Pre_Solicitation_Notice_CH53K_CNI_PTT_Update_5.9.2023.pdf
PDF 555 KB Posted
- Attached to
- UNITED STATES MARINE CORPS CH-53K COMMUNICATION, NAVIGATION, AND INSTRUMENTATION PART TASK TRAINER (CNI PTT)
- Solicitation number
- N6134023CH53KCNI
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre_Solicitation_Notice_CH53K_CNI_PTT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-AWARD SYNOPSIS – PART 2 (UPDATE)
DATE ISSUED: 5/9/2023
PSC CODE (4 DIGITS): 6910 (Training aids & devices)
NAICS CODE: 333310 (Other Commercial and Service Industry Machinery Manufacturing)
TITLE: UNITED STATES MARINE CORPS CH-53K COMMUNICATION, NAVIGATION, AND
INSTRUMENTATION CH-53 COMMUNICATION, NAVIGATION AND INSTRUMENTATION
(CNI)
SOLICITATION NUMBER (NO DASHES): N6134023R0001
CLOSING DATE (MMDDYYYY)/TIME: 05232023/1700 EST
SET ASIDE CODE: Not applicable
CS CONTACT NAME & EMAIL: Xavier Rojas, xavier.e.rojas.civ@us.navy.mil
PCO CONTACT NAME & EMAIL: Alana Nunez-Bennett, alana.t.nunez-bennett.civ@us.navy.mil
INTRODUCTION: The Naval Air Warfare Center Training Systems Division (NAWCTSD) intends to award a Firm Fixed-Price sole source contract for the design, fabrication, installation, test and delivery of the Communication, Navigation and Instrumentation Maintenance Trainer (Device 11B112) to Sikorsky
Aircraft Corporation (a Lockheed Martin Company). For small business contract opportunities, please reach out to Melissa Toffey Melissa.toffey@lmco.com 203-381-6437.
The anticipated statutory authority permitting Other Than Full and Open Competition is 10 U.S.C.
3204(a)(1), Only one responsible source and no other supplies or services will satisfy agency requirements because NAWCTSD does not currently possess the electrical or mechanical drawings and schematics of the CH-53K platform’s systems and subsystems.
PURPOSE: This notice is not a request for competitive proposals. It is a notice in accordance with FAR
5.201 outlining the Government’s intent to contract on a sole source basis with Sikorsky Aircraft
Corporation.
ANTICIPATED SCOPE OF EFFORT: This will be a new Delivery Order to be issued under the existing Basic Ordering Agreement (BOA) N0001919G0029. This maintenance trainer device will be located at the Center for Naval Aviation Technical Training Marine Unit (CNATT MARU) facilities
Building AS235 at the Marine Corps Air Station (MCAS) New River, Jacksonville, North Carolina (NC).
The anticipated CLIN structure is provided in the table below:
SCHEDULE: The Government anticipates a target contract award date during the 1st Qtr. FY25, and will require delivery 24 months after contract award (1st Qtr. FY27).
CLIN/SLIN Description
Base /
Option
To be Exercised
NLT:
Cost
Type
0001 CH-53K CNI Trainer Device 11B112 Base Contract Award FFP
CH-53K CNI Trainer Device 11B112
Technical Data and Information Base Contract Award NSP
CH-53K CNI Trainer Device 11B112
Interim Contractor Support (ICS) Option
1 Month Before
RFT FFP
CH-53K CNI 11B112 Provisioned
Items Order (PIOs) Option
As needed after
Contract Award FFP
CH-53K CNI 11B112 Administrative
Information Option NSP mailto:xavier.e.rojas.civ@us.navy.mil mailto:alana.t.nunez-bennett.civ@us.navy.mil mailto:Melissa.toffey@lmco.com
LIST OF ATTACHMENTS (IF APPLICABLE): N/A
PLACE(S) OF PERFORMANCE: The preponderance of the effort can be completed at the contractor’s facility with installation, integration and final testing to be conducted at the trainer site. The anticipated delivery site of the new training device is MCAS New River, Jacksonville, NC.
DISCLAIMER: THIS PRE-AWARD NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. THIS
IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND
SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN
ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO
AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE
AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY
INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS
STRICTLY VOLUNTARY.
File details come from the government source that posted it. Updated .