SOR_-_Kromek_Final.pdf
PDF 30 KB Posted
- Attached to
- D3S Kromek radiological sensors Federal contract opportunity
- Solicitation number
- N6227118Q1228
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_N6227118Q1228.pdf | ||
| SSJ_Kromek_Sensors__Signed_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of Contracting and Logistics Management Revised 05 Mar 2015
Statement of Requirements
Center for Network Innovation and Experimentation (CENETIX) Information Sciences Department
Graduate School of Operational and Information Sciences Naval Postgraduate School (NPS)
1.0 Background/Introduction:
Within the NPS, the Information Sciences Department conducts masters’ degree instruction in network technology, management, and integration of various sensors and other devices into networks. The IS Department curricula include several classes that teach network integration and employ various devices in support thereof, such as radiological/nuclear sensors. The required sensors will be used in academic instruction, for student projects, and for thesis research concerning military command and control in a radiological environment. Hence, the need for small radiological sensors that can feed data into a network.
2.0 Minimal Technical Requirements/Salient Characteristics:
• Must be able to stream spectra to a SIGMA server.
• Must be an SPRD (spectroscopy-based personal radiation detector) that has network capabilities using Android smart phones
• Must be compact wearable detector spectrometer: CsI-based GR range
• Must be able to make activity analysis of radionuclide contamination
• Must be a CsI-based gamma and x-ray detector
• Must be a TN15 thermal neutron detector
• Must interact with spectroscopy software
• Must have real-time spectroscopy-based mapping ability
• Should be U.S. manufactured, for security considerations.
• Must enable data "pull" vs only data "push" by the operator.
Request delivery before 30 Sept 2018.
Require a minimum one-year warranty.
File details come from the government source that posted it.