RFQ_N6227118Q1145.pdf
PDF 301 KB Posted
- Attached to
- Amendment A0001 to RFQ
- Solicitation number
- N6227118Q1145
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6227118Q1145_Interpretation_Schedules.xls | XLS spreadsheet | |
| N6227118Q1145_Vendor_Questions_and_Answers.pdf | ||
| N6227118Q1145_RFQ_N6227118Q1145_A0001.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS/SOLICITATION
This is a COMBINED SYNOPSIS/SOLICITATION for commercial support services prepared in accordance with the information in FAR Part 13, Simplified Acquisition Procedures, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation on FedBizOpps; quotes are being requested and a written solicitation will not be issued.
Solicitation N6227118Q1145 is issued as a request for quotation (RFQ).
This RFQ seeks technical and price submissions for professional interpretation (English to/from French and Egyptian Dialect Arabic) to be done primarily on-site at NPS, Monterey, California. Some courses may be held off-campus, but within the immediate vicinity of NPS. Field visits will be off-site at various locations.
While discussions are not anticipated, the Government reserves the right to do so. Award will be Firm-Fixed Price (FFP) for the services detailed in the accompanying Statement of Work (SOW). Some travel is required in the performance; the contractor must provide a breakdown of any costs associated with performing the interpretation taskings on-site at NPS, Monterey, CA and off-site in accordance with section 10.0 of the Performance Based Statement of Work.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-69, effective August 1, 2013 and DFARS Change Notice 20130909.
This requirement is a total small business set aside
NAICS code 541930 Small business size standard $7.5 million dollars
Proposal Submissions: Quotes are due 6/18/2018 , at 03:00 p.m. PST
Quotes must be valid for 30 days. No facsimile quotes will be accepted. All quotes must be clearly marked with the RFQ Number.
Contractors are responsible for verifying receipt of their proposals to this office before offer due date and time.
DEADLINE FOR RFQ QUESTIONS: All questions regarding this requirement shall be submitted electronically to Ms. Kasie
Samaniego (primary), email: khsamani@nps.edu no later than 6/11/2018 at 3:00 p.m. PST to allow adequate time to prepare a response.
Email is the preferred method of submission. Quotes, together with the signed amendment(s), if applicable, must be submitted electronically to khsamani@nps.edu .
A successful bidder will have current employees with requisite clearance level or contingency hires with a signed letter of commitment (included in submission) and the requisite clearance level.
A successful bidder will have current employees with requisite clearance level or contingency hires with a signed letter of commitment (included in submission).
Interpreter Contractor Key Personnel must be U.S. Citizens.
NOTE: Personnel proposed are considered key personnel for purposes of clause SUPTXT237-9400 (1-92) - Substitution or Addition of Personnel (JAN 1992).The candidates proposed SHALL be the candidates performing the work. ALL substitutions shall be reviewed by the Technical Point of Contact (TPOC) and approved by the Contracting Officer; approval is required BEFORE substitution.
INSTRUCTIONS FOR SUBMISSION OF QUOTATIONS:
Contractor’s proposal shall be valid for thirty (30) days and include Volume I, and II. Each document should contain the following language on every page: SOURCE SELECTION SENSITIVE - SEE FAR PART 2.101 AND 3.104.
Volume I - Technical Submission - The vendor’s technical submission shall address the following factors in accordance with the PWS and this RFQ to be considered for award:
Factor 1 – Technical Approach
Factor 2 – Management Approach
Factor 3 – Key Personnel Qualifications - Resume to address section 5.0 of the SOW (Knowledge, Skills, and Abilities)/Experience. name/title/category skills/qualifications references maybe asked for upon request signed letter of commitment
Factor 4 – Past Performance
1. No more than two pages for each resume. MS Word and / or Excel format. PDF is not acceptable, except for the past performance form.
2. Resume shall have the name, title and category of the person on the cover but not within the resume. (3 page limit, not to include cover sheet); Vendors are free to provide a cross reference from the Government’s labor category to the vendor’s labor category.
3. Past performance does not count for the page limit. Submit one page, maximum, for each contract; submit a maximum of three contracts; use the attached form. The asterisk serve as bullets only, they have no other significance. If the vendor received any awards for outstanding work, coming in under budget, saving the Government money, etc., on the cited award, those should be listed here. If corrective action was required to bring the vendor into compliance with the terms and conditions of the cited award, those should be listed here.
A Technically Acceptable/Low Price source selection will be conducted. The Purchase Order resulting from this RFQ, if any, will be issued to the proposal conforming to the RFQ considering the evaluation criteria listed. Ratings of Pass / Fail will be used as evaluation standards.
Volume II – Price Submission – The vendor shall provide a proposed schedule of services/supplies with associated prices. Table provided below.
1. Vendor shall provide a proposed schedule of services indicating the associated labor category, hourly rates (fully burdened) and proposed hours. Labor category and hourly rate will be used for informational purpose only. Price evaluation includes no sub factors. The labor category, hourly rate and number of hours to perform the task will be evaluated for reasonableness.
2. Submitted in MS Word and / or Excel format; PDF is not acceptable. No page limitation.
3. Each page labeled with Contractor’s name and pages numbered in the following format: page ___ of ___.
Cautionary Note:
Offerors are advised that a proposal containing an unrealistically low price will be deemed indicative of a lack of technical understanding or a failure to comprehend the complexity and risks of the contract requirements and consequently may make the proposal unacceptable.
Schedule: Insert prices and other required information below.
Estimated Effort Schedule of Services
CLIN DESCRIPTION QTY
UNIT OF
ISSUE
UNIT
AMOUNT
Amount
Obligated
0001 French Interpretation in accordance with the Performance
Based Statement of Work Interpretation including off site to San Francisco/Alameda, California
2 Interpreters 9 Days
Firm Fixed Price for an estimated level of effort of 123 Hours
1 Each
0002 Egyptian Dialect Arabic in accordance with the Performance Based Statement of Work Interpretation including off site to
1Interpreter 10 Days
Firm Fixed Price for an estimated level of effort of 80 hours
1 Each
0003 Travel San Diego, California Offsite as referenced in CLIN 0002
In support of task 3.5.2 1 Interpreter Language: Egyptian, Dialect Arabic Travel dates TBD
1 Lot
Total Period of Performance from date of award until August 31, 2018
TOTAL PRICE:
For informational Purposes: Total Amount:
Labor Category:
52.212-2 Evaluation -- Commercial Items (JAN 1999):
(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The following factors shall be used to evaluate offers:
Technical
Contractors Technical Approach to accomplish the requirement as stated in the PWS.
Contractors Management Approach to accomplish the requirement as stated in the PWS.
Key Personnel Qualifications - Resume name/title/category skills/qualifications references maybe asked for upon request addresses Section 5 of the SOW, Candidates Minimum Technical Requirements have necessary skills for task and deliverable completion as referenced in the SOW signed letter of commitment
Past Performance Price
Procedures in FAR 13.106 are applicable to this procurement. While price will be a significant factor in the evaluation of offers, the final contract award will be based on the combination of the factors above.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced.
Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of a quote mailed or otherwise furnished to the successful quoter within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote's specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Technical and Contractual Questions Concerning This Solicitation - All questions concerning this procurement, either technical or contractual must be submitted in writing via e mail to the Contracting Office. No direct discussion between the technical representative and a prospective offeror will be conducted unless it is deemed necessary by the Contracting Officer. Questions shall be sent to the following point of contact: Kasie Samaniego, khsamani@nps.edu.
PERFORMANCE BASED STATEMENT OF WORK
Performance Based Statement of Work Professional Interpretation (English to/from French and Egyptian Dialect Arabic)
Defense Analysis Department - GSOIS Naval Postgraduate School
2.0 Background/Introduction:
Professional contractor personnel for interpretation services are needed to support the Naval Postgraduate School (NPS), during border security short courses for members of the Egyptian and Moroccan ministries.
3.0 Scope:
Contractor personnel shall provide verbal interpretation and limited written translation for multiple academic/military short courses in Monterey, California. Consecutive interpretation provided on-site in Monterey, California and off-site visits for multiple short courses, which are academic and military in nature. The scope of this requirement includes providing feedback on translation accuracy of instructional materials and accompanying students to interpret during field site visits. Students’ English-language skill levels may vary.
4.0 Tasks:
The contractor shall perform the following task(s) for each short course iteration:
3.1 Consecutive interpretation for specified dialect corresponding to the short course delivery and site visits. Contractor shall provide confirmation and interpreters’ credentials for base access at least two weeks prior to each course.
3.2 Translate course evaluation form and student responses (see attached example – up to 22 evaluations per course).
3.3 Provide feedback on accuracy and/or suggestions to translated print material. Contractor shall have access to course-specific material for familiarization no later than one week prior to each course.
3.4 Provide a written after-action summary of notable or general successes and/or challenges of the supported iteration, as well as suggestions for lessons learned to be applied for future iterations. Template will be provided for contractor/instructor use.
3.5 The contractor shall support the below iterations:
3.5.1 Provide two (2) contractor interpreter personnel to deliver consecutive interpretation for English-speaking NPS faculty who are presenting academic material regarding border security to French-speaking course participants. This course includes off-site visits to locations in the San Francisco area. Transportation will be provided. This course is currently scheduled from July 9, 2018 – July 20, 2018.
3.5.2 Provide one (1) contractor interpreter personnel to provide consecutive interpretation for English-speaking NPS faculty who are presenting academic material regarding border security to Egyptian (dialect)-speaking course participants. Please note that this requirement is for Egyptian Dialect Arabic, not for spoken Modern Standard Arabic (MSA). This course includes off-site visits in the San Diego, California area. Transportation will not be provided. This course is currently scheduled from July 30, 2018 – August 10, 2018.
5.0 Deliverables:
The contractor shall be responsible for providing the following deliverables for each iteration:
5.1 Language Interpretation
5.2 Translated Student Evaluation Form
5.3 Feedback on Translation of Print Material
5.4 After Action Report
Performance Measurement - Quality Assurance Plan
Task Deliverable that will be inspected Acceptable Quality
Level (AQL) Method Frequency
3.1 and 3.5
Topical understanding by each party of communication by the other
Interpretation should be specific, contextual, and any clarification questions should be answered
Personal observation at NPS by Technical Point of Contact and faculty leads; feedback from students
Daily
3.2 Comprehensive translation
of student evaluation questionnaire and responses to same
Translation should be timely, specific, and contextual
Personal inspection by NPS Technical Point of Contact
Once per iteration; submitted no more than five business days after conclusion of the course
3.3 Feedback on accuracy of
print material translation
Accurate summary of each module’s quality
Handwritten corrections on master binder of printed material
Once per iteration, left with NPS Technical POC at end of each course
3.4 Iteration after-action
summary
Completed template with assessment of interpretation experience and recommendations for future implementation
Personal inspection by NPS Technical Point of Contact
Once per iteration; submitted no more than five business days after conclusion of the course
If performance falls below the AQL defined above, the Contracting Officer’s Representative (COR) shall document the instance(s), coordinate with the Contracting Officer and advise the Contractor. The Contractor will be requested to review the documentation and provide a written response on how performance will be corrected in the future. Re-performance of any work for failure to perform in accordance with the specified AQL or task requirement shall be completed at the Contractor’s own expense and at no additional cost to the Government.
6.0 Minimum Technical Requirements:
Demonstrated track record of success in consecutive interpretation to and from English and French/Egyptian/Arabic Ability to read written English fluently and provide verbal translation Contractor interpretation personnel must be physically able to accompany groups on walking site visits over a variety of terrain (i.e., site visits include boarding marine vessels, walking through and around border control points, climbing minimal stairs, etc.).
Minimum of two (2) years’ experience as a professional interpreter All meetings are unclassified; no security clearance is required U.S. citizenship required
7.0 Period of Performance:
July 1, 2018 – August 30, 2018
Contractor shall provide interpretation from 8:00 a.m. – 4:30 p.m. on course days for each time period listed below, except for those days noted specifically otherwise. See attached general schedules for course agenda and timing.
8.0 Place of Performance:
Contractor will work onsite at the Naval Postgraduate School, with their primary place of work being in Root Hall, Room 111-B, Naval Postgraduate School, Monterey, CA 93943. Some meetings may occur in other buildings and offices elsewhere on campus. Some courses may be held off-campus, but within the immediate vicinity of NPS. Field visits will be off-site at various locations (see list, above).
9.0 Government Furnished Property:
The government shall provide appropriate classroom space to perform tasks at NPS. Any Government-provided property and information shall be used for official Government business only. Any applicable documents that are authorized for use in performance of these services shall be provided, in accordance with security and contract terms and conditions.
10.0 Work Week and Hours of Operation:
The Contractor shall provide services during normal working hours excluding federal holidays. Normal working hours are 0730- 1630, Monday through Friday, unless requirements dictate otherwise. Exceptions can be permitted by the COR upon request and at the COR’s discretion.
Following is a list of holidays observed by the Government.
Name of Holiday Time of Observance
New Year’s Day 1 January Martin Luther King Jr. Day Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
If any of the above holidays occur on a Saturday or a Sunday, then such holiday shall be observed by the Contractor in accordance with the practice as observed by the assigned Government employees at the using activity
11.0 Travel:
Travel will be in accordance with the Joint Travel Regulations (JTR) and will be reimbursed by the government on an as-incurred basis.
Associated Task From/To Travel Location
Duration of Trip How Many Travelers
3.5.1 Language - French
Monterey/Alameda
11 hours - gov’t bus departs Monterey at 0630; returns at 1730/1800 No overnight required Government will supply transportation
3.5.2 Language – Egyptian
Dialect Arabic Monterey/San Diego
3 days - interpretation from airport arrival on Wednesday through NLT 1700 on Friday; Contractor travel from Monterey to San Diego on Wednesday must be on the same flight as participants (Alaska Air flight 2437).
Gov’t air transportation not provided Bus transportation provided in San Diego
12.0 Security Requirements:
Unclassified. Contractor Personnel must be U.S. Citizens or possess a SECNAV waiver.
13.0 Privacy Act Statement:
“Pursuant to Title 5 United States Code 552a(m)(l), the contractor and all employees of the contractor working under this contract are required to comply with the requirements of 5 U.S.C. 552a (“The Privacy Act of 1974”).”
14.0 Identification of Contractor Employees:
In accordance with DFAR 211.106, there shall be a clear distinction between Government employees and service contractor employees. Service contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel. Contractor personnel will be required to obtain and wear badges or other visible identification for meetings with Government personnel to provide a clear distinction between service contractor employees and Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
15.0 Non-Personal Services Statement:
Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will insure that employees properly comply with the performance work standards outlined in the SOW. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
16.0 SUPTXT 204-9400 Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information
Technology (IT) Systems or Protected Health Information (Jan 2017)
Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08- 006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.
APPLICABILITY
This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties.
This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.
Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
ACCESS TO DOD IT SYSTEMS
In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.
Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation, which is a higher level investigation than the National Agency Check with Law and Credit (NACLC) described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor.”
The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date.
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non-Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product) Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Command’s Security Manager upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR
CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES
Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc.) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
SF-85 Questionnaire for Non-Sensitive Positions Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission) Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA):
The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract Administrative Support via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) S, Utilities ONLY;
(5) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
Contract Administration Plan (CAP) for Fixed Price Contracts:
In order to expedite the administration of this contract, the following delineation of duties is provided. The names, addresses and phone numbers for these offices or individuals are included elsewhere in the contract award document. The office or individual designated as having responsibility should be contacted for any questions, clarifications or information regarding the administration function assigned.
1. The Procuring Contract Office (PCO) is responsible for:
a. All pre-award duties such as solicitation, negotiation and award of contracts.
b. Any information or questions during the pre-award stage of the procurement.
c. Freedom of Information inquiries.
d. Changes in contract terms and/or conditions.
e. Post award conference.
2. The Contract Administration Office (CAO) is responsible for matters specified in FAR 42.302, except those areas otherwise designated as the responsibility of the Contracting Officer's Representative (COR) or someone else herein.
3. The paying office is responsible for making payment of proper invoices after acceptance is documented.
4. The Contracting Officer's Representative (COR) is responsible for interface with the contractor and performance of duties such as those set forth below. It is emphasized that only the PCO/CAO has the authority to modify the terms of the contract. In no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the government. If in the opinion of the contractor an effort outside the scope of the contract is requested, the contractor shall promptly notify the PCO in writing. No action may be taken by the contractor unless the PCO or CAO has issued a contractual change. The COR duties are as follows:
a. Technical Interface
(1) The COR is responsible for all Government technical interface concerning the contractor and furnishing technical instructions to the contractor. These instructions may include: technical advice/recommendations/clarifications of specific details relating to technical aspects of contract requirements; milestones to be met within the general terms of the contract or specific subtasks of the contract; or, any other interface of a technical nature necessary for the contractor to perform the work specified in the contract or order. The COR is the point of contact through whom the contractor can relay questions and problems of a technical nature to the PCO.
(2) The COR is prohibited from issuing any instruction which would constitute a contractual change. The COR shall not instruct the contractor how to perform. If there is any doubt whether technical instructions contemplated fall within the scope of work, contact the PCO for guidance before transmitting the instructions to the contractor.
b. Contract Surveillance
(1) The COR shall monitor the contractor's performance and progress under the contract. In performing contract surveillance duties, the COR should exercise extreme care to ensure that he/she does not cross the line of personal services. The COR must be able to distinguish between surveillance (which is proper and necessary) and supervision (which is not permitted).
Surveillance becomes supervision when you go beyond enforcing the terms of the contract. If the contractor is directed to perform the contract services in a specific manner, the line is being crossed. In such as situation, the COR's actions would be equivalent to using the contractor's personnel as if they were government employees and would constitute transforming the contract into one for personal services.
(2) The COR shall monitor the contractor's performance to see that inefficient or wasteful methods are not being used. If such practices are observed, the COR is responsible for taking reasonable and timely action to alert the contractor and the PCO to the situation.
(3) The COR will take timely action to alert the PCO to any potential performance problems. If performance schedule slippage is detected, the COR should determine the factors causing the delay and report them to the PCO, along with the contractor's proposed actions to eliminate or overcome these factors and recover the slippage. Once a recovery plan has been put in place, the COR is responsible for monitoring the recovery and keeping the PCO advised of progress.
(4) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a Contractor Performance Assessment Report (CPAR) in the CPARS Automated Information System (AIS). The initial CPAR, under an eligible contract, must reflect evaluation of at least 180 days of contractor performance. The completed CPAR, including contractor comments if any, (NOTE: contractors are allowed 30 days to input their comments) should be available in the CPARS AIS for reviewing official (PCO) review no later than 270 days after start of contract performance. Subsequent CPARs covering any contract option periods should be ready at 1-year intervals thereafter.
c. Invoice Review and Approval/Inspection and Acceptance
(1) The COR is responsible for quality assurance of services performed and acceptance of the services or deliverables. The COR shall expeditiously review copies of the contractor's invoices or vouchers, certificate of performance and all other supporting documentation to determine the reasonableness of the billing. In making this determination, the COR must take into consideration all documentary information available and any information developed from personal observations.
(2) The COR must indicate either complete or partial concurrence with the contractor's invoice/voucher by executing the applicable certificate of performance furnished by the contractor.
(3) The COR will provide the PCO and the CAO with copies of acceptance documents such as Certificates of Performance.
(4) Upon completion of all services under the contract, the COR shall work with the Contractor to obtain and execute a final invoice no more than 60 days after completion of contract performance. The COR shall ensure that the invoice is clearly marked as a “Final Invoice.”
d. Administrative Duties
(1) The COR is responsible for taking appropriate action on technical correspondence pertaining to the contract and for maintaining files on each contract. This includes all modifications, government cost estimates, contractor invoices/vouchers, certificates of performance, DD 250 forms and contractor's status reports.
(2) The COR shall maintain files on all correspondence relating to contractor performance, whether satisfactory or unsatisfactory, and on trip reports for all government personnel visiting the contractor's place of business for the purpose of discussing the contract.
(3) The COR must take prompt action to provide the PCO with any contractor or technical code request for change, deviation or waiver, along with any supporting analysis or other required documentation.
e. Government Furnished Property. When government property is to be furnished to the contractor, the COR will take the necessary steps to ensure that it is furnished in a timely fashion and in proper condition for use. The COR will maintain adequate records to ensure that property furnished is returned and/or that material has been consumed in the performance of work.
f. Security. The COR is responsible for ensuring that any applicable security requirements are strictly adhered to.
g. Standards of Conduct. The COR is responsible for reading and complying with all applicable agency standards of conduct and conflict of interest instructions.
h. Written Report/Contract Completion Statement.
(1) The COR is responsible for timely preparation and submission to the PCO, of a written, annual evaluation of the contractors performance. The report shall be submitted within 30 days prior to the exercise of any contract option and 60 days after contract completion. The report shall include a written statement that services were received in accordance with the Contract terms and that the contract is now available for close-out. The report shall also include a statement as to the use made of any deliverables furnished by the contractor. For contracts where delivery orders are issued, one consolidated report which addresses all actions under the contract may be submitted.
(2) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a final Contractor Performance Assessment Report (CPAR) in the CPARS with 30 days of contract completion.
(3) The COR is responsible for providing necessary assistance to the Contracting Officer in performing Contract Close-out in accordance with FAR 4.804, Closeout of Contract Files.
5. The Technical Assistant (TA), if appointed, is responsible for providing routine administration and monitoring assistance to the COR. The TA does not have the authority to provide any technical direction or clarification to the contract. Duties that may be performed by the TA are as follows:
a. Identify contractor deficiencies to the COR.
b. Review contract/delivery order deliverables, recommend acceptance/rejection, and provide the COR with documentation to support the recommendation.
c. Assist in preparing the final report on contractor performance for the applicable contract/delivery order in accordance with the format and procedures prescribed by the COR.
d. Identify contract noncompliance with reporting requirements to the COR.
e. Evaluate the contractor's proposals for specific delivery orders and identify, for the COR, any potential problems, areas of concern, or issues to be discussed during negotiations.
f. Review contractor status and progress reports, identify deficiencies to the COR, and provide the COR with recommendations regarding acceptance, rejection, and/or Government technical clarification requests.
g. Review invoices for the appropriate mix of types and quantities of labor, materials, and other direct costs, and provide the COR with recommendations to facilitate COR certification of the invoice.
h. Provide the COR with timely input regarding technical clarifications for the statement of work, possible technical direction to provide the contractor, and recommend corrective actions.
i. Provide detailed written reports of any trip, meeting, or conversation to the COR subsequent to any interface between the TA and contractor.
PROVISIONS AND CLAUSES:
The following FAR/DFARS provisions and clauses apply to this acquisition and will be incorporated into any resultant purchase order.
52.202-1 Definitions (JAN 2012) 52.203-16 Preventing Personal Conflicts of Interest (DEC 2011) 52.204-7 System for Award Management (OCT 2016)
52.204-10 Reporting Executive compensation and First-Tier Subcontract Awards (OCT 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government’ Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment
(DEC 2010)
52.222-3 Convict Labor (JUN 2003) 52.222-19 Child Labor—Cooperation with Authorities and Remedies (OCT 2016) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (OCT 2016) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging while Driving (AUG 2011) 52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.232-33 Payment by Electronic Funds Transfer—Central Contractor Registration (OCT. 2003) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.243-7 Notification of Changes (APR 1984) 52.252-1 Solicitation Provisions Incorporated by Reference), http://farsite.hill.af.mil/ and www.acq.osd.mil
(FEB 1998)
52.252-2 Clauses Incorporated by Reference http://farsite.hill.af.mil/ and www.acq.osd.mil (FEB 1998) 52.252-3 Alterations in Solicitation (APR 1984)
The following DFARS provisions and clauses apply to this acquisition and are incorporated by reference. If the offeror has completed any of the following provisions listed in this paragraph electronically as part of its annual representations and certifications at https://www.acquisition.gov, the offeror they are to indicated in the submitted quote, there is no need to complete these provisions again for a this solicitation.
252.203-7000 Requirements Relating to Compensation of Former DoD Officials (SEP 2011) 525.203-7002 Requirement to Inform Employees of Whistleblower Rights (SEP 2013) 252.203-7005 Representation Relating to Compensation of Former DoD Officials (NOV 2011) 252.204-7003 Control Of Government Personnel Work Product (APR 1992) 252.204-7004 Alternate A, System For Award Management (MAY 2013) 252.215-7007 Notice of Intent to Resolicit (JUN 2012) 252.215-7008 Only One Offer (JUN 2012) 252.223-7001 Hazardous Warning Labels (DEC 1991) 252.223-7008 Prohibition of Hexavalent Chromium (JUN 2013) 252.225-7000 Buy American—Balance of Payments Program Certificate (JUN 2012) 252.225-7001 Buy American and Balance of Payments Program (DEC 2012 252.225-7048 Export – Controlled Items (JUN 2013) 252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports (JUN 2012) 252.232-7006 Wide Area Workflow Payment Instructions (JUN 2012) 252.232-7010 Levies on Contract Payments (DEC 2006) 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (JUN 2012) 252.244-7000 Subcontracts for Commercial Items (JUN 2013) 252.247-7023 Transportation of Supplies by Sea (MAY 2002)
DFAR 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) Definition. “Contracting officer's representative” means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
(End of clause)
DFAR 252.204-7000 DISCLOSURE OF INFORMATION (DEC 1991)
(a) The Contractor shall not release to anyone outside the Contractor's organization any unclassified information, regardless of medium (e.g., film, tape, document), pertaining to any part of this contract or any program related to this contract, unless—
(1) The Contracting Officer has given prior written approval; or
(2) The information is otherwise in the public domain before the date of release.
(b) Requests for approval shall identify the specific information to be released, the medium to be used, and the purpose for the release.
The Contractor shall submit its request to the Contracting Officer at least 45 days before the proposed date for release.
(c) The Contractor agrees to include a similar requirement in each subcontract under this contract. Subcontractors shall submit requests for authorization to release through the prime contractor to the Contracting Officer.
AUTHORIZED CHANGES ONLY BY CONTRACTING OFFICER
The Contractor shall not comply with any order, direction or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.