Performance Based Statement of Work.pdf

PDF 178 KB Posted

Attached to
Intensity Correlation Imaging Study Federal contract opportunity
Solicitation number
N6227120Q1028
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Intensity Correlation Imaging Study, newest first.
File Type Posted
RFQ N6227120Q1028_Amendment A00001.pdf PDF
RFQ N6227120Q1028.pdf PDF
SSJ Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Office of Contracting and Logistics Management

Revised 04 Aug 17

Performance Based Statement of Work

Intensity Correlation Imaging Study

Adaptive Optics Center of Excellence for National Security

Department of Mechanical and Aerospace Engineering

Naval Postgraduate School

1.0 Background/Introduction:

The Naval Postgraduate School (NPS) provides graduate education to military officers of the uniformed services, Department of

Defense (DoD) civilians, and members of the international defense community. In conjunction with the primary mission of graduate education, NPS participates in research activities in support of the graduate education mission.

This requirement is in support of the Adaptive Optics Center of Excellence (AOCoE) for National Security in the Mechanical and Aerospace Engineering (MAE) Department at NPS. The AOCoE is a multi-disciplinary research center focusing on research and development of adaptive optics technology for national security applications. The AOCoE supports the NPS mission by performing DoD relevant research and educating NPS students on this important technology area.

2.0 Scope:

The AOCoE has a requirement for investigation in the Intensity Correlation Imaging (ICI) technique. ICI is a concept based on the intensity interferometer principle, which could provide images of satellites in geosynchronous orbit using ground-based equipment. The purpose of this study is to explore applications of massively multispectral photonic techniques and/or other advanced data processing approaches to enable lightweight, massively multispectral ICI (MMICI) concepts. The scope of the study includes defining a conceptual-level system implementation and estimation of its approximate size, weight, and power to understand the system requirements of the MMICI system. More detailed tasks are outlined in Section 3.0.

3.0 Tasks:

The contractor shall perform the following task(s) as follows:

3.1 System Architecture Study

Investigate different implementation strategies and detailed physical and functional architectures striving to understand the impact of architectural requirements on resulting complexity, size, weight, and likely performance of different implementation architectures of MMICI concepts and taking advantage of photonic integrated circuits in general. The study shall also include the implementation of MMICI concepts in the Segmented Planar Imaging Detector for Electro-optical Reconnaissance (SPIDER) architecture.

3.2 System Requirements Study

Investigate the system requirements for massively multispectral photonic techniques and/or other advanced data processing approaches. The data processing functions shall be as distributed as possible, at least to the extent of matching the spatial distribution of the optical elements, both to reduce the complexity of interconnection means as well as their added weight. Tradeoffs shall be identified and addressed as appropriate in order to gain insight into their likely impact on MMICI total weight and imaging performance as a function of number of spectral passbands and spatial distribution of the optical elements.

3.3 Study Report Documentation

This task includes to communicate and document status of the study through the kick-off, status reports, and interim and final reviews and final report. The task also includes kickoff meeting at the contractor’s site and a Final Program

Review at the Naval Postgraduate School.

4.0 Deliverables:

The contractor shall be responsible for providing the following deliverables:

4.1 Kickoff meeting material in power point slide format

4.2 Technical Status Report in Microsoft word or pdf format

4.3 Technical interchange meetings via telecon

4.4 Final review material in power point slide format

4.5 Final report in Microsoft word or pdf format

Performance Measurement - Quality Assurance Plan

Task Deliverable that will be inspected

Acceptable Quality

Level (AQL)

Method Frequency

3.1

4.2 and 4.5

Microsoft word document or pdf format.

Professional and academic quality suitable for presentation to research sponsor

Personal observation by COR and TPOC

At the time of delivery

3.2

4.2 and 4.5

Microsoft word document or pdf format.

presentation to research sponsor

3.3

4.1, 4.2, 4.3, 4.4, 4.5

Various technical presentation formats presentation to research sponsor

If performance falls below the AQL defined above, the Contracting Officer’s Representative (COR) shall document the instance(s), coordinate with the Contracting Officer and advise the Contractor. The Contractor will be requested to review the documentation and provide a written response on how performance will be corrected in the future. Re-performance of any work for failure to perform in accordance with the specified AQL or task requirement shall be completed at the Contractor’s own expense and at no additional cost to the Government.

5.0 Minimum Technical Requirements:

• Prior experience in advanced large aperture satellite imaging system architecture such as Segmented Planar Imaging

Detector for Electro-optical Reconnaissance (SPIDER)

• Available large aperture imager concept design that are applicable for this MMICI study

• The contractor must be highly knowledgeable in satellite imaging applications.

• The contractor must be a U.S. Citizen

6.0 Period of Performance: 6 months after award of a contract

7.0 Place of Performance: All the work to be performed at contractor’s site. Travel to Naval Postgraduate School in Monterey, California is authorized for the final review meeting.

8.0 Government Furnished Property: None

9.0 Work Week and Hours of Operation:

The Contractor shall provide services during normal working hours excluding federal holidays. Normal working hours are 0730-

1630, Monday through Friday, unless requirements dictate otherwise. Exceptions can be permitted by the COR upon request and at the COR’s discretion.

Following is a list of holidays observed by the Government.

Name of Holiday Time of Observance

New Year’s Day 1 January

Martin Luther King Jr. Day Third Monday in January

President's Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veteran's Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

If any of the above holidays occur on a Saturday or a Sunday, then such holiday shall be observed by the Contractor in accordance with the practice as observed by the assigned Government employees at the using activity

10.0 Travel:

Travel will be in accordance with the Joint Travel Regulations (JTR) and will be reimbursed by the government on an as-incurred basis.

Associated Task From/To Travel Location Duration of Trip How Many Travelers

3.3 Final Review To Monterey, CA 3 days TBD

11.0 Transition Activities:

It is essential to the Government that services required under this PWS are performed without interruption. At the conclusion of any performance period, including option periods or extensions, the services provided under this PWS may be awarded to another contractor. The contractor in place shall be required to assist in the transition activities.

12.0 Security Requirements:

Contractor personnel performing work under this contract must have access to ITAR material at time of the proposal submission, and must maintain the level of security required for the life of the contract. Contractor Key Personnel must be U.S. Citizens.

Contractors performing on this contract are required to familiarize themselves with, and participate in, the Naval Postgraduate

School’s OPSEC program. Must be familiar with and comply with NPSINST 3432.1B, the NPS Critical Information List, DoDI 5205.2E and their applicable references. The contractor will be required to complete OPSEC and counter-intelligence training within 30 days of beginning the work, or provide proof of OPSEC and counterintelligence training completed within the previous 12 months. The contractor may not publicly release any information about developmental work or curriculum at NPS without prior written approval from the Principal Investigator (PI).

13.0 Human Subject Research:

Contractor personnel performing work under this contract may not support, advise, or conduct research involving human subjects.

If at any time during the period of performance of this contract the tasks involve human subject research, the Contractor shall immediately notify the Contracting Officer. The contract must be amended in accordance with DoDD 3216.02 and DFAR

252.235-7004 in the event human subject research is proposed.

14.0 Privacy Act Statement:

“Pursuant to Title 5 United States Code 552a(m)(l), the contractor and all employees of the contractor working under this contract are required to comply with the requirements of 5 U.S.C. 552a (“The Privacy Act of 1974”).”

15.0 Identification of Contractor Employees:

In accordance with DFAR 211.106, there shall be a clear distinction between Government employees and service contractor employees. Service contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel. Contractor personnel will be required to obtain and wear badges or other visible identification for meetings with Government personnel to provide a clear distinction between service contractor employees and

Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

16.0 Non-Personal Services Statement:

Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will insure that employees properly comply with the performance work standards outlined in the SOW. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying

Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The

Government will control access to the facility and will perform the inspection and acceptance of the completed work.

17.0 SUPTXT 204-9400 Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information

Technology (IT) Systems or Protected Health Information (Jan 2017)

Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-

006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.

APPLICABILITY

This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties.

This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.

Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of

Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.

ACCESS TO DOD IT SYSTEMS

In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as

IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.

Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single

Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation, which is a higher level investigation than the

National Agency Check with Law and Credit (NACLC) described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information

Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s

Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System

Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor.”

The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date.

Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The

Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

INTERIM ACCESS

The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.

DENIAL OR TERMINATION OF ACCESS

The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.

CONTRACTOR’S SECURITY REPRESENTATIVE

The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security

Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR

CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES

Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non-Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a

FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or

IT-II position is required to complete:

• SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)

• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

• Original Signed Release Statements

Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the

Command Security Manager for guidance when reinvestigations are required.

Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Command’s Security

Manager upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s

Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy

Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.

The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information

Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security

Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel

Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.

If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit

Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the

Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR

CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES

Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc.) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:

• Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and

• Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:

• SF-85 Questionnaire for Non-Sensitive Positions

• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

• Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written

Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM

Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.