 3/6/2026, and 4/6/2026 Contractor name:

SASEBO HEAVY INDUSTRIES CO., LTD.

4.1.1 ELM-255094A has been issued for additional proof test and NOT requirements of repaired chain stopper assembly.

4.1.2 An ordering information of new turnbuckle assembly has been determined by S245's official email response to ESR MCM7-546 on 1/20/2026 including proof test requirements of chain stopper assembly.

4.2 SRF Tool Room will issue permeability indicator, test weight, and dynamometer when required, except the weight for fine adjustment and sand bag.

4.3 The TEST NOTE 6.a. (2) for VT inspection of ELM-255094A will be covered by 2.6.

4.4 Each existing equipment is provided by ICN 3807G58201 A0l.

5. GOVERNMENT FURNISHED MATERIAL (GEM) :

5.1 Listed Government Furnished Material will be provided by ICN 3807G58201 A0l.

MATERIAL LIST

ITEM PC REF

M

STOCK HAZ DOC

NO. NO. NO. I DESCRIPTION

NUMBER MAT NO. C

001 M BAR, METAL, 1/2"OD CL-416 98 9510 N 22988022

001897385

002 M BAR, METAL, 3/4"OD CL-416 98 9510 N 22988023

001897425

003 M PLUG, LOCKING, DETACH, 1-1/4" LEAD 98 4030 N 22988095

002622066

QTY

REQD/

UNIT

10/FT

10/FT

30/EA

PARA

NO.

3.3

3.3

3.3

Robert.Sanderlin Cross-Out

Shio/HULL NO. Shio/HULL NAME ICN: I Rev:

MCM-7 USS PATRIOT

JON: 3807G58201.k.. I 06

TITLE: Anchor and Anchor Chain Assembly; inspect and preserve

Rev-6(FOA)-Chain Stopper Assembly; load test

MATERIAL LIST

M

Key Op:

A07

QTY

ITEM PC REF STOCK HAZ DOC PARA

NO. NO. NO.

I DESCRIPTION

NUMBER MAT NO.

REQD/

NO.

C UNIT

004 M PLUG, LOCKING, DETACH, 1-3/8 LEAD 984030 N 22988094 10/EA -

002622067

005 M PLUG, LOCKING, DETACH, 1-3/4" LEAD 98 4030 N 22988093 5/EA -

002622070

006 M WIRE, NONELECTRICAL, 1/8"OD CL-304 98 9505 N 22988020 20/FT 3.3

001890574

007 M GREASE, W-W.RESISTAN, 35LBS/CN 98 9150 y 1/CN 3.3 013069167

008 M PIN, TAPERED, PLAIN, FOR 1-1/4" 98 5315 N 22988097 20/EA 3.3

DETACHABLE LINK CL-416 002613182

907 M TURNBUCKLE ASSEMBLY, 98 5340 N 6022E500 1/AY 3.3 SIZE: 1-1/4 INCHES HS !HIGH STRENGTH! SA2600236

CUI

SHIP/HULL NO.: USS PATRIOT/ MCM-7 ! '

---------------------1JON: ICN: ! Rev:

T.P FILE NO.: 58111-1-100_260578 ! 3807G58201 ~ I 06

Key Op:

A07 Page 1 of 6

SHIP REPAIR FACILITY - JAPAN REGIONAL MAINTENANCE CENTER DET ;[ ,~

SASEBOTESTPROCEDURE ' ,..

TITLE: JCN:

OD01-ZA66

ANCHOR CHAIN STOPPER ASSEMBLY - LOAD TEST CWP:

N/A

TEST PROCEDURE PREPARATION

PRINT NAME & SIGNATURE PHONE CODE DATE

PREPARED BY KU BO. DAl.159499 Digitally signed by

D. KUBO KUBO.DAl.1594993841 252-8052 S246E 23-Jan-2026 3841 Date: 2026.01 .23 08:34:23 +09'00'

REVIEWED BY IIDA.SHUNICHl.1 Digitally st(Jned by

S. IIDA IIDA.SHUNICHI . 1274619127 252-8045 S246A 23-Jan-2026 274619127 Date: 2026.01 .23 08:44:19 +09'00'

APPROVED FOR ISSUE YOSHIKAWA.SRI Digitally signed by

B. YOSHIKAWA

YOSHIKAWA.BRIAN.T. 1262691449 252-8050 S246CTE 26-Jan-2026 AN.T.1282691449 Date: 2026.01 .2609:16:24+09'00'

PROCEDURE COMPLETED

PRINT NAME & SIGNATURE ORGANIZATION BADGE/RANK DATE

LWC

S246

SRF-JRMC

DET SASEBO

CERTIFICATION REVIEW AND APPROVAL OF TEST RESULTS

PRINT NAME & SIGNATURE PHONE CODE DATE

REVIEWED BY (Test Certified Complete and Test Results Satisfactory) 252-8045 S246A

S. IIDA

TEST CODE (Test Results Reviewed and Approved)

S246CTE

COMMENTS:

SHIP/HULL NO.: USS PATRIOT/ MCM-7

JON: ! ICN: Rev: Key Op:

T.P FILE NO. : 58111-1-100_260578 I 3807G58201k 06 A07 Page 2 of 6

TEST PROCEDURE GENERAL NOTES

1. TEST SEQUENCE: Unless otherwise specified in the test document, this test procedure (TP) shall be completed in provided order.

2. VERIFICATION: The person designated to sign for an action verifies, based on personal observation , objective evidence, or watch stander reports and certifies by signature that the action has been performed in accordance with the specified requirements .

3. USE ORIGINAL DOCUMENTS: All data attached to the Master TP shall have original pen and ink entries on the data sheets (unless otherwise specified in the test procedure).

4. USE DARK INK: All signature and data shall be in dark, water insoluble ink.

5. CORRECTIONS: When an error was made, it shall be corrected by drawing a single line through the error, recording the correct entry, initialing, dating and printing the name of the person making the correction in accordance with JOINT FLEET MAINTENANCE MANUAL (JFMM), COMUSFL TFORCOMINST 4790.3, VOLUME

V, QUALITY MAINTENANCE.

6. LATEST APPLICABLE REVISION: Use the latest applicable revision of plans, instructions, technical manuals, and other reference material cited in this test procedure.

7. INSTRUMENT CALIBRATION: All measuring equipment shall be in current calibration as required by

NAVSHIPREPFACINST 4734.1.

8. OPERATION OF COMPONENTS: Only authorized personnel shall operate ship's permanently installed equipment.

The cognizant Shop shall control and operate their temporary test equipment. Ship's Force shall operate temporary systems and equipment formally turned over to the ship.

9. SAFETY INSTRUCTION: The Test Director is responsible for the safe conduct of this test. The safety precautions of NAVSHIPREPFAC M-5100.8 shall be observed at all times.

10. TEST STOPPAGE: The Test Director shall stop the test once a problem has been found in the system or equipment being tested . S246 Testing Standard Operating Procedure (SOP) shall be used to determine course of action prior to resuming the test procedure.

11. ENERGIZED EQUIPMENT: NSTM 300, para 300-2.4 shall be followed when working on energized equipment.

12. DATA COLLECTION: The test documents may require collection of additional data for which there is no acceptance criteria, provided the data sheet identifies that data is for information only.

13. SUPPLEMENTATION: When supplementation is made, annotate the supplemental information on the page with 'See Remarks' followed by a sequential numbering system corresponding in the Remarks section.

14. USE ASTERISK(*): When supplementation , correction and/or signature is made but there is not enough space, annotate using an asterisk (*) followed by sequential number adjacent to the portion then clarify on the same page using the same annotation.

SHIP/HULL NO. : USS PATRIOT/ MCM-7

j

JON: ! ICN: Rev: Key Op:

T.P FILE NO.: 58111-1-100_26057B I 3807G58201 'R 06 A07 Page 3 of 6

ANCHOR CHAIN STOPPER ASSEMBLY - LOAD TEST

1. PURPOSE

1-1 The purpose of this test is to certify the anchor chain stopper assembly after turnbuckle replacement by accomplishing the specified load test. See Table 1-1 and Figure 1-1 for item to be tested.

Table 1-1 : Test Item

Anchor chain stopper assembly Test Load: 211,500 - 222,075 pounds Test Duration: 15 seconds

WHEN 3 LINKS ARE REO'D, 2 LI NKS SHALL BE

FITTED AT THIS END OF ASSY.

Figure 1-1 : Anchor Chain Stopper Assembly

2. REFERENCES

2-1 SRF-JRMC DET SASEBO S245 ESR RESPONSE

2-1.1 ESR CONTROL NO. MCM7-546; ORDERING INFORMATION FOR TURNBUCKLE OF CHAIN STOPPER

ASSEMBLY

2-2 ELM - ENGINEERING LIAISON MEMORANDUM

2-2.1 255094; MCM-7 / USS PATRIOT ANCHOR, ANCHOR CHAIN AND CHAIN APPENDAGES; REPAIR

2-3 NAVSEA DRAWING

2-3.1 804-860000; CHAIN STOPPERS FOR 3/4 TO 4-3/4 ANCHOR CHAIN ASSEMBLY AND DETAILS

2-4 GSO-GENERAL SPECIFICATION FOR OVERHAUL OF SURFACE SHIPS: S9AA0-AB-GOS-010

2-4.1 SEC 092; SHIPBOARD TESTS

2-4.2 SEC 581 ; ANCHOR STOWAGE AND HANDLING

2-5 JFMM-JOINT FLEET MAINTENANCE MANUAL

2-6 NAVSHIPREPFAC M-5100.8: SAFETY AND HEALTH PROGRAM MANUAL

SHIP/HULL NO.: USS PATRIOT/ MCM-7 j j

---- --------------1 JON:

ICN:

Rev:

T.P FILE NO. : 58111-1-100_26057B 3807G58201 R 06

Key Op:

A07 Page 4 of 6

3. TEST AND SUPPORT EQUIPMENT/MATERIAL

3-1 Necessary Rigging Gear

3-2 Support Hoisting Device (e.g. Crane, Chain Hoist)

3-3 Load Applying Device (e.g. Test Weight, Hydraulic Jack)

3-4 Load Indicating Device (e.g. Dynamometer)

3-5 Stopwatch

3-6 Warning signs, ropes and/or barricades to ensure area affected by load testing is secured

4. GENERAL PRECAUTIONS

4-1 Only those personnel actively engaged in performing or witnessing this test shall be permitted in the testing area.

All specified safety regulations shall be strictly observed.

4-2 To prevent injury or death, ensure that proper test equipment is used during load testing.

4-3 Safeguarding of personnel and equipment shall be adhered to at all times.

5. TESTING STEPS

5-1 PRETEST BRIEFING Conduct a pre-test briefing (e.g., safety precaution , station assignments, testing steps) with all involved test personnel.

5-2 TMDE Record all Test, Measuring & Diagnostic Equipment (TMDE) type, range, serial number and calibration due date. TMDE shall be calibrated and has not expired. Record the data in TEST DATA SHEET.

5-3 LOAD TEST Conduct load test as follows and record data & result in the TEST DATA SHEET.

5-3.1 PRE-TEST INSPECTION Inspect the repaired chain stopper assembly.

5-3.2

Acceptance criteria: There shall be no rupture or surface crack

LOAD TEST

(1) Apply a 211 ,500 - 222,075 pounds test load to the assembly and hold the load for 15 seconds.

(2) After 15 seconds, slowly remove the test load and inspect the tested assembly.

Acceptance criteria: There shall be no rupture or surface crack due to having the load applied.

5-4 LWC and S246 shall sign the TEST DATA SHEET upon completion of the load test.

_s_H_IP_I_H_U_LL_N_o_.: _u_s_s_P_A_T_R_lo_r_, M_C_M_-7 _____ JON: ! ICN: Rev:

T.P FILE NO. : 58111-1-100_260578 I 3807G58201 ~ 06

Key Op:

A07 Page 5 of 6

6. TEST PROCEDURE COMPLETION

6-1 Sign the test procedure cover sheet to confirm that the test procedure has been fulfilled and completed and return it to S246 for review and approval.

7. REMARKS

SHIP/HULL NO.: USS PATRIOT/ MCM-7 ! I

------------------,JON:

ICN:

Rev:

T.P FILE NO.: 58111-1-100_26057B 3807G58201 i? 06

Key Op:

A07 Page 6 of 6

TEST DAT A SHEET

5-2 TMDE

EQUIPMENT TYPE RANGE SERIAL NO. CAL. DUE DATE

e • I

5-3.1 PRE-TEST INSPECTION

ACCEPTANCE CRITERIA RESULT

There shall be no rupture or surface crack.

□ SAT/ □ UNSAT

5-3.2 LOAD TEST

ACCEPTANCE CRITERIA

RESULT

TEST LOAD DURATION POST-TEST INSPECTION

Test load & duration: 211,500 -222, 075 pounds, 15 seconds.

There shall be no rupture or surface crack due to having the load applied. □ SAT/ □ UNSAT ounds seconds

5-4 COMPLETION OF THE TEST

RESPONSIBILITY PRINT NAME SIGNATURE & DATE

LWC

S246

ICN 3807G58201~ A07

ENGINEERING LIAISON MEMORANDUM

SRF.JRMC SASEBO

JAPAN

PlSllUBUTION STATEMENT C: Oiltn'bution aulboriad to U.S. Oo\lemmcnt

~-and their QOllbltclon; Critical Tec:lmolo,y; (I l/27fl025). Odwr U.S.

~-- forth.it~ t,hal.tberefenM to U.S. Naval Sbip RepairFM:ility

~J1pui ~ponal Maintenance Cent«, Sucbo, Japan.

I. HULL NO. / SIDP NAME/ TITL[. .EIMNO. D. REV ~. ICN/KO I.S. ESRNO.

MCM-7 I USS PATRIOT 255094 J A J 3807G58201-A01 I MCM7-395

.SCD ~. DFS REQUIRED

Anchor, Anchor Chain and Chain Appendages; SCD: Not applicable DFS: MCM-7-1000-2025

Repair I .SWBS p. ADDmONAL APPLICABILl1Y:

581 I Not Applicable

10. APPROVAL

l()ria:lnator D•te Reviewer Date

S. SEKI /S/ 04/15/2025 Y. IIDA /S/ 04/15/2025

IProJed Support Eactaeer Datt

J. HAVENS /S/ 04/15/2025

~2•5 Du.lea Branch Uud Dalt

C.R. HADNOT /S/ 04/15/2025

1$200A Tecbllkal Depaty Approval / LT A Date

A. M. BULLARD /S/ 04/15/2025

5200 Ea,tnetr and Planal■1 Dept. Head I L TA Date

D.A.BERLIN /S/ 04/15/2025

11. CORRECTNE ACTION

1. REFERENCE:

a. CFR SSK-001 , Anchor and Anchor Chain; inspection and preserve, dated 3/3/2025

b. S9086-TV-STM-010/CH-581/Rev 4, Anchoring

c. NA VSEA S9AA0-AB-GOS-010/GSO Rev 11, GENERAL SPECIFICATIONS FOR

OVERHAUL OF SURF ACE SHIPS

d. 803-632566, Rev W, Mark II Light Weight Type (LWT) Anchor Assembly & Details

e. 581-6135415 Rev A, Anchor Handling Arrangement and Details

f. 804-860000 Rev G, Chain Stoppers for 3/4 to 4-3/4 Anchor Chain Assembly and Details

g. DFS MCM-14-1000-2013, Anchor Handling/Pelican Hook Pins/Forward Deck

h. DFS MCM-9-1003-2024, Anchor Handling/Pelican Hook Pins/Forward Deck

i. 803-921790 Rev H, Links, Detachable High Strength J. 803-5959190 Rev-, 1-1/4 Die Lock Chain High Strength

2. ENCLOSURE:

(1) NIA

3. BACKGROUND:

a. Reference (a) reported defects in an anchor, anchor chains, and chain appendages found during the visual inspection.

b. Therefore, ESR MCM7-395 was issued requesting SRF-JRMC Det. Sasebo Design Branch Code

S245 to evaluate the reported defects and provide appropriate direction.

ELM255094A CUI 1 of3 k.

ICN 3807G58201_A07

CUI

4. GENERAL NOTES:

a. The purpose of this ELM is to provide recommended actions for the defects found in the anchor, the anchor chain, and chain appendages.

b. SRF-JRMC Det. Sasebo LTA Code S200 approves the recommendations in required actions below.

c. All general notes in references (d) thru (f), (i), and (j) apply.

5. REQUIRED ACTIONS:

Recommended actions for each component are as follows:

[Anchor Assembly]

a. For linear indications in the anchor assembly [reference (a), #1, 11, 12 and 13 of VISUAL

INSPECTION ANCHOR],

i) Perform PT or 5X VT inspection to identify all indications in the immediate area

(Approximately 1 inch in circumference) instead of MT stated in paragraph 581 ofreference (c).

ii) Grind the linear indications in stages and stop when sound metal is reached.

• The maximum grinding depth is 1/4-inch. If the linear indication remains after removing 1/4-inch, submit a CFR to receive further direction from the Project Team.

• Grinding shall be accomplished so that there are no unnatural irregularities on the metal surface.

iii) Perform either PT or 5X VT inspection, and ifno linear indications are identified, the anchor can be reused.

b. A broken split key, PC NO 9 ofreference (d), [reference (a), #14 of VISUAL INSPECTION ANCHOR] shall be fabricated and replaced in accordance with references (d) and (e). The use of K-Monel is acceptable in place of Hadfield Steel as per General Note 11 in reference (e).

c. Dents and pits reported in reference (a) [#2 thru IO of VISUAL INSPECTION ANCHOR] are considered to have occurred during the initial manufacturing of the casting. None of them fall within the scope of the repair requirement specified in paragraph 581 c of reference ( c ). The above mentioned defects are considered acceptable as-is. Therefore, no further action is required.

[Chain Stopper Assemblies]

a. A broken chain [PC NO 13 ofreference (f)] shall be replaced in accordance with references (e) and

(f). The use of K-Monel or CRES 316 is acceptable in place of Hadfield Steel.

b. Six (6) missing locking plates and six (6) cotter pins [PC NOs 19 and 20 ofreference (f)] in the chain stopper assemblies shall be fabricated and installed in accordance with references (e) and (f).

The use ofK-Monel or CRES 316 is acceptable in place of Hadfield Steel.

c. For an eyebolt with linear indications [PC NO 18 ofreference (f)], procure a replacement [Item 7d in this ELM] and replace the existing with a new one in accordance with references (e) and (f).

d. No repair action is required for cracks in the bail pin end [PC NO 11 ofreference (f)] of the pelican hook in one of three (3) chain stopper assemblies. It will be documented in a minor permanent DFS, MCM-7-1000-2025. The rationale is as follows: Similar issues previously

ELM255094A CUI 2 of3

ICN 3807G58201~A07

occurred on MCM-14 & MCM-9, and were authorized to leave the as-found condition permanently as documented via references (g) and (h), respectively.

[ Anchor Chain]

a. For the two (2) anchor chains with linear indications (reference (a), #23 in No. 5 shot and #204 in

No. 6 shot), replace with a detachable link [Item 7e in this ELM] in accordance with paragraph 581-5.4.3 ofreference (b).

b. For the anchor chain with ark strike (reference (a), #89 in No. I shot), remove ark strike and perform visual inspection. If there is any defect, submit a CFR.

c. Structural integrity is not affected by the pinhole in the welding (reference (a), #86 in No. I shot), the crack in the weld between the link and the bridge (reference (a), #183, 184, 188 in No.I shot, #55, 78, 79, 153, 169 in No.2 shot), and the larger than normal forging cleft (reference (a), #160, 166 in No.6 shot, #51 in No. IO shot). Therefore, no further action is required.

6. TEST NOTES:

@ a. For the chain stopper assembly with the replaced eye bolt, a proof test and inspections shall be performed in accordance with general note 6 in reference (f) as follows:

I) Perform proof test incorporating the required number and type of detachable links and held 15 second without developing any rupture or surface crack.

• The proof load shall be in accordance with table No. I of reference (f).

2) After completion of the proof test, perform visual testing (VT) for dimensional conformance.

3) After completion of VT, perform penetrant testing (PT) in accordance with T9074-AS-GIB

O 10/271 . Acceptance standard in accordance with MIL-STD-2035A, class 3 shall apply.

• Since the chain stopper assembly is non-magnetic, it is acceptable to perform PT instead of magnetic particle testing (MT).

7. MATERIALS:

a. Split key, Refer to PC NR 9 ofreference (d)

b. Locking plate, Refer to PC NR I 9 in Ref (f)

c. Ring, Refer to PC NR 13 in Ref (f)

d. Eyebolt, LH, Refer to PC NR 18 in Ref (f)

e. Link, Detachable, High Strength, 1-1/4" size in accordance with Ref (i), K-Monel per Item 10 in

Ref(e)

ELM 255094A CUI 3 of3

R

ICN 3807G58201_A07

CUI

REVISIONS

SHT REV DESCRIPTION DATE APPROVED

3 A Added proof test and inspection requirements for the chain stopper assembly with the replaced eyebolts.

DEESE.CHRI Dlgita1yolgned o., REASON: To add proof test and inspection 12/01/2025 STOPHER.JA ~•!1;~;':J,~~

MES.1279363 3058

requirements for the chain stopper assembly. 058 ~ :~ ~:~ !;~

S.Seki /S245

ELM255094A CUI 3Aof3

2026-05-14T13:32:55+0900
SANDERLIN.ROBERT.S.1242830705