DATE: 11 February 2015
TO: ALL POTENTIAL OFFERORS
SUBJECT: RFP N62387-15-R-5415; Question & Answer #2
Q2. The calculations at Line 35 on the ‘Basic Pricing Data’ tab within all the pricing spreadsheets appear to be incorrect. The current calculation assumes total annual charter costs remain the same whether or not the ship is off hire and therefore shows a higher daily rate for each additional day the ship is estimated to be off hire.
We think the total annual charter cost is reduced by the days off hire and should be reflected as such in the total evaluated cost.
The current calculation is: (Total Daily Cost * 366)/(365 – Days Assumed Off Hire)
Should this calculation instead be as shown below?
(Number of Days On Hire * Total Daily Cost)
A2. The Government intends to leave the calculation as it currently is. This permits equitable price comparisons between proposals with different numbers of assumed days off hire.