3819P56202A03_c0v0TGI.pdf
PDF 1 MB Posted
- Solicitation number
- N6264925RABLR1
About this file
This document is a Task Group Instruction (TGI) for machining lower bearing staves of the rudder stock on the USS Blue Ridge (LCC-19). The work involves precision engineering of stave bearings, including 3 Keeper Staves, 24 Groove Staves, 12 Double Spring Staves, and 3 Wedge Staves, all made of laminated phenolic material to MIL-P-18324 specification. The project is located in the Steering Gear Room, Void, and Underwater Hull Area, with specific frames between 140 and 145.
The detailed instruction outlines a comprehensive alignment and boring process with strict tolerances, including a dimensional tolerance of +0.005 -0.000 inches and a concentricity tolerance of Φ 0.032 inches. The contractor work is scheduled to start on 2/1/2027 and complete by 3/31/2027. SRF-JRMC will provide supporting services including crane and rigging, utility services, safety inspections, and engineering support. The work requires multiple precise measurement and alignment checks, with all results to be reported to the government, and the boring process and grease groove machining will be directed by government specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-FEB-2025 0949
20.14.15.2.9020 (September 2024) ICN: 3819P56202 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: RUDDER STOCK RU A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 56211
CU PHASE TITLE: F/O - MACHINE LOWER BEARING STAVES OF RUDDER STOCK UNDERWATER HULL AREA
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
EA01ZA83
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KINOSHITA, TAKAHIRO 232 3152432491 31-JAN-2025
APPROVED BY: CODE: PHONE: DATE:
SENDA, HIDEMI 232 3152432496 31-JAN-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EA01-ZA83
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KONDO, SHINYA U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
562A1102
1 SCOPE/PURPOSE:
1.1 Title: Staves for Lower Bearing of Rudder Stock; machine
1.2 Location of Work:
1.2.1 Steering Gear Room (5-137-0-E)
1.2.2 Void (9-133-0-V)
1.2.3 Underwater Hull Area, Frames between 140 and 145
1.3 Identification:
1.3.1 Quantity (One EA), Lower Bearing Assembly of Rudder Stock Type: Stave Bearing Remarks: See Ref. No.3 for details
TGI Short Form
06-FEB-2025 0949
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P56202 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: RUDDER STOCK RU A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 56211
CU PHASE TITLE: F/O - MACHINE LOWER BEARING STAVES OF RUDDER STOCK UNDERWATER HULL AREA
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
1.3.1.1 Quantity (3 EA), Keeper Stave
Material: Laminated Phenolic Material Spec: MIL-P-18324 Remarks: See PC-1 of Ref. No.3 for details
1.3.1.2 Quantity (24 EA), Groove Stave
Material: Laminated Phenolic Material Spec: MIL-P-18324 Remarks: See PC-2 of Ref. No.3 for details
1.3.1.3 Quantity (12 EA), Double Spring Stave
Material: Laminated Phenolic Material Spec: MIL-P-18324 Remarks: See PC-3 of Ref. No.3 for details
1.3.1.4 Quantity (3 EA), Wedge Stave
Material: Laminated Phenolic Material Spec: MIL-P-18324 Remarks: See PC-4 of Ref. No.3 for details
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Dry Dock Work
1.6 Contractor work start date: 2/1/2027
1.7 Contractor work completion date: 3/31/2027
2 PROCEDURE:
2.1 Accomplish an alignment check of the equipment listed in 1.3.1 before machining in accordance with Enclosure-01, using Ref. No.3 for guidance.
2.1.1 Accomplish the requirements of 009-09 of Ref. No.One for the alignment check.
2.1.2 Measure the distance between upper bearing carrier lower face and lower bearing bushing upper face to monitor the deformation of hull structure around upper bearing carrier and lower bearing bushing by the environment in accordance with Paragraph 2.3.2 of Enclosure-01.
2.1.3 Measure and record each part for prepare machining in accordance with Paragraph 2 of Enclosure-01.
2.1.4 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of
2.1.3 to the SUPERVISOR.
2.2 Machine each stave listed in 1.3.1.1 through 1.3.1.4 of the equipment listed in 1.3.1 in accordance with Enclosure-01, using Ref. No.3 for guidance.
06-FEB-2025 0949
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P56202 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: RUDDER STOCK RU A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 56211
CU PHASE TITLE: F/O - MACHINE LOWER BEARING STAVES OF RUDDER STOCK UNDERWATER HULL AREA
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.2.1 Accomplish the requirements of 009-09 of Ref. No.One for the machining process.
2.2.2 Measure and record each part for machining in accordance with Paragraph 3 of Enclosure-01.
2.2.3 Machine the circumference grease groove in accordance with Paragraph 3 of Enclosure-01.
2.2.4 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of
2.2.2 and 2.2.3 to the SUPERVISOR.
2.3 Accomplish final alignment check of the equipment listed in 1.3.1 after machining in accordance with Enclosure-01, using Ref. No.3 for guidance.
2.3.1 Measure and record each part for final alignment check in accordance with Paragraph 4 of Enclosure-01.
2.3.2 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of
2.3.1 to the SUPERVISOR.
2.4 Accomplish the requirements of 009-32 of Ref. No.One for each new and disturbed surface.
2.5 Notes:
2.5.1 Planner: Code 232 T. Kinoshita, 243-2491
Engineer: Code 260 S. Kobayashi, 243-4339
2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.5.3 JCN EA01-ZA83 is related to this TGI.
2.6 Government Furnished Material (GFM): None.
2.7 SRF-JRMC will provide the following service work: (TGI No.3819P56202S03)
2.7.1 [C740] Crane and crane rigging service.
2.7.2 [X99E] Utility service, electrical.
2.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.7.6 [C133] QA inspection for (G) Symbol(s).
2.7.7 [C260] Provide engineering support.
06-FEB-2025 0949
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P56202 KeyOp: A03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: RUDDER STOCK RU A 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 56211
CU PHASE TITLE: F/O - MACHINE LOWER BEARING STAVES OF RUDDER STOCK UNDERWATER HULL AREA
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 519-2491343 RUDDER BEARINGS G Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 OMCH, RGRS, QA,
2.2 IMCH, RGRS, QA,
2.3 OMCH, RGRS,
2.4 PNTR, RGRS, QA
Machinery CFM: rental fees for alignment equipment and machining equipment, all cleaning brush, MISC such as covering material, rag, plastic bag/sheet and other consumable.
Process Funding Document.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P56202A03-Engrg Inst.pdf 27-JAN-2025 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P56202 KEY OP: A03
As of 2025/1/25 Rev-2
Rudder Lower Bearing alignment & boring
1. Total tolerance for alignment and boring processes.
The sum of all process’s tolerance of bored Lower Bearing ID shall be followings.
-Dimensional:
Tolerance +0.005 -0.000 inches.
-Geometric:
Concentricity tolerance is Φ 0.032 inches, toward ideal Center Line for entire alignment & boring process which include reading/ convert/ mark/ machine tolerance from Para 2.3.3. to 3.3.3.
In other word, this concentricity tolerance shall include each process (marked with ✦ on each paragraph) tolerances & accuracy. When each ✦ marked process tolerance & accuracy are evaluated by the contractor, they shall be consulted to the Government with PCP.
2. Alignment (Before boring)
2.1. Reference
N/A.
2.2. Check Sheet
Refer attachment.
2.3. Process of alignment check
2.3.1. Time
The Alignment Check shall be carried out stable hull temperature time (ex after daylight, especially mid-night to dawn).
It shall be carried out multiple timings with equal or longer duration of latter boring process to ensure the stability of machining. The duration & interval shall be consulted to the Government with PCP.
2.3.2. Hull condition
To monitor the deformation of Hull Structure around Upper Bearing Carier & Lower Bearing Bushing by the environment such as temperature, measure the distance between Upper Bearing Carrier lower face and Lower Bearing Bushing Upper face at each latter alignment check process.
2.3.3. Center Points (CP)
2.3.3.1. Determine CP
[✦Reading accuracy] CP of Plane A thru D shall be determined with the ID of Upper Bearing Carrier & Lower Bearing Bushing.
CP of Plane E shall be determined with Lower Bearing Bushing bolt holes (24 each) for Excluder Retainer.
At least 8 (45deg interval) ID points for CP A thru D and bolt holes for CP E per plane shall be used for these actions.
Note: The ID of plane C & D is possibly oval. When it is diƯicult to define CP, consult to the Government.
3819P56202A03
ENGRG INST
ENCLOSURE-01 Sheet 1 of 12
Takahiro.Kinoshit.ja Line
2.3.3.2. Mark CP of plane C & D
[✦Marking tolerance & reading repeatability accuracy] Mark obtained CP of plane C & D to the nearest trackable datum plane C’ & D’ with feasible manner (ex.
Scribing etc.) for latter processes because Lower Bearing Bushing ID will be inaccessible with installed Staves during/after Boring.
CP C’ & D’ shall be located on the line which extended from CP C & D, not the center of plane C’&D’.
The manner and location of marking shall be consulted to the Government with PCP.
2.3.4. Center Line (CL) and compare with CP
[✦Setting/extension of lines accuracy & deviation reading accuracy]
2.3.4.1. Determine CL(U) by CP A & B, and extend that to CP C’, D’ & E. Check the deviation with CL(L) and CPs with value and direction and record them in the Check Sheet.
2.3.4.2. Same action with Para 2.3.4.1 with CL(L) by CP C’ & D’, and comparing with CP A, B, C, D & E.
Note: The comparison of CL(L) with CP C & D is for the guarantee of Para 2.3.3.2.
2.3.4.3. Same action with Para 2.3.4.1 with Vertical Line from CP B and comparing with CP A, C’, D’ & E.
2.3.5. Report
Report the 2.3.4. result to Government.
Government determines the CL for boring from Para 2.3.4.1 thru 2.3.4.3 based on the result and inform to the Contractor.
3. Boring
3.1. Reference
DWG 2491343 Rev G.
3.2. Check Sheet
Refer attachment.
3.3. Process of boring
3.3.1. Time
The work time/duration shall be consulted to the Government based on the 2.3.5. result & PCP.
3.3.2 Pre-machining alignment
[✦Machine set tolerance & reading accuracy] Set the boring machine to the CL for boring informed at Para 2.3.5.
Report the deviation of machine CL and CL for boring to the Government.
3.3.3. Boring
[✦Machining process tolerance] Boring Stave ID will be directed by the Government.
Conjunction with Boring, machine the circumference grease groove in accordance with 3.1. The vertical location of the grease groove will be directed by the Government.
Report the machined ID & vertical location of grease groove to the Government.
3819P56202A03
ENGRG INST
ENCLOSURE-01 Sheet 2 of 12
Takahiro.Kinoshit.ja_1
4. Alignment (after boring)
[✦Same with Para 2.] Check the alignment with same manner of 2.3.4 with following changes. Report the result to the Government.
-CP C” & D” of Stave ID at plane C & D shall be added to the CL & CPs comparison.
-For Para 2.3.4.2., CP C & D can be omitted because they are substituted by C” & D”.
-Carry out the check and report of following two CL cases instead of all three CL cases.
a. The CL which was used for boring.
b. The CL vertical from CP B.
3819P56202A03
ENGRG INST
ENCLOSURE-01 Sheet 3 of 12
Takahiro.Kinoshit.ja_2
3819P56202A03
ENGRG INST
ENCLOSURE-01 Sheet 4 of 12
AutoCAD SHX Text
CP A
AutoCAD SHX Text_1 Plane A
AutoCAD SHX Text_2 4"
AutoCAD SHX Text_3
CP B
AutoCAD SHX Text_4 Plane B
AutoCAD SHX Text_5 3"
AutoCAD SHX Text_6
CP C
AutoCAD SHX Text_7 Plane C
AutoCAD SHX Text_8 2"
AutoCAD SHX Text_9
AREA STAVE INSTALLED
AutoCAD SHX Text_10
DEFINITION OF CP OF PARA 2.3.3.
AutoCAD SHX Text_11
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_12
TITLE:
AutoCAD SHX Text_13
DATE&TIME:
AutoCAD SHX Text_14
ICN/KO:
AutoCAD SHX Text_15
SHOP/GROUP:
AutoCAD SHX Text_16
CP D
AutoCAD SHX Text_17 Plane D
AutoCAD SHX Text_18 2"
AutoCAD SHX Text_19 Bolt Holes
AutoCAD SHX Text_20 Plane E
AutoCAD SHX Text_21
CP E
AutoCAD SHX Text_22 Sketch for CP A thru E
AutoCAD SHX Text_23
UPP BRG CARRIER
AutoCAD SHX Text_24
LWR BRG BUSHING
AutoCAD SHX Text_25 Sketch for CP C' & D'
AutoCAD SHX Text_26 Plane D'
AutoCAD SHX Text_27
CP D'
AutoCAD SHX Text_28 *1 CP C'&D' shall be located on the 1 CP C'&D' shall be located on the CP C'&D' shall be located on the line extended from CP C&D, not the center of Plane C'&D'. *2 Plane C'&D' of above sketch is only the example. Set the nearest feasible plane other than 'AREA STAVE INSTALLED' to track CP C&D for latter process.
AutoCAD SHX Text_29
CP C
AutoCAD SHX Text_30
CP D
AutoCAD SHX Text_31 Plane C'
AutoCAD SHX Text_32
CP C'
AutoCAD SHX Text_33
LWR BRG BUSHING
AutoCAD SHX Text_34
WHEATHER:
AutoCAD SHX Text_35
AMB TEMP:
Takahiro.Kinoshit.ja_3
ENCLOSURE-01 Sheet 5 of 12
AutoCAD SHX Text_36
CP A
AutoCAD SHX Text_37
CP B
AutoCAD SHX Text_38 Bolt Holes
AutoCAD SHX Text_39
CP E
AutoCAD SHX Text_40 Sketch for CL (U) Para 2.3.4.1.
AutoCAD SHX Text_41
UPP BRG CARRIER
AutoCAD SHX Text_42
LWR BRG BUSHING
AutoCAD SHX Text_43
CP D'
AutoCAD SHX Text_44
CP C'
AutoCAD SHX Text_45
AutoCAD SHX Text_46
AutoCAD SHX Text_47
AutoCAD SHX Text_48
AutoCAD SHX Text_49 L
AutoCAD SHX Text_50 T
AutoCAD SHX Text_51
FWD
AutoCAD SHX Text_52
AFT
AutoCAD SHX Text_53
PORT
AutoCAD SHX Text_54
STBD
AutoCAD SHX Text_55
CL
AutoCAD SHX Text_56
CP
AutoCAD SHX Text_57 CL(U) deviation from CPs
AutoCAD SHX Text_58 L
AutoCAD SHX Text_59 T
AutoCAD SHX Text_60
CP C'
AutoCAD SHX Text_61
CP D'
AutoCAD SHX Text_62
CP E
AutoCAD SHX Text_63 Plane E
AutoCAD SHX Text_64 CL(U) by CP A&B
AutoCAD SHX Text_65
CL/CP DEVIATION CHECK SHEET OF PARA 2.3.4.1.
AutoCAD SHX Text_66
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_67
TITLE:
AutoCAD SHX Text_68
DATE&TIME:
AutoCAD SHX Text_69
ICN/KO:
AutoCAD SHX Text_70
SHOP/GROUP:
AutoCAD SHX Text_71
WHEATHER:
AutoCAD SHX Text_72 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_73
FWD
AutoCAD SHX Text_74
STBD
AutoCAD SHX Text_75
AFT
AutoCAD SHX Text_76
PORT
AutoCAD SHX Text_77
AMB TEMP:
Takahiro.Kinoshit.ja_4
ENCLOSURE-01 Sheet 6 of 12
AutoCAD SHX Text_78 Bolt Holes
AutoCAD SHX Text_79
CP E
AutoCAD SHX Text_80 Sketch for CL (L) Para 2.3.4.2.
AutoCAD SHX Text_81
UPP BRG CARRIER
AutoCAD SHX Text_82
LWR BRG BUSHING
AutoCAD SHX Text_83
CP C
AutoCAD SHX Text_84
CP D
AutoCAD SHX Text_85
CP D'
AutoCAD SHX Text_86
CP C'
AutoCAD SHX Text_87
AutoCAD SHX Text_88
AutoCAD SHX Text_89
AutoCAD SHX Text_90
AutoCAD SHX Text_91 L
AutoCAD SHX Text_92 T
AutoCAD SHX Text_93
FWD
AutoCAD SHX Text_94
AFT
AutoCAD SHX Text_95
PORT
AutoCAD SHX Text_96
STBD
AutoCAD SHX Text_97
CL
AutoCAD SHX Text_98
CP
AutoCAD SHX Text_99 CL(L) deviation from CPs
AutoCAD SHX Text_100 L
AutoCAD SHX Text_101 T
AutoCAD SHX Text_102
CP A
AutoCAD SHX Text_103
CP B
AutoCAD SHX Text_104
CP C
AutoCAD SHX Text_105
CP D
AutoCAD SHX Text_106
CP EP E
AutoCAD SHX Text_107
CP A
AutoCAD SHX Text_108
CP B
AutoCAD SHX Text_109 *1 CP C&D result shall be within the Para 2.3.3.2. tolerance & accuracy.
AutoCAD SHX Text_110 Plane E
AutoCAD SHX Text_111 CL(L) by CP C'&D'
AutoCAD SHX Text_112
CL/CP DEVIATION CHECK SHEET OF PARA 2.3.4.2.
AutoCAD SHX Text_113
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_114
TITLE:
AutoCAD SHX Text_115
DATE&TIME:
AutoCAD SHX Text_116
ICN/KO:
AutoCAD SHX Text_117
SHOP/GROUP:
AutoCAD SHX Text_118
WHEATHER:
AutoCAD SHX Text_119 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_120
FWD
AutoCAD SHX Text_121
STBD
AutoCAD SHX Text_122
AFT
AutoCAD SHX Text_123
PORT
AutoCAD SHX Text_124
AMB TEMP:
Takahiro.Kinoshit.ja_5
ENCLOSURE-01 Sheet 7 of 12
AutoCAD SHX Text_125
CP B
AutoCAD SHX Text_126 Bolt Holes
AutoCAD SHX Text_127
CP E
AutoCAD SHX Text_128
UPP BRG CARRIER
AutoCAD SHX Text_129
LWR BRG BUSHING
AutoCAD SHX Text_130
CP D'
AutoCAD SHX Text_131
CP C'
AutoCAD SHX Text_132
AutoCAD SHX Text_133
AutoCAD SHX Text_134
AutoCAD SHX Text_135
AutoCAD SHX Text_136 L
AutoCAD SHX Text_137 T
AutoCAD SHX Text_138
FWD
AutoCAD SHX Text_139
AFT
AutoCAD SHX Text_140
PORT
AutoCAD SHX Text_141
STBD
AutoCAD SHX Text_142
CL
AutoCAD SHX Text_143
CP
AutoCAD SHX Text_144 CL(U) deviation from CPs
AutoCAD SHX Text_145 L
AutoCAD SHX Text_146 T
AutoCAD SHX Text_147
CP A
AutoCAD SHX Text_148
CP C'
AutoCAD SHX Text_149
CP D'
AutoCAD SHX Text_150
CP E
AutoCAD SHX Text_151 Plane E
AutoCAD SHX Text_152
CP A
AutoCAD SHX Text_153
CL/CP DEVIATION CHECK SHEET OF PARA 2.3.4.3.
AutoCAD SHX Text_154
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_155
TITLE:
AutoCAD SHX Text_156
DATE&TIME:
AutoCAD SHX Text_157
ICN/KO:
AutoCAD SHX Text_158
SHOP/GROUP:
AutoCAD SHX Text_159
WHEATHER:
AutoCAD SHX Text_160 CL which vertical from CP B
AutoCAD SHX Text_161 Sketch for CL (Vert) Para 2.3.4.3.
AutoCAD SHX Text_162 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_163
FWD
AutoCAD SHX Text_164
STBD
AutoCAD SHX Text_165
AFT
AutoCAD SHX Text_166
PORT
AutoCAD SHX Text_167
AMB TEMP:
Takahiro.Kinoshit.ja_6
ENCLOSURE-01 Sheet 8 of 12
AutoCAD SHX Text_168
CP B
AutoCAD SHX Text_169 Bolt Holes
AutoCAD SHX Text_170
CP E
AutoCAD SHX Text_171
UPP BRG CARRIER
AutoCAD SHX Text_172
LWR BRG STAVE
AutoCAD SHX Text_173
CP D'
AutoCAD SHX Text_174
CP C'
AutoCAD SHX Text_175
AutoCAD SHX Text_176
AutoCAD SHX Text_177
AutoCAD SHX Text_178
AutoCAD SHX Text_179 L
AutoCAD SHX Text_180 T
AutoCAD SHX Text_181
FWD
AutoCAD SHX Text_182
AFT
AutoCAD SHX Text_183
PORT
AutoCAD SHX Text_184
STBD
AutoCAD SHX Text_185
CL
AutoCAD SHX Text_186
CP
AutoCAD SHX Text_187 CL(MACHINE) deviation from CPs
AutoCAD SHX Text_188 L
AutoCAD SHX Text_189 T
AutoCAD SHX Text_190
CP A
AutoCAD SHX Text_191
CP B
AutoCAD SHX Text_192
CP C'
AutoCAD SHX Text_193
CP D'
AutoCAD SHX Text_194
CP E
AutoCAD SHX Text_195 Plane E
AutoCAD SHX Text_196 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_197
FWD
AutoCAD SHX Text_198
STBD
AutoCAD SHX Text_199
AFT
AutoCAD SHX Text_200
PORT
AutoCAD SHX Text_201
CP A
AutoCAD SHX Text_202
MACHINE SET-UP CHECK SHEET OF PARA 3.3.2.
AutoCAD SHX Text_203
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_204
TITLE:
AutoCAD SHX Text_205
DATE&TIME:
AutoCAD SHX Text_206
ICN/KO:
AutoCAD SHX Text_207
SHOP/GROUP:
AutoCAD SHX Text_208
WHEATHER:
AutoCAD SHX Text_209 *1 CPs which used for define CL can be omitted to deviation check.
AutoCAD SHX Text_210
BORING MACHINE CENTER LINE
AutoCAD SHX Text_211
MACHINE CENTER LINE
AutoCAD SHX Text_212
AMB TEMP:
Takahiro.Kinoshit.ja_7
ENCLOSURE-01 Sheet 9 of 12
Takahiro.Kinoshit.ja_8
ENCLOSURE-01 Sheet 10 of 12
AutoCAD SHX Text_213
CP A
AutoCAD SHX Text_214
CP B
AutoCAD SHX Text_215 Bolt Holes
AutoCAD SHX Text_216
CP E
AutoCAD SHX Text_217 Sketch for CL (U)
AutoCAD SHX Text_218
UPP BRG CARRIER
AutoCAD SHX Text_219
LWR BRG STAVE
AutoCAD SHX Text_220
CP C"
AutoCAD SHX Text_221
CP D"
AutoCAD SHX Text_222
CP D'
AutoCAD SHX Text_223
CP C'
AutoCAD SHX Text_224
AutoCAD SHX Text_225
AutoCAD SHX Text_226
AutoCAD SHX Text_227
AutoCAD SHX Text_228 L
AutoCAD SHX Text_229 T
AutoCAD SHX Text_230
FWD
AutoCAD SHX Text_231
AFT
AutoCAD SHX Text_232
PORT
AutoCAD SHX Text_233
STBD
AutoCAD SHX Text_234
CL
AutoCAD SHX Text_235
CP
AutoCAD SHX Text_236 CL(U) deviation from CPs
AutoCAD SHX Text_237 L
AutoCAD SHX Text_238 T
AutoCAD SHX Text_239
CP C'
AutoCAD SHX Text_240
CP C"
AutoCAD SHX Text_241
CP D"
AutoCAD SHX Text_242
CP D'
AutoCAD SHX Text_243
CP E
AutoCAD SHX Text_244 Plane E
AutoCAD SHX Text_245 CL by CP A&B
AutoCAD SHX Text_246
CL/CP DEVIATION CHECK SHEET OF PARA 4 (1/3)
AutoCAD SHX Text_247
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_248
TITLE:
AutoCAD SHX Text_249
DATE&TIME:
AutoCAD SHX Text_250
ICN/KO:
AutoCAD SHX Text_251
SHOP/GROUP:
AutoCAD SHX Text_252
WHEATHER:
AutoCAD SHX Text_253 *1 CP C"&D" are center of Stave ID, not the Bushing ID.
AutoCAD SHX Text_254 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_255
FWD
AutoCAD SHX Text_256
STBD
AutoCAD SHX Text_257
AFT
AutoCAD SHX Text_258
PORT
AutoCAD SHX Text_259
AMB TEMP:
Takahiro.Kinoshit.ja_9
ENCLOSURE-01 Sheet 11 of 12
AutoCAD SHX Text_260 Bolt Holes
AutoCAD SHX Text_261
CP E
AutoCAD SHX Text_262 Sketch for CL (L)
AutoCAD SHX Text_263
UPP BRG CARRIER
AutoCAD SHX Text_264
CP C"
AutoCAD SHX Text_265
CP D"
AutoCAD SHX Text_266
CP D'
AutoCAD SHX Text_267
CP C'
AutoCAD SHX Text_268
CP A
AutoCAD SHX Text_269
CP B
AutoCAD SHX Text_270 Plane E
AutoCAD SHX Text_271 CL by CP C'&D'
AutoCAD SHX Text_272
CL/CP DEVIATION CHECK SHEET OF PARA 4 (2/3)
AutoCAD SHX Text_273
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_274
TITLE:
AutoCAD SHX Text_275
DATE&TIME:
AutoCAD SHX Text_276
ICN/KO:
AutoCAD SHX Text_277
SHOP/GROUP:
AutoCAD SHX Text_278
WHEATHER:
AutoCAD SHX Text_279
AutoCAD SHX Text_280
AutoCAD SHX Text_281
AutoCAD SHX Text_282
AutoCAD SHX Text_283 L
AutoCAD SHX Text_284 T
AutoCAD SHX Text_285
FWD
AutoCAD SHX Text_286
AFT
AutoCAD SHX Text_287
PORT
AutoCAD SHX Text_288
STBD
AutoCAD SHX Text_289
CL
AutoCAD SHX Text_290
CP
AutoCAD SHX Text_291 CL(U) deviation from CPs
AutoCAD SHX Text_292 L
AutoCAD SHX Text_293 T
AutoCAD SHX Text_294
CP A
AutoCAD SHX Text_295
CP B
AutoCAD SHX Text_296
CP C"
AutoCAD SHX Text_297
CP D"
AutoCAD SHX Text_298
CP E
AutoCAD SHX Text_299 *1 CP C"&D" are center of Stave ID, not the Bushing ID.
AutoCAD SHX Text_300
LWR BRG STAVE
AutoCAD SHX Text_301 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_302
FWD
AutoCAD SHX Text_303
STBD
AutoCAD SHX Text_304
AFT
AutoCAD SHX Text_305
PORT
AutoCAD SHX Text_306
AMB TEMP:
Takahiro.Kinoshit.ja_10
ENCLOSURE-01 Sheet 12 of 12
AutoCAD SHX Text_307
CP B
AutoCAD SHX Text_308 Bolt Holes
AutoCAD SHX Text_309
CP E
AutoCAD SHX Text_310
UPP BRG CARRIER
AutoCAD SHX Text_311
CP C"
AutoCAD SHX Text_312
CP D"
AutoCAD SHX Text_313
CP D'
AutoCAD SHX Text_314
CP C'
AutoCAD SHX Text_315 Plane E
AutoCAD SHX Text_316
CP A
AutoCAD SHX Text_317
CL/CP DEVIATION CHECK SHEET OF PARA 4 (3/3)
AutoCAD SHX Text_318
HULL: USS BLUE RIDGE (LCC 19)
AutoCAD SHX Text_319
TITLE:
AutoCAD SHX Text_320
DATE&TIME:
AutoCAD SHX Text_321
ICN/KO:
AutoCAD SHX Text_322
SHOP/GROUP:
AutoCAD SHX Text_323
WHEATHER:
AutoCAD SHX Text_324 CL which vertical from CP B
AutoCAD SHX Text_325 Sketch for CL (Vert)
AutoCAD SHX Text_326
AutoCAD SHX Text_327
AutoCAD SHX Text_328
AutoCAD SHX Text_329
AutoCAD SHX Text_330 L
AutoCAD SHX Text_331 T
AutoCAD SHX Text_332
FWD
AutoCAD SHX Text_333
AFT
AutoCAD SHX Text_334
PORT
AutoCAD SHX Text_335
STBD
AutoCAD SHX Text_336
CL
AutoCAD SHX Text_337
CP
AutoCAD SHX Text_338 CL(U) deviation from CPs
AutoCAD SHX Text_339 L
AutoCAD SHX Text_340 T
AutoCAD SHX Text_341
CP A
AutoCAD SHX Text_342
CP C'
AutoCAD SHX Text_343
CP C"
AutoCAD SHX Text_344
CP D"
AutoCAD SHX Text_345
CP D'
AutoCAD SHX Text_346
CP E
AutoCAD SHX Text_347 *1 CP C"&D" are center of Stave ID, not the Bushing ID.
AutoCAD SHX Text_348
LWR BRG STAVE
AutoCAD SHX Text_349 Distance between etween tween een Carrier LWR face & Bushing UPP face & Bushing UPP faceBushing UPP face
AutoCAD SHX Text_350
FWD
AutoCAD SHX Text_351
STBD
AutoCAD SHX Text_352
AFT
AutoCAD SHX Text_353
PORT
AutoCAD SHX Text_354
AMB TEMP:
Takahiro.Kinoshit.ja_11
File details come from the government source that posted it. Updated .