N6264925RA042.pdf
PDF 1 MB Posted
- Solicitation number
- N6264925RA042
About this file
This is a Request for Proposal (RFP) for an inspection and reporting contract for Berthing and Messing Barges (YR-96) located in Yokosuka, Japan. The U.S. Navy's Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka is seeking a contractor to conduct a comprehensive void and bilge inspection on the barges, with a performance period from May 13, 2025 to December 30, 2025. The contract will be awarded as a firm-fixed-price job order, and only Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) holders are eligible to bid.
Key requirements include a detailed inspection of all barge voids and bilges, documenting coating and structural conditions according to specific naval standards, and providing a comprehensive written report. Contractors must follow precise inspection protocols, including assessing metal loss, coating conditions, and potential structural deficiencies. The solicitation emphasizes that no repairs are to be performed during this inspection, and the contractor must use specific technical references and guidelines. Proposals are due by April 23, 2025, at 3:00 PM Japan Standard Time, with award anticipated shortly thereafter. Access to detailed drawings and references requires pre-approval through the Department of Defense Secure Access File Exchange (SAFE) system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.03 RFP Attachment (IV) Price Proposal Form.xlsx | XLSX spreadsheet | |
| 2.03 RFP Attachment (V) Request for Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 23 Apr 2025
X
A X B X C
D
EX
X G F 24 - 29
30 - 33 X H 34 - 36 masanori.rokutan2.ln@us.navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 36
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N62649 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and via Email conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MASANORI ROKUTAN 0468-16-7379
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
4 - 6 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 9 - 11 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 12 - 15 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
16 - 22
PART II - CONTRACT CLAUSES
NAVSUP FLC YOKOSUKA
(CODE 200)
CONTRACTING DEPARTMENT
PSC 473 BOX 11
FPO AP 96349-0011
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N6275825RC10007
5. DATE ISSUED
17 Apr 2025
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6264925RA042
Section A - Solicitation/Contract Form
SECTION A
SOLICITATION/CONTRACT FORM
MASTER AGREEMENT FOR THE REPAIR AND ALTERATION OF VESSELS (MARAV): In the event the successful offeror possesses a Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S.
Navy in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR), award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the offer’s existing MARAV will apply.
Firms who do not possess an MSRA/ABR are ineligible for award unless adequate time exists to permit the Navy to perform an assessment of their MSRA/ABR application and to execute the applicable MSRA/ABR without impacting the vessel’s availability dates.
Pursuant to FAR 5.202(a) (12), this is a non-mandatory synopsis. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 225.1103(3).
1. Berthing and Messing Barges (YR-96): NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY) has a new requirement in support of the Berthing and Messing Barges (YR-96). The inspection package of work items are included as Statement of Work (SOW). Drawings stated in SOW are included as ATTACHMENT (I). References stated in SOW are included as ATTACHMENT (II) and (III).
2. PERIOD OF PERFORMANCE: 13 May 2025 to 30 Dec 2025
3. PLACE OF PERFORMANCE: Yokosuka Base
4. QUOTE: Offerors must provide all information required by this solicitation no later than 23 Apr
2025 at 03:00 PM Japan Standard Time (JST).
5. WORK ITEM INFORMATION:
a. Any work item priced based on an estimated quantity/scope will be balanced at the completion of the availability via a contract modification.
b. Access to the work specification package listed in Section J as ATTACHMENT (I) through (III) may only be accessed through DoD SAFE. DoD SAFE is a secure U.S. Government repository which enables the sharing of large files and requires outside users to receive a drop-off request from the U.S. Government.
Therefore, any offeror intending to provide a proposal to this solicitation shall request access by sending an email to Masanori.Rokutan2.LN@us.navy.mil and mariacrispina.c.mallari2.ln@us.navy.mil by 22 Apr 2025 10:00 am JST. Once the U.S. Government receives the offeror's access request, the U.S. Government will provide the offeror with a link and instructions to retrieve ATTACHMENT (I) through (III). Offerors shall note that access is only available for 14 days once sent.
MSRA/ABR Number
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Group
VOID AND BILGE INSPECTIONS AND REPORT
FFP
The contractor shall accomplish the requirements listed in the Statement of Work
(SOW).
The contractor is required to submit an itemized breakdown of the total price proposal using ATTACHMENT IV Price Proposal Breakdown Sheet provided in Section J. Failure to properly complete and submit ATTACHMENT IV by the specified closing date may cause rejection of the proposal.
YEN AMOUNT
Note - The U.S. Dollar amounts shown are for the Government administrative purposes only. FY25 Budget Exchange Rate of JPY145.7323 per USD1.00 applies.
FOB: Destination
MILSTRIP: N6275825RC10007
PURCHASE REQUEST NUMBER: N6275825RC10007
SIGNAL CODE: A
PSC CD: H319
NET AMT
Section C - Descriptions and Specifications
Statement of Work Rev. 5.1: 4/16/2025
COMPACFLT BERTHING AND MESSING BARGE PROGRAM
CONDUCT INSPECTION AND PROVIDE REPORT (YR-96)
1. PURPOSE:
1.1. This Statement of Work (SOW) defines the effort required to satisfy the Government’s requirement to conduct a full Inspection of the Voids and Bilges and to provide report on YR-96 Berthing and Messing Barges located in Yokosuka, Japan. The period of performance (POP) for this contract will be from May 13, 2025 to December 30, 2025. The work shall be completed at the Contractors facilities. Barge removal and towing shall be coordinated through the Contractor.
1.2 NO REPAIRS (I.E. GROWTH WORK) SHALL BE PERFORMED BY THE CONTRACTOR
UNDER THIS SOW AS THE RESULT OF FINDINGS OR CONDITIONS NOTED DURING
INSPECTION BY THE CONTRACTOR. GROWTH WORK IS NOT WITHIN SCOPE AND IS
NOT AUTHORIZED UNDER THIS CONTRACT.
2. ATTACHMENTS:
2.1. DRAWING 7587905
2.2. DRAWING 7578549
2.3. DRAWING 7578550
3. REFERENCES
3.1. T9630-AB-MMD-010, CORROSION CONTROL ASSESSMENT AND MAINTENANCE MANUAL
(CCAMM) REVISION 3
3.2. S9086-DA-STM-010, NAVAL SHIP’S TECHNICAL MANUAL, CHAPTER 100, HULL STRUCTURES
(NSTM 100) REVISION 4
4. GENERAL REQUIREMENTS AND RESPONSIBILITIES:
4.1. The Pacific Fleet (PACFLT) Regional Program Manager will be the overall Project Manager (PM) and will provide oversight and liaison between KTR, the Barge Maintenance team (BMT), and Ship’s Force (if occupying the Barge).
4.2. The PM will provide local resolution to questions and concerns presented by the KTR. When Local resolution is not possible, the PM will consult the Planning Yard for technical resolution response authority.
4.3. Upon award of contract, the KTR will develop a scope of work (plan of action) and general schedule (in Gantt format) for work on the Barge.
4.4. All correspondence, meetings, and conferences will be held or delivered in English.
4.5. During execution of work KTR will hold a daily meeting with PM, detailing production progress and any production or material issues.
4.6. The PM via the BMT will provide electrical and mechanical isolation as required.
4.7. Where any reference or attachment is silent on material direction, KTR is to provide and use American Bureau of Shipping (ABS) standard equivalent.
4.8. KTR will provide power, service air, all necessary consumable materials, tools (including test equipment), temporary lighting, scaffolding, ventilation, Personal Protection Equipment, technicians, mechanics, quality assurance representatives as required to perform the requirements of this SOW.
4.9. KTR shall identify, remove from Ship, and dispose of all waste (industrial, hazardous, etc.) generated as a result of work conducted under this contract in accordance with applicable Japanese Government regulations, any licenses or permits obtained for this use, a copy of that license or permit will be provided to the PM at the time of receipt of said license or permit.
4.9.1. KTR shall NOT dispose of any substance (liquids or trash) discovered prior to, during, or produced as a result of any type of work on the barge into any of the onboard drainage system.
4.9.1.1. Ensure that harmful vapors, fumes, and mists are ventilated to the exterior of the vessel.
4.9.2. Contractor is responsible for correctly packaging, storing, tagging and transportation costs.
4.9.3. Government PM will NOT provide a separate internal funding for disposal costs generated by this
SOW.
4.9.4. Government PM will NOT provide a Job Order Number to contractor to facilitate internal processes.
4.10. After any inspection reports detailed in this SOW are submitted to the PM, KTR will propose solutions, recommendations, cost estimates, material availability, and time impact to the POP in the form of “condition found report” (CFR) within twenty-four (24) hours of conditions found and reported. This form shall be submitted electronically for records keeping purposes.
4.11. All completion of work reports submitted for the purposes of this SOW will be signed by the KTR Project manager and KTR quality assurance manager and the KTR safety manager, all of whom will be designated in writing to the PM prior to any work being accomplished.
4.12. PM information
Mr. Olen Jason Loftis, SRF & JRMC Yokosuka C1209.6 COMM Phone: 046-816-0135 Email: olen.j.loftis.civ@us.navy.mil
5. CONDUCT ASSESSMENT OF ALL BARGE VOIDS AND BILGES (INCLUDING APPENDAGES)
5.1. Accomplish the requirements listed in references 3.1 and 3.2 and guidance listed in MIP 1231/005 AP-1 G1N5 for Tanks and Voids and MIP 1000/005 AP-1 (MRC) G1N6 for General Structure to conduct assessment of all Voids and Bilges at locations in attachment 2.1 through 2.3 of the SOW.
5.2. Requirements for coating inspections shall be accomplished in accordance with the following:
5.2.1. CCAMM Coating Conditions: CCAMM (Corrosion Control Assessment and Maintenance Manual) is the governing document for the CCIMS (Corrosion Control Information Management System), which serves as the basis for making decisions that relate to the repair or replacement of coating systems and structure. The following are conditions relating to coating conditions:
5.2.2. Condition P1 - Surface area with ≤ 0.03% coating failure/corrosion. Little or no corrosion found. No maintenance action required.
5.2.3. Condition P2 - Surface area with > 0.03% to 1.0% coating failure/corrosion. Some corrosion found but no component/system impairment.
5.2.4. Condition P3 - Surface area with ≥ 1.0% to 10.0% coating failure/corrosion. Significant corrosion and paint system failure found. Maintenance action is an immediate concern.
5.2.5. Condition P4 - Surface area with ≥ 10.0% coating failure/corrosion. Extensive corrosion and paint system failure found.
5.3. Requirements for structural condition shall be accomplished in accordance with the following:
5.3.1. CCAMM Structural Conditions: IAW NSTM 100, when a ship is assigned availability for repair, or as assigned by the Class Maintenance Plan (CMP), or when evidence of severe deterioration has been reported, repairs shall be based on criteria which have been established for such examinations. The following are conditions relating to structural conditions:
5.3.2. Condition S1 – Metal Loss: None.
5.3.3. Condition S2 – Metal Loss: < 5% for Steel & Aluminum.
5.3.4. Condition S3 – Metal Loss: ≥ 5% to 20% for Steel; ≥ 5% TO 15% for LCS 1 Class; ≥ 5% to 10% for
PC Class; ≥ 5% to 10% for Aluminum.
5.3.5. Condition S4 – Metal Loss: ≥ 20% to 25% for Steel; ≥ 15% to 20% for LCS 1 Class, ≥10% to 15% for
PC Class; ≥ 10% to 15% for Aluminum.
5.3.6. Condition S5 – Metal Loss: ≥ 25% for Steel; ≥ 20% for LCS 1 Class; ≥ 15% for PC Class; ≥ 15% for
Aluminum; ≥ 15% Cross Section Area Loss for Stanchions. Structural deficiencies including: Holing;
Cracking; Deformation; or other signs of Physical Damage.
5.3.6.1. Ensure application of proper SURFACE PROFILE of the Bare Metal prior to application of any coating in accordance with requirements listed in references provided.
5.4. Restore condition of manhole covers to that of original status upon completion, tightening each fastener to 30 torque psi in a ”star” pattern.
5.4.1. Apply touch up paint to any surfaces where original paint was disturbed or damaged during removal process.
5.5. NO REPAIRS (I.E. GROWTH WORK) SHALL BE PERFORMED BY THE CONTRACTOR
UNDER THIS SOW AS THE RESULT OF FINDINGS OR CONDITIONS NOTED DURING
INSPECTION BY THE CONTRACTOR. GROWTH WORK IS NOT WITHIN SCOPE AND IS
NOT AUTHORIZED UNDER THIS CONTRACT.
6. Final Acceptance
6.1. After requirements in sections five (5) are completed, Contractor shall provide Government with detailed written report of conditions of the voids and bilges. Provide documentation showing work requirements to restore conditions to include structural appendages, ladders, stanchions, support brackets, manhole cover access, and all other associated metal surfaces.
6.2. The Contractor shall return the barge to the Government PM after final acceptance within the PoP.
Section E - Inspection and Acceptance
SECTION E
INSPECTION AND ACCEPTANCE
E-1.0 Inspection of the work accomplished hereunder shall be performed periodically by an authorized representative during the performance of the work and at the final inspection upon completion of the work.
The representative will be identified in writing at time of contract award.
E-2.0 Quality Assurance: The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka/Detachment Sasebo, Japan requirements and Commander, Logistics Group Western Pacific (COMLOGWESTPAC) SRU Singapore requirements, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-04. In addition to its rights under DFARS clause 252.217-7005 Inspection and Manner of Doing Work of the Master Agreement for Repair and Alteration of Vessels, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality management system and, as such, the Contractor shall not be entitled to progress payments for said work and material.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-11 Higher-Level Contract Quality Requirement DEC 2014
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 13-MAY-2025 TO
30-DEC-2025
N/A SRF AND JRMC
GOVERNMENT REPRESENTATIVE
PSC 473 BOX 8
FPO AP 96349-0008
243-4247 FOB: Destination
N62758
52.242-15 Stop-Work Order AUG 1989
Section G - Contract Administration Data
252.204-7006 Billing Instructions--Cost Vouchers MAY 2023
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Invoice and Receiving Report (Combo)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0721
Issue By DoDAAC N62649
Admin DoDAAC** N62649
Inspect By DoDAAC N62758
Ship To Code N62758
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N62758
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N62758
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
WAWF POC listed as:
Ms. Miyuki Hiwatari (miyuki.hiwatari.ln@us.navy.mil) Ms. Kayo Oobayashi (kayo.oobayashi.ln@us.navy.mil)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H-1.0 OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR
1915) The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards. The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.
H-2.0 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government’s rights under the “Inspection” clause, nor does it limit the Government’s rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
H-3.0 CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only) The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement “A” (Approved for public release:
distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRFJRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF-JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.
H-4.0 Lay Down Space The Contractor may request the lay down space adjacent to the ship yard in Yokosuka Naval base. Upon the receipt of approval by the Government, the Contractor may obtain the applicable lay down space. The Contractor shall be responsible for all the cost, but not limited to, for maintaining the facility, utility, safety, and security.
H-5.0 Applicable to Contracts Performed in Japan:
HISTORIC AND CULTURAL RESOURCES
If ship repair work is being performed in and around potentially significant historic buildings and structures (cultural properties) such as Dry Docks 1 through 6 and Cave 682 in Yokosuka Base, the contractor shall avoid changing the original materials and finishes used in the properties.
If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.
If work is being performed on a cultural or historical asset, such as a historical building/structure or archeological site, special precautions may be necessary. The contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work. The contractor shall contact the CFAY Cultural Resources Manager through the Contracting Officer to determine if the work involves any archaeological, historical or cultural assets.
The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations.
During the monitoring, use of flat bladed bucket is required for backhoe operations. If any cultural/historical artifacts/assets include brick structures, manufactures plates indicating years before 1945 on the machines and equipment are discovered during work, the contractor shall notify the Public Works Department (PWD) Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager (DSN 243- 5136/COMM 046-816-5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area until further direction from the PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer.
If the items need to be temporarily removed, carefully protect them from disturbance, including weather conditions, unforeseen traffic, and pilfering. The PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer will provide further direction/guidance on how to protect the items. The Government retains ownership and control over historical and archaeological resources.
The contractor shall carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Upon discovery, the contractor shall notify Cultural, Historical, and/or Natural Resources (CHNR) Manager (DSN 243-5136/COMM 046-816- 5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area. The Government retains ownership and control over historical and archaeological resources.”
JAPANESE CONCILIATION PROCEDURES
(a) Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.
(b) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(c) The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(d) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.
(e) In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.
(f) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered. Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.
CONSUMPTION TAX
(a) The Governments of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES – FOREIGN FIXED- PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations. By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax. The following U.S. Government (USG) proof of purchase forms shall be used to claim the exemption at tax offices:
USG Standard Form 1034 USG Standard Form 1113 USG Standard Form 44 Department of Defense Form 1155 Navy Comptroller Form 2277
(b) The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven (7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regard to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.
(c) Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.
CUSTOMS AND TAX EXEMPTION
(a) The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed Forces in Japan. The Contractor's request shall include the following information:
(1) Name of contractor;
(2) Contract number and job order number (if applicable);
(3) Nomenclature of taxable material to be delivered and intended use;
(4) Quantity of taxable material used or to be delivered; and
(5) Period of taxable material use.
(b) In the case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures. The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements. Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.
Section I - Contract Clauses
SECTION I
CONTRACT CLAUSES
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer(s) are:
NAME: All Authorized NAVSUP Fleet Logistics Center Yokosuka (FLCY) Contracting Officers
ADDRESS: CONTRACTING DEPARTMENT (CODE 200)
NAVSUP FLCY
PSC 473 BOX 11
FPO AP 96349-0011
TELEPHONE: DSN: 315-243-6908 / COMM 011-81-46-816-6908
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-2 Alt II Security Requirements (MAR 2021) - Alternate II APR 1984 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-19 Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
JAN 2025
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.222-50 Combating Trafficking in Persons NOV 2021 52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.228-7 Insurance--Liability To Third Persons MAR 1996 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.229-11 Tax on Certain Foreign Procurements--Notice and
Representation
JUN 2020
52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Alt I Disputes (May 2014) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-13 Bankruptcy JUL 1995 52.244-6 Subcontracts for Commercial Products and Commercial
Services
JAN 2025
52.245-1 Government Property SEP 2021 52.245-9 Use And Charges APR 2012 52.246-26 Reporting Nonconforming Items. AUG 2024 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
JAN 2023
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
MAY 2024
252.204-7014 Limitations on the Use or Disclosure of Information by Litigation Support Contractors
JAN 2023
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7021 Contractor Compliance with the Cybersecurity Maturity
Model Certification Level Requirement
JAN 2023
252.204-7022 Expediting Contract Closeout MAY 2021 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7003 Item Unique Identification and Valuation JAN 2023 252.217-7003 Changes DEC 1991 252.217-7004 Job Orders and Compensation MAY 2006 252.217-7006 Title DEC 1991 252.217-7007 Payments DEC 1991 252.217-7008 Bonds DEC 1991 252.217-7009 Default DEC 1991 252.217-7010 Performance JUL 2009 252.217-7012 Liability and Insurance AUG 2003 252.217-7013 Guarantees DEC 1991 252.217-7014 Discharge of Liens DEC 1991 252.217-7015 Safety and Health DEC 1991 252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7005 Identification Of Expenditures In The United States JUN 2005 252.225-7007 Prohibition on Acquisition of Certain Items from Communist
Chinese Military Companies
DEC 2018
252.225-7019 Restriction on Acquisition of Anchor and Mooring Chain MAY 2024 252.225-7041 Correspondence in English JUN 1997 252.225-7043 Antiterrorism/Force Protection Policy for Defense
Contractors Outside the United States
JUN 2015
252.225-7048 Export-Controlled Items JUN 2013 252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned
Aircraft Systems (DEVIATION 2024-O0014)
AUG 2024
252.225-7976 (Dev) Contractor Personnel Performing in Japan. (DEVIATION 2018-O0019)
AUG 2018
252.229-7001 Tax Relief APR 2020 252.229-7014 Full Exemption from Two-Percent Excise Tax on Certain
Foreign Procurements
OCT 2022
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.245-7003 Contractor Property Management System Administration JAN 2025 252.245-7005 Management and Reporting of Government Property JAN 2024 252.246-7005 Notice of Warranty Tracking of Serialized Items MAR 2016 252.246-7006 Warranty Tracking of Serialized Items MAR 2016 252.246-7007 Contractor Counterfeit Electronic Part Detection and
Avoidance System
JAN 2023
252.246-7008 Sources of Electronic Parts JAN 2023
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(End of provision)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses: https://www.acquisition.gov/browse/index/far/ DFARS Clauses: http://www.acq.osd.mil/dpap/dars/dfarspgi/current/
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any DFARS (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF
WORK/PERFORMANCE WORK STATEMENT.
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .