This is a 54-page solicitation (N6264925RA018) for ship repair services on the USS HOWARD (DDG83) issued by NAVSUP Fleet Logistics Center Yokosuka. The contract requires a contractor to perform Selected Repair Availability (SRA) Bundle 3 work, including 13 Task Group Instructions with associated drawings and specifications, to be conducted at Yokosuka Naval Base between April 7, 2025 and September 16, 2025.

The solicitation uses a Lowest Price Technically Acceptable (LPTA) source selection process and will be awarded as a Firm-Fixed-Price contract. Proposals are due by January 22, 2025 at 10:00 AM JST. The contract includes two CLINs - CLIN 0001 for the base repair work and CLIN 0002 for Growth Work estimated at 8.92% of CLIN 0001's value. Contractors must possess a current Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) certification from NAVSUP FLCY at time of award. Technical acceptability will be evaluated based on proposed labor hours and material costs, while past performance will be assessed on quality of service, timeliness, and management capability over the past three years.

View the file

Other files

File Type Posted
Attachment IV RFI.pdf PDF
Attachment V Contract data.pdf PDF
Attachment II PBF.xlsx XLSX spreadsheet
Attachment III GFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 10:00 AM local time 22 Jan 2025

X

A X B X C

D

EX

X G F 39 - 48

49 - 52 X H 53 - 57 miwa.takahashi2.ln@us.navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 57

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N62649 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and via E-mail conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

MIWA TAKAHASHI 0468-16-7623

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 15 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 18 - 20 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 21 - 28 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

29 - 37

PART II - CONTRACT CLAUSES

NAVSUP FLC YOKOSUKA

(CODE 200)

CONTRACTING DEPARTMENT

PSC 473 BOX 11

FPO AP 96349-0011

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N6275824RC38JC212371A01

5. DATE ISSUED

23 Dec 2024

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6264925RA018

Section A - Solicitation/Contract Form

SECTION A

SOLICITATION/CONTRACT FORM

Award of a contract resulting from this solicitation is restricted to firms, which possess a current Master Ship Repair Agreement (MSRA)/Agreement for Boat Repair (ABR).

Firms who do not possess an MSRA/ABR are ineligible for award unless adequate time exists to permit the Navy to perform an assessment of their MSRA/ABR application and to execute the applicable MSRA/ABR without impacting the vessel’s availability dates.

Pursuant to FAR 5.202(a) (12), this is a non-mandatory synopsis. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 225.1103(3)."

MSRA/ABR Number

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

USS HOWARD DDG83 FY25 5C1 SRA BUNDLE 3

FFP

The contractor shall accomplish the work requirements of all 13 Task Group Instructions (TGIs) as outlined in the provided drawings and specification, and as attached in Section J ATTACHMENT (I). The contractor will be responsible for ship repair work to include providing the necessary management, scheduling, testing, quality assurance, technical documentations to support the USS HOWARD DDG83 FY25 5C1 SRA Bundle 3.

The contractor is required to submit an itemized breakdown of the price for each item on the form provided in Section J ATTACHMENT (II). Failure to submit this documentation properly completed by the specified closing date may cause rejection of the offer.

YEN AMOUNT

Note - The U.S. Dollar amounts shown are for the Government administrative purposes only. FY25 Budget Exchange Rate of JPY145.7323 per USD1.00 applies.

FOB: Destination

MILSTRIP: N6275824RC38JC212371A01

PURCHASE REQUEST NUMBER: N6275824RC38JC212371A01

SIGNAL CODE: A

PSC CD: J999

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

USS HOWARD DDG83 FY25 5C1 SRA BUNDLE 3

FFP

The contractor shall accomplish GROWTH WORK necessary to accommodate anticipated Growth Work for the USS HOWARD (DDG-83) requirements. This Growth Work CLIN amount represents 8.92 percent of the total proposed cost for

CLIN 0001.

YEN AMOUNT

Note - The U.S. Dollar amounts shown are for the Government administrative purposes only. FY25 Budget Exchange Rate of JPY145.7323 per USD1.00 applies.

FOB: Destination

MILSTRIP: N6275824RC38JC212371A01

PURCHASE REQUEST NUMBER: N6275824RC38JC212371A01

SIGNAL CODE: A

PSC CD: J999

NET AMT

Section C - Descriptions and Specifications

SECTION C

DESCRIPTIONS AND SPECIFICATIONS

C-1.0 Technical Description and Specifications: The work to be performed hereunder shall conform to the description of work/work specification described in SECTION B. The Contractor shall accomplish the contract requirements listed in ATTACHMENT (I) of Section J. Actual physical shipboard work shall begin and end in accordance with the dates listed in Section F of this solicitation.

C-2.0 U.S. NAVAL SHIP REPAIR FACILITY AND JAPAN REGIONAL MAINTENANCE CENTER

(SRF-JRMC) Yokosuka: The Contractors for SRF-JRMC Yokosuka shall accomplish all work in accordance with applicable NAVSEA Standard Items (NSIs) and SRF-JRMC Local Standard Items (LSIs).

Applicable versions for NSIs and LSIs coincide with the fiscal year in which the Chief of Naval Operations (CNO) availabilities to include Selected Repair Availability (SRA), Docking SRA (DSRA), and Extended DSRA (EDSRA); Continuous Maintenance (CM); Continuous Maintenance Availability (CMAV); Emergent Maintenance (EM); and Surface Incremental Availability (SIA) are scheduled for each ship. The same version continues to apply until the completion of each availability and maintenance regardless of crossing fiscal years.

CATEGORY-I items are invoked for all work resulting from this solicitation under the Master Agreement for Agreement for Repair and Alteration of Vessels; Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR). CATEGORY-II items are invoked only to the extent specifically indicated within Attachment (1). Ship repair contractors are also subject to the applicable laws and regulations of the Host Nation.

Category I NAVSEA Fiscal Year 2025 (FY25) Original Standard Items are applicable to all items without further reference. Category II NAVSEA FY25 Original Standard Items are applicable when invoked and/or referenced in individual Task Group Instruction (TGI) specified in ATTACHMENT (1). NSIs may be found at:

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

Category I U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) FY25 Local Standard Items (LSI), FY25 SRF- JRMC LSI is applicable to all items without further reference.

Category II SRF-JRMC FY25 LSI is applicable when invoked and/or referenced in individual TGIs specified in ATTACHMENT (1). FY25 LSIs and subsequent Changes have been distributed to all MSRA/ABR holders.

C-3.0 NON-NAVY OWNED CRANES:

Sections 11.1 and 11.2 of NAVSUPFLCYINST 4200.9 series are invoked for the incidental use of non- Navy owned cranes at Navy shore installations.

NAVSUP FLCY STANDARD CONTRACT TEXT “NON-NAVY OWNED CRANES”

CONTRACTOR AND OTHER NON-NAVY OWNED WEIGHT HANDLING EQUIPMENT

11.1 Contractor Operated Cranes (and Multi-Purpose Machines, Materials Handling Equipment (MHE) and

Construction Equipment When Used as Cranes to Lift Suspended Loads) and Rigging Equipment. Non- Navy-owned cranes, multi-purpose machines, MHE and construction equipment are frequently used on Navy property to lift suspended loads. Rigging equipment may be used with these machines or by itself in contractor weight handling operations. These cranes and equipment can be from a variety of sources and are generally incidental to construction contracts, ship repair contracts, demolition contracts, maintenance and other service contracts and deliveries of supplies and equipment. Numerous organizations, including tenant activities, ships, supply departments and Facilities engineering and Acquisition Division/Resident

Office in Charge of Construction (FEAD/ROICCs) have contracting authority and often the need for cranes is not anticipated when contract documents are written. The following requirements apply to any contracted work utilizing non-Navy-owned cranes (and multi-purpose machines, MHE and construction equipment used to lift loads suspended by rigging gear) and to all rigging equipment used in weight handling operations at a naval activity. These requirements do not apply to shipboard cranes or rigging equipment. These requirements also do not apply to: commercial truck mounted and articulating boom cranes used solely to deliver material and supplies where the lift consists of moving materials and supplies (not prefabricated components, structural steel or components of a systems-engineered metal building) from a truck or trailer to the ground; to cranes installed on mechanic’s trucks that are utilized solely in the repair of shore-based equipment; to cranes that enter the activity but are not used for lifting; nor other machines not used to lift loads suspended by rigging equipment. The Public Works Office (PRY33) is responsible for the oversight of all contractor cranes on bases within Commander, Fleet Activities Yokosuka in accordance with COMFEACTINST 11262.1B series. However, any Weight Handling Equipment (WHE) or crane accidents shall be reported in accordance with paragraphs 11.1.h and 11.1.i:

a. The contractor is required to comply with specific activity regulations pertaining to crane safety and operation (including allowable access routes and ground loading limitations) and to notify the PRY33 office, in advance, of any cranes entering the activity or of any multi-purpose machines, MHE or construction equipment that may be used in a crane-like application to lift suspended loads. The contractor shall comply with applicable - American National standard Institute (ANSI) or American Society of Mechanical Engineer (ASME) standards (e.g., ASME B30.5 for mobile cranes, ASME B30.22 for articulating boom cranes, ASME B30.3 for tower cranes, and ASME B30.8 for floating cranes, ASME B30.9 for slings, ASME B30.16 for overhead hoists, ASME B30.20 for below-the-hook lifting devices, ASME B30.21 for manually lever-operated hoists, ASME B30.26 for rigging hardware, ASME B30. ANSI/ITSDF B56.6 for rough terrain forklifts, ANSI A10.31 for digger derricks, ANSI A92.2 for aerial lifts/platforms with hoists or “sign trucks”, ASSE A10.22 for personnel hoists). For contractor-owned cranes, machines and rigging equipment at naval activities in foreign countries, the contractor-owned cranes, machines and rigging equipment shall comply with the appropriate host nation safety standards. For floating cranes and barge-mounted mobile cranes, require a third party certification from an Occupational Safety and Health Administration (OSHA) accredited organization (or a third party certification from a state accredited organization for those states with OSHA approved state plans), a load indicating device, a wind speed indicating device and a marine type list and trim indicator readable in one-half degree increments. Third party certification is not required for floating cranes and barge-mounted mobile cranes at Navy activities in foreign countries.

b. The contractor is required to provide a certificate of compliance from the contractor (appendix P, figure P-1) that the contractor-owned crane (or other machine if used to lift suspended loads) and the rigging equipment meet applicable OSHA and ANSI/ASME regulations (with the contractor citing which OSHA and ANSI/ASME regulations are applicable, e.g., cranes/multi-purpose machines used in cargo transfer shall comply with 29 CFR 1917; cranes/multi-purpose machines used in construction, demolition or maintenance shall comply with 29 CFR 1926; cranes/multi-purpose machines used in shipbuilding, ship repair or shipbreaking shall comply with 29 CFR 1915; aerial lifts/platforms (sign trucks) with hoists shall comply with 29 CFR 1926.453 and ANSI A92.2;

personnel hoists shall comply with 29 CFR 1926.552 and ASSE A10.22; slings shall comply with ASME B30.9; rigging hardware shall comply with ASME B30.26). For cranes (or other machines used to lift suspended loads) and rigging equipment at naval activities in foreign countries, the contractor shall certify that the crane (or other machine) and the rigging equipment conform to the appropriate host nation safety standards. The contractor shall also certify that all of its crane (or other machine) safety devices are enabled and functioning properly, that all personnel working on the naval activity job site have been trained to not stand under or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1, and that operators have been trained to not bypass safety devices (e.g., anti-two block devices, Load Moment Indicator’s) during lifting operations. The contractor-owned crane certifications is required to be available on the crane or in the contractor’s on-site office for rigging operations.

c. The contractor-owned mobile cranes, commercial truck mounted cranes and articulating boom cranes with Original Equipment Manufacturer (OEM) rated capacities of greater than 2000 pounds, require that the crane operator be designated as qualified by a source that qualifies crane operators (i.e., a union, a government agency or an organization that tests and qualifies crane operators). Proof of current qualification shall be provided. Operators of cranes used in construction at activities under US jurisdiction shall follow the qualification and certification requirements of 29 CFR 1926.1427. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR.

d. The contractor is required to certify (appendix P, figure P-1) that the crane operator is qualified and trained for the operation of the crane or machine to be used.

e. For multi-purpose machines, MHE and construction equipment used to lift loads suspended by rigging equipment, the contractor is required to provide proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment. Written approval from a qualified registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM’s approval. The contractor is required to demonstrate that the equipment is properly configured to make such lifts and is equipped with a load chart.

Note: MHE attachments covered by and used in accordance with NAVSEA SW023-AH- WHM-010 have been pre-approved for use with all MHE. These attachments are exempt from the OEM authorization requirement above.

f. The contractor is required to provide all hooks used on cranes, hoists, other machines and rigging gear shall have self-closing latches or the throat opening shall be "moused" (secured with wire, rope, heavy tape, etc.) or otherwise secured to prevent the attached item from coming free of the hook under a slack condition. The following exceptions apply and shall be approved by the contractor’s technical organization: items where the hook throat is fully obstructed and not available for manual securing;

and lifts where securing the hook throat increases the danger to personnel, such as forge shop, dip tank or underwater work.

g. The contractor is required to have a critical lift plan for each of the following lifts: lifts over 75 percent of the capacity of the crane, hoist or other machine (lifts over 50 percent of the capacity of a barge- mounted mobile crane’s hoists) at any radius of lift; lifts involving more than one crane, hoist or other machine; lifts of personnel (lifts of personnel suspended by rigging equipment from multi-purpose machines, MHE or construction equipment shall not be permitted); lifts made in the vicinity of overhead power lines (see subparagraph (7); erection of cranes; lifts of submerged or partially submerged objects (see exceptions in paragraph 10.4.1.e); lifts involving binding conditions; lifts of hazardous materials (see exceptions in paragraph 10.4.1.a); and lifts involving non-routine rigging or operation, sensitive equipment or unusual safety risks. The plan shall include the following as applicable:

(1) The size and weight of the load to be lifted, including crane (or other machine) equipment and rigging equipment that add to the weight. The OEM's maximum load capacities for the entire range of the lift shall also be provided.

(2) The lift geometry, including the crane (or other machine) position, boom length and angle, height of lift and radius for the entire range of the lift. Applies to both single and multiple-crane/machine lifts.

(3) A rigging plan, showing the lift points, rigging equipment and rigging procedures.

(4) The environmental conditions under which lift operations are to be stopped.

(5) For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR

1926.1431. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

(6) For barge mounted mobile cranes, barge stability calculations identifying crane placement/footprint; barge list and trim based on anticipated loading; and load charts based on calculated list and trim specific to the barge the crane is mounted on. The amount of list and trim shall be within the crane OEM’s requirements.

(7) For lifts in the vicinity of overhead power lines (i.e., if any part of the crane or other machine, including the fully extended boom of a telescoping boom crane or machine or the load could approach the distances noted in figure 10-3 during a proposed operation), the plan shall demonstrate compliance with 29 CFR 1926.1408-1411. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

h. The contractor shall notify the PRY33 office as soon as practical, but not later than four hours, after any WHE accident is identified in NAVFAC P-307 section 12. The contractor is required to secure the accident site and protect evidence until released by the PRY33 office. The contractor shall also notify FLCY Contracting Officer of the incident. The contractor shall conduct an investigation to establish the root cause(s) of any WHE accident, near miss or unplanned occurrence. Crane operations shall not proceed until the cause is determined and corrective actions have been implemented to the satisfaction of PRY33 office and/or the contracting officer. The contractor shall certify (appendix P, figure P-1) that the operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.

i. The contractor shall provide a report for an accident or near miss within 30 days to the BSV&E office and the contracting officer using the appropriate form provided in section 12 consisting of a summary of circumstances, an explanation of causes(s), photographs (if available) and corrective actions taken.

These notifications and reporting requirements are in addition to those promulgated by OPNAVINST

5100.23 and related command instructions.

j. The contractor shall certify (appendix P, figure P-1) that signal persons employed in construction work are qualified in accordance with 29 CFR 1926.1428. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

k. The contractor shall certify (appendix P, figure P-1) that the riggers are qualified to perform the work by either signing a statement of compliance, providing proof of successful completion of a rigging apprenticeship by a union or other organization providing apprenticeship training or proof of successful completion of training courses from a recognized source such as a trade union, a government agency or an organization that tests and qualifies riggers.

l. The following additional documentation is required for contracts involving tower cranes:

(1) Foundation design and requirements.

(2) Installation instructions.

(3) Assembly and disassembly instructions including climbing/jumping instructions if applicable.

(4) Operating manual, limitations and precautions.

(5) Periodic inspection and maintenance requirements. For tower cranes at Navy activities in foreign countries, the tower cranes shall comply with the appropriate host nation safety standards and industry consensus safety standards (e.g., EN or ISO standards).

m. The following additional requirements apply to contracts involving work on telecommunication towers or with personnel hoists on telecommunication towers:

(1) Base mounted drum hoists used in communication tower work shall comply with TIA-1019, TIA-

222G, ASME B30.7 and 29 CFR 1926.552 and 29 CFR 1926.553. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

(2) When used for hoisting personnel, base mounted drum hoists shall comply with OSHA

Instruction CPL 02-01-056; National Association of Tower Erectors standard “Base Mounted Hoist Mechanism Design Use Standard for Lifting Personnel While Working on Telecommunication Structures”; ANSI/ASSE A10.22; and AMSE B30.23 (or equivalent host nation safety standards for Navy activities in foreign countries).

(3) The use of a pickup truck or any other equipment besides a base mounted drum hoist for hoisting materials and/or personnel is prohibited.

(4) Rough-terrain forklifts, bulldozers and similar equipment may be utilized for towing and anchorage purposes of guys. The use of such equipment for trolley/tag and load lines is prohibited, with the exception of using construction equipment for the sole purpose of anchorage that will not be moved during operations.

(5) Rigging gear utilized in communication tower work shall comply with the applicable

ASME/OSHA standards. Operator, signal person and rigger qualifications shall be in accordance with OSHA standards and this section. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR or ASME standards.

n. For construction contracts, follow the Unified Facilities Guide Specification UFGS-01 35 26 and U.S.

Army Corps of Engineers EM-385-1-1 in lieu of paragraphs 11.1.a through 11.1.g, 11.1.j through 11.1.m and appendix P, figures P-1 and P-2.

11.2 Contracting Officer Responsibilities

a. The contracting officer will rely on PRY33 office technical expertise for oversight of all contractor-owned crane and rigging operations. Additionally, the PRY33 office to provide oversight of contractor accident investigations and corrective actions. The degree of oversight shall be based upon the risk to personnel and property; however, oversight shall be performed at least once and the minimum periodicity shall be not more than every 30 days. When critical lifts are involved, oversight periodicity shall be not more than every 14 days. Appendix P, figure P-2, provides a checklist that shall be used during oversight of contractor crane and rigging operations. Copies of appendix P, figure P-2, shall be kept on file for one year. Personnel performing oversight shall complete the Contractor Crane Awareness training course (see section 7) or the NAVFAC 40-hr Contract Hazard Awareness Training Course.

b. The PRY33 office will notify the contracting officer via email of any WHE or crane accident upon notification by the contractor. Additionally, the PRY33 office will consolidate the required documents and reports for the contracting officer concurrence and submission to the Navy Crane Center. Upon receipt of required reporting documents from the PRY33 office, the contracting officer shall notify the Navy Crane Center, by e-mail (m_nfsh_ncc_accident@navy.mil) of an accident involving a fatality, in-patient hospitalization, overturned crane, collapsed boom or any other major damage to the crane or adjacent property as soon as possible when notified by the contractor. For all other accidents, notify the Navy Crane Center as soon as practical but no later than three working days after the accident.

c. The PRY33 office will provide the contracting officer a copy of every accident and near miss report, regardless of severity, upon receipt from the contractor. These requirements are in addition to any notification and reporting requirements promulgated in OPNAVINST 5100.23 and command instructions. Upon receipt of required documents from the PRY33 office, the contracting officer shall sign all crane and rigging accident and near miss reports to indicate that they are satisfied that the contractor's investigation and corrective action are sufficient.

d. For construction contracts, the forms in U.S. Army Corps of Engineers EM-385-1-1 are acceptable in lieu of paragraph appendix P, figure P-2.

11.3 Host Activity Responsibilities. The host activity shall ensure that contracts contain the above requirements, concur with the contracting officer’s oversight plan, ensure that the oversight plan is being carried out and provide oversight of contractor accident and near miss investigations and corrective actions.

11.4 Other non-Navy-owned cranes and rigging equipment at Naval Activities.

11.4.1 Rented or leased cranes or other WHE Operated by Navy or Base Operation Support (BOS) contractors and cranes and rigging equipment owned and operated by BOS contractors and by contractors engaged in NAVSEA OP-5 operations in the United States and its territories. Any rented or leased cranes shall be inspected, load tested and certified to the requirements of section 4 prior to use (except for appendix E hook NDT requirements). Other WHE shall be inspected, tested and marked in accordance with section 14 requirements. For third party certified mobile cranes that cannot be load tested to the specified overload tests of this publication due to OEM restrictions or designs that prevent periodic overload tests, the cranes shall be down rated to 90 percent of the OEM's rated capacity (80 percent for non-mobile cranes) and tested to the requirements of this publication. For long term-leases (over 4 months) and for BOS contractor owned cranes, the maintenance and inspection requirements of section 3 and appendix E hook NDT requirements shall also apply. Additionally, an equipment history file in accordance with section 5, containing those documents required by sections 3 and 4 and their applicable appendices, shall be maintained on each crane. These history files shall be retained for one year after the end of the lease (seven years if the crane is involved in a crane or rigging accident). These requirements shall be included in applicable contracts. See paragraph 4.8 for third party certification requirements. Crane operators shall be licensed/qualified in accordance with the requirements of section 8 (this includes BOS contractor personnel). Crane operations and accident reporting shall be in accordance with sections 9, 10, and 12 (BOS contractor crane and rigging accidents shall be treated and reported as Navy crane and rigging accidents). Rigging equipment and usage practices shall be in accordance with section 14.

C-4.0 The following NAVSUP local text is hereby made part of the statement of work/performance work statement:

CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES,

SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR

PROTECTED HEALTH INFORMATION

Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.

APPLICABILITY

This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for: Physical access to DoD facilities or non-DoD facilities on behalf of DoD;

Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense, the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Commands, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").

Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.

START-UP PERIOD

All contractor resource onboarding documents must be submitted via the prime contractor. The prime contractor shall make all necessary preparations to assume full responsibility for productive performance of the performance start date.

Definition of “productive”:

a. Visit Authorization Request (VAR)

b. Contractor Information Sheet (CIS)

c. Completed EQIP (Electronic Investigation)

d. All contractor resource(s) must have an active JPAS profile.

e. Common Access Card (CAC)

Note (1): Invoicing by the contractor will begin as of the commencement of the performance period of services and no reimbursement will be paid by the government for efforts expended during the start-up period.

Note (2): Foreign Nationals are not allowed access to the functional/system side of Enterprise Resource Planning (ERP).

ACCESS TO DOD INFORMATION TECHNOLOGY (IT) SYSTEMS

In accordance with (IAW) Secretary of the Navy (SECNAV) M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M- 5510.30, includes positions which require access to sensitive information. Sensitive information includes information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information System Security Manager (ISSM)/Information Assurance Manager

(IAM).

Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation , which is a higher level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for

High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation.

When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s CSM and ISSM/IAM upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.

The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Cyber Awareness training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

INTERIM ACCESS

The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.

DENIAL OR TERMINATION OF ACCESS

The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.

CONTRACTOR’S SECURITY REPRESENTATIVE

The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS

FOR CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING

SENSITIVE DUTIES

Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non- Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:

SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product) Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements

Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period.

The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the CSM upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s ISSM/IAM. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.

The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Cyber Awareness training, and maintain a current requisite background investigation.

Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM);

Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract.

The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.

If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY

APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO OR

PERFORMING NON-SENSITIVE DUTIES

Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc.) and who require physical access to publicly accessible areas to performthose duties shall meet the following minimum requirements:

Must be either a U.S. citizen or a U.S. permanent resident with a minimum of 3 years of legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and

Must have a favorably completed National Agency Check with Written

Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:

SF-85 Questionnaire for Non-Sensitive Positions Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM

Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

* Consult with your CSM and ISSM/IAM for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.

EXPEDITING CONTRACT CLOSEOUT

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

Section E - Inspection and Acceptance

SECTION E

INSPECTION AND ACCEPTANCE

E-1.0 Inspection of the work accomplished hereunder shall be performed periodically by an authorized representative during the performance of the work and at the final inspection upon completion of the work. The representative will be identified in writing at time of contract award.

E-2.0 Quality Assurance: The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF- JRMC) Yokosuka, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-04. In addition to its rights under DFARS clause 252.217-7005 Inspection and Manner of Doing Work of the Master Agreement for Repair and Alteration of Vessels, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality management system and, as such, the Contractor shall not be entitled to progress payments for said work and material.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-11 Higher-Level Contract Quality Requirement DEC 2014 52.246-16 Responsibility For Supplies APR 1984

Section F - Deliveries or Performance

SECTION F

DELIVERIES OR PERFORMANCE

F-1.0 Time of Performance:

The Government has established execution dates for the following milestones and key events as outlined below:

EVENT DATE

Contractor Work Start Date 07 APR 2025 Contractor Work Completion Date 16 SEP 2025

The Contractor shall accomplish the work within the Period of Performance (POP) listed in each Task Group Instruction (TGI). A POP extension will only be issued if the POP for any individual TGI exceeds the original milestone POP end date or if the TGI has moved to a succeeding milestone date.

F-2.0 Place of Performance:

The performance of all work set forth in SECTION B shall be accomplished aboard the vessel at Yokosuka Naval Base.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 07-APR-2025 TO

16-SEP-2025

N/A SRF AND JRMC

GOVERNMENT REP

PSC 473 BOX 8

FPO AP 96349-0008

315-243-2150 FOB: Destination

N62758

0002 POP 07-APR-2025 TO

16-SEP-2025

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination N62758

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination JAN 1991

Section G - Contract Administration Data

SECTION G

CONTRACT ADMINISTRATION DATA

252.204-7006 Billing Instructions--Cost Vouchers MAY 2023

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

Invoice and Receiving Report (Combo)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving…