N62271/N6227119Q1100RFQ_N6227119Q1100_A00001.pdf
PDF 104 KB Posted
- Solicitation number
- N6227119Q1100
About this file
N62271/N6227119Q1100RFQ_N6227119Q1100_A00001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_N6227119Q1100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N622719Q1100 05/14/2019
REQUEST FOR QUOTE N6227119Q1100 A00001
**Response deadline extended to 05/27/2019 11am Pacific Time
This Request for Quote (RFQ), N6227119Q1100, for the Naval Postgraduate School (NPS), is prepared in accordance with the format in FAR 8 and supplemented with additional information included in this notice. This RFQ intends to result in a Firm Fixed Price (FFP) Purchase Order.
The Naval Postgraduate School has a requirement, to be awarded to one vendor, for alarm maintenance for its Secure Technology Battle Lab and Restricted Resources and Service area. NPS requires the vendor to conduct an initial inspection and maintenance, conduct semi-annual maintenance and provide 24x7x365 response to alarm casualties. Both spaces have the Digital Monitoring Products, Inc. Model XR500 and XR500N Command Processor. The award will be evaluated on a lowest-price technically acceptable basis. This is set-aside 100% for small business. The NAICS associated with this purchase is 561621, set aside for small business, size standard of $20.5 million dollars.
Schedule of Supplies
CLIN Description QTY Unit of Measure
Unit Price
Total Price
Alarm System Maintenance in accordance with
SOW.
Period of Performance: 06/01/2019 through 05/31/2020
YR
OPTION ONE
Alarm System Maintenance in accordance with
SOW.
Period of Performance: 06/01/2020 through 05/31/2021
OPTION TWO
Alarm System Maintenance in accordance with
SOW.
Period of Performance: 06/01/2021 through 05/31/2022
OPTION THREE
Alarm System Maintenance in accordance with
SOW.
Period of Performance: 06/01/2022 through 05/31/2023
OPTION FOUR
Alarm System Maintenance in accordance with
SOW.
Period of Performance: 06/01/2023 through 05/31/2024
Total Price
System for Award Management (SAM). Quoters must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.
http://www.sam.gov/
INSTRUCTIONS FOR SUBMISSION OF QUOTATION:
Contractor’s proposal shall be valid for thirty (30) days and include Volume 1, and 2. Each document should contain the following language on every page: SOURCE SELECTION SENSITIVE - SEE FAR PART 2.101 AND 3.104.
Note: A complete quote in response to this RFQ shall include the following:
a. A detailed narrative description of the proposed solution for the objective set forth in the Performance Based Statement of Work.
b. Proposed labor classifications and number of labor hours in correlation to the above Estimated Firm Fixed Price Schedule of Services.
c. No relocation or commuting travel expenses will be provided to the contractor. A breakdown of the proposed price shall be provided showing how the firm fixed price costs were calculated.
d. The total firm fixed price proposed for the purchase order, consisting of the elements proposed under items b. and c. All pricing information shall be provided in spreadsheet format so that calculations can be easily understood and checked.
e. A statement indicating whether you are proposing performance by one or more individuals who have previously worked for the federal government either as civilians or active duty military members, and if so, a second statement that to the best of your knowledge the individuals are eligible to perform the duties in this task order.
4. In addition to price/cost, the following factors will be used in evaluation of the quote/proposal to determine the quote/proposal that is in the best interest of the Government:
VOLUME I: TECHNICAL
The Technical Quote shall consist of the sections as detailed below. The contractor must use the same numbering scheme for the sections as the ones used below. The technical quote shall be divided into the sections for each of the below factors.
Factor 1 – Technical Approach
Factor 2 – Management Approach
Factor 3 – Quality of Personnel as referenced in Section 5.0 of the Performance Based SOW (Knowledge, Skills, and Abilities)/Experience. Contractor must submit a signed letter of commitment for each candidate.
Contractor Candidate Personnel must submit a signed statement of compliance and certification of the below statement:
I certify that I had no hand in the creation or refinement of this course development and delivery requirement and that I was not privy to any non-public information about the requirement before or after the point of solicitation. I further certify that I used no government resources in pursuit of my relationship with this proposing company for this or other government contracts. I also certify that I am eligible to perform the instructor duties in this requirement; no post-government-employment restrictions or other restrictions would prevent my performance. Additionally, I certify that should this proposing company be awarded this contract, I will renounce any status I may have as an NPS volunteer and relinquish any NPS office-space and other resources given to me on account of my volunteer status. Finally, I certify that no government resources (other than those provided pursuant to this contract) will be used in the performance of this requirement.
Contractor Management and Bid Preparation personnel must submit a signed statement of compliance and certification of the below statement
I certify that I had no hand in the creation or refinement of this requirement and that I was not privy to any non-public information about the requirement before or after the point of solicitation. I further certify that I used no government resources in pursuit of this requirement.
Factor 4 – Past Performance
VOLUME II: PRICE
The Government intends to make award based on initial quotes. Purchase order award will be made to the contractor submitting the quote determined to best meet the needs of the Government after consideration of all the evaluation factors, including price. The evaluation criteria will be Lowest Price Technically Acceptable.
a. Vendor shall provide a proposed schedule of services indicating the associated category, Hourly rates (fully burdened) and proposed hours.
b. Submitted in MS Word and / or Excel format; PDF is not acceptable. No page limitation.
c. Each page labeled with Contractor’s name and pages numbered in the following format: page ___ of ___.
***All questions regarding this requirement must be submitted via e-mail by May 20, 2019 to the below referenced point of contact.
Quotes shall be submitted via email no later than 11:00AM PST on 05/27/2019 to the below point of contact:
Contract Specialist: Julie Rips Phone: (831) 656-3580 E-mail: jrrips@nps.edu
This request for quote does not constitute a notice to proceed, nor shall it be considered as a commitment on the part of the government. Any costs incurred prior to award of the purchase order and any proposal preparation costs are not reimbursable.
Quote Submission: Shall include all Terms and Conditions proposed to the government.
Contractors are encouraged to include any Federal and/or Educational discounts
PAPERLESS CONTRACTING:
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
CLAUSES INCORPORATED BY REFERENCE
The following FAR / DFAR clauses are incorporated by reference:
52.204-99 System for Award Management Registration AUG 2012 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.212-1 Instructions to Offerors - Commercial Items OCT 2018 52.212-2 Evaluation – Commercial Items OCT 2014 52.212-3 Offeror Representations and Certifications – Commercial Items OCT 2018 52.232-1 Payments APR 1984 52.213-2 Invoices APR 1984 52.213-3 Notice to Supplier APR 1984 52.222-19 Child Labor--Cooperation with Authorities and Remedies MAR 2012 52.222-21 Prohibition of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-36 Affirmative Action for Workers w/ Disabilities OCT 2010 52.222-50 Combating Trafficking in Persons FEB 2009 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.223-18 Encouraging Contractor Policies to Ban Text Messaging while Driving AUG 2011 52.227-14 Rights in Data – General MAY 2014 52.227-17 Rights in Data – Special Works DEC 2007 mailto:jrrips@nps.edu
52.227-18 Rights in Data – Existing Works DEC 2007 52.232-1 Payments APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law For Breach Of Contract Claim OCT 2004 52.243-1 Changes—Fixed Price AUG 1987
52.249-1 Termination For Convenience Of The Government (Fixed Price) (Short Form) APR 1984
52.252-3 Alterations in Solicitation APR 1984 252.203-7000 Requirements Relating to Compensation of Former DOD Officials SEP 2011 525.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD Officials NOV 2011 252.204-7003 Control of Government Personnel Work Product APR 1992 252.204-7004 System for Award Management MAY 2013 252.204-7012 Safeguarding of Unclassified Controlled Technical Information NOV 2013 252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.215-7007 Notice of Intent to Resolicit JUN 2012 252.215-7008 Only One Offer JUN 2012 252.223-7001 Hazardous Warning Labels DEC 1991 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7000 Buy American Act – Balance of Payments Program Certificate JUN 2012 252.225-7001 Buy American Act and Balance of Payments Program DEC 2012 252.225-7002 Qualifying Country Sources as Subcontractors DEC 2012 252.225-7048 Export – Controlled Items JUN 2013 252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports JUN 2012 252.232-7006 Wide Area Workflow Payment Instructions JUN 2012 252.232-7010 Levies on Contract Payments DEC 2006 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea MAY 2002
All clauses shall be incorporated by reference in the order. Additional contract terms and conditions applicable to this procurement are:
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses: http://acquisition.gov/comp/far/ DFARS Clauses: http://www.acq.osd.mil/dpap/dars/dfars/ (End of clause) http://acquisition.gov/comp/far/ http://www.acq.osd.mil/dpap/dars/dfars/
Performance Based Statement of Work Alarm Maintenance for Secure Technology Battle Lab and Restricted Resources and Services
ITACS
Naval Postgraduate School
1.0 Background/Introduction
The Naval Postgraduate School (NPS) located in Monterey, CA supports the U.S. Navy, other U.S. military branches, Department of Defense (DoD) and other government agencies, and foreign military services with postgraduate education for personnel. Additionally, NPS provides significant classified research capabilities to the DoD and other government agencies.
The Dudley Knox Library (DKL) manages the Restricted Resources and Services (RRS) facility within the library and the Information Technology And Communications Services (ITACS) Department manages the Secure Technology Battle Lab (STBL) in Glasgow Hall. Both the RRS and STBL are classified spaces requiring physical presence or active alarms. Naval Region South West (NRSW) provides remote monitoring of the alarms in both spaces from San Diego, CA.
2.0 Scope
The scope of this requirement is to conduct an initial inspection and maintenance, conduct semi-annual maintenance and provide 24x7x365 response to alarm casualties. Both spaces have the Digital Monitoring Products, Inc. Model XR500 and XR500N Command Processor.
3.0 Tasks
The contractor shall perform the following task(s) as follows:
3.1 Conduct an initial post-award test and inspection of both alarm systems and make any necessary repairs.
3.2 Conduct semi-annual testing and inspections of both alarm systems and make any necessary repairs.
3.3 Coordinate with NPS and NRSW staff regarding the test/inspection schedule in order to ensure respective spaces are appropriately staffed and that security forces are not unnecessarily deployed.
3.4 Restore alarm systems to fully operational status after tests and inspections.
3.5 Provide 4hr, 24x7x365 response to alarm casualties.
4.0 Deliverables
The contractor shall be responsible for providing the following deliverables:
Performance Measurement - Quality Assurance Plan
Performance
Element Performance Requirement
Surveillance Method
Acceptable Quality Level (AQL)
Initial Test & Inspection
Test and inspect both alarm systems and make necessary repairs.
Direct observation by COR or designated
TPOC
Test and inspection complete within 30 days of task order award.
Any necessary repairs completed within 7 days of test/inspection completion.
Semi-annual Test & Inspection
Test and inspect both alarm systems twice annually and make necessary repairs.
Direct observation by COR or designated
TPOC
Test and inspection completed in accordance with mutually agreed upon schedule.
Any necessary repairs completed within 7 days of test/inspection completion.
Post Test/Inspection system restoration
Restore both alarm systems to fully operational status.
Direct observation by COR or designated
TPOC
Alarm systems 100% operational by close of business the same day test/inspection/repairs are completed.
Alarm Casualty Response Response to alarm casualties within 4hr of notification
Direct observation by COR or designated
TPOC
100% compliance
If performance falls below the AQL defined above, the Contracting Officer’s Representative (COR) shall document the instance(s), coordinate with the Contracting Officer and advise the Contractor. The Contractor will be requested to review the documentation and provide a written response on how performance will be corrected in the future. Re-performance of any work for failure to perform in accordance with the specified AQL or task requirement shall be completed at the Contractor’s own expense and at no additional cost to the Government.
5.0 Minimum Technical Requirements
Experience maintaining and repairing Security Command Executive Series alarm systems.
6.0 Period of Performance
Base: 06/01/19 - 05/31/20 Option 1: 06/01/20 - 05/31/21 Option 2: 06/01/21 - 05/31/22 Option 3: 06/01/22 - 05/31/23 Option 4: 06/01/23 + 05/31/24
7.0 Place of Performance
Dudley Knox Library and Glasgow Hall, Naval Postgraduate School, Monterey, CA 93943.
8.0 Government Furnished Property
Not applicable.
9.0 Work Week and Hours of Operation
The Contractor shall provide services during normal working hours excluding federal holidays. Normal working hours are 0800-1630, Monday through Friday, unless requirements dictate otherwise. Exceptions can be permitted by the COR upon request and at the COR’s discretion.
Following is a list of holidays observed by the Government.
Name of Holiday Time of Observance New Year’s Day 1 January
Martin Luther King Jr. Day Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
If any of the above holidays occur on a Saturday or a Sunday, then such holiday shall be observed by the Contractor in accordance with the practice as observed by the assigned Government employees at the using activity.
When responding to alarm faults or casualties after working hours, the Contractor shall contact the Command Duty Officer.
10.0 Travel
Travel expenses are not authorized.
11.0 Transition Activities
It is essential to the Government that services required under this PWS are performed without interruption. At the conclusion of any performance period, including option periods or extensions, the services provided under this PWS may be awarded to another contractor. The contractor in place shall be required to assist in the transition activities.
12.0 Security Requirements
Access to sensitive or classified information is not required.
Contractor Key Personnel must be U.S. Citizens. Contractors performing on this task order are required to familiarize themselves with, and participate in, the Naval Postgraduate School’s OPSEC program. Must be familiar with and comply with NPSINST 3432.1B, the NPS Critical Information List, DOD Directive 5205.02E and their applicable references. The contractor will be required to complete OPSEC and counter-intelligence training within 30 days of beginning the work, or provide proof of OPSEC and counterintelligence training completed within the previous 12 months. The contractor may not publicly release any information about developmental work or curriculum at NPS without prior written approval from the Principal Investigator
(PI).
13.0 Human Subject Research
Contractor personnel performing work under this contract may not support, advise, or conduct research involving human subjects. If at any time during the period of performance of this contract the tasks involve human subject research, the Contractor shall immediately notify the Contracting Officer. The contract must be amended in accordance with DoDD 3216.02 and DFAR 252.235-7004 in the event human subject research is proposed.
14.0 Privacy Act Statement
“Pursuant to Title 5 United States Code 552a(m)(l), the contractor and all employees of the contractor working under this contract are required to comply with the requirements of 5 U.S.C. 552a (“The Privacy Act of 1974”).”
15.0 Identification of Contractor Employees
In accordance with DFAR 211.106, there shall be a clear distinction between Government employees and service contractor employees. Service contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel. Contractor personnel will be required to obtain and wear badges or other visible identification for meetings with Government personnel to provide a clear distinction between service contractor employees and Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
16.0 Non-Personal Services Statement
Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will insure that employees properly comply with the performance work standards outlined in the PWS. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
17.0 SUPTXT 204-9400 Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information Technology (IT) Systems or Protected Health Information (Jan 2017)
Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08- 006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.
APPLICABILITY
This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties.
This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.
Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
ACCESS TO DOD IT SYSTEMS
In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.
Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation, which is a higher level investigation than the National Agency Check with Law and Credit (NACLC) described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s
Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor.”
The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date.
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non-Critical Sensitive [ADP/IT- II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
• SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)
• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
• Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Command’s Security Manager upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES
Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc.) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
• Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and
• Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
• SF-85 Questionnaire for Non-Sensitive Positions
• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
• Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM.
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
File details come from the government source that posted it.