N6134021R0061

Section A - Solicitation/Contract Form

A.1.

A.1. GOVERNING TERMS AND CONDITIONS

The issuance of this order is under the authority of the multiple award indefinite-delivery indefinite-quantity Training Systems Contract IV (TSC IV). In accordance with Clause 252.216-7006 of that contract, this order is subject to the terms and conditions of that same contract, which this order supplements to the extent specifically provided.

A.2.

A.2. DEFINITIONS

(a) Unless otherwise defined, each of the following terms has the assigned meaning when used in this order:

(1) “APT” means Aircrew Procedures Trainer.

(2) “AOE” means After Option Exercise

(3) “CDRL” means Contract Data Requirements List.

(4) “CLIN” has the meaning assigned to the term “line item” under FAR 2.101 as of the date of this order.

(5) “Contract Specialist” means [TBD], whose contact information is as follows:

NAWCTSD

Attn: [TBD] 12211 Science Drive Orlando, FL 32826-3224 E-mail: [TBD] Phone: [TBD]

(6) “FFP” means firm-fixed-price.

(7) “FTD” means Flight Training Device.

(8) “IAW” means in accordance with.

(9) “ICS” means interim contractor support.

(10) “N/A” means not applicable.

(11) “NSP” means not separately priced.

(12) “Procuring Contracting Officer” or “PCO” generally means Reagan Gill, whose contact information is as follows, though other authorized contracting officers may carry out corresponding contract actions from time to time:

NAWCTSD

Attn: Reagan Gill 12211 Science Drive Orlando, FL 32826-3224 E-mail: reagan.gill@navy.mil Phone: 407-380-4145

(13) “PIO” means provisioned items order.

(14) “TBD” means to be determined.

(15) “WST” means Weapon System Trainer.

(b) Other Definitional Standards.

(1) Exhibit and Attachment References. Unless otherwise provided, any reference to an exhibit or an attachment means an exhibit or attachment of this order.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

CH-53E WST 2F174-2 UPGRADE

FFP

The Contractor shall upgrade the CH-53E WST 2F174-2 IAW Attachment 1.

This CLIN implements CLIN 2010 of TSC IV.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

TECHNICAL DATA AND INFORMATION

The Contractor shall deliver technical documentation and information for the CH-53E WST 2F174-2 IAW Attachment 1 and Exhibits A, Q, R, S and T. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
CH-53E WST 2F174-2 ICS

FFP

The Contractor shall provide ICS for CH-53E WST 2F174-2 IAW Attachment 1. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

CH-53E APT 2F190-2 UPGRADE

The Contractor shall upgrade the CH-53E APT 2F190-2 IAW Attachment 1.

This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

TECHNICAL DATA AND INFORMATION

The Contractor shall deliver technical documentation and information for the APT 2F190-2 IAW Attachment 1 and Exhibits G, W, X, Y, and Z. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
CH-53E APT 2F190-2 ICS

FFP

The Contractor shall provide ICS for CH-53E APT 2F190-2 IAW Attachment 1. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each
OPTION
CH-53E FTD 2F239 UPGRADE

FFP

The Contractor shall upgrade the CH-53E FTD 2F239 IAW Attachment 1.

This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
TECHNICAL DATA AND INFORMATION

FFP

The Contractor shall deliver technical documentation and information for the CH-53E FTD 2F239 IAW Attachment 1 and Exhibits N, AC, AD, AE and AF. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
CH-53E FTD 2F239 ICS

FFP

The Contractor shall provide ICS for CH-53E FTD 2F239 IAW Attachment 1. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

PIOs

This is an informational CLIN. It facilitates the issuance of one or more sub-CLINs for PIOs made by and at the discretion of the Government. Any orders issued by the Government under this CLIN are subject to the authority of Attachment 1 along with Clauses 5252.211-9506, 5252.217-9500, and 5252.217-9506. This CLIN implements CLIN 2010 of the TSC IV.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

ADMINISTRATIVE INFORMATION

The Contractor shall deliver administrative information IAW Attachment 1 and Exhibit B. This CLIN implements CLIN 2010 of TSC IV.

NET AMT

Section C - Descriptions and Specifications

C.1. STATEMENT OF WORK (SOW) INCORPORATION (APR 2021)

Attachment 1, as amended from time to time, is incorporated here by reference with the same force and effect as if set forth in full text.

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9509INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005)
The Contractor's Technical Proposal Number [TBD at time of award], dated [TBD at time of award], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification" but the Government's Specification shall take precedence over the Contractor's technical proposal.

Section D - Packaging and Marking

5252.247-9509 PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998)

(a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract.

(b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows:

See Section F, “DELIVERY INFORMATION,” for the relevant SHIP TO ADDRESS designated for the CLIN(s) to which a given delivery applies.

(c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth.

(d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor.

5252.247-9514TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government
1002
Destination
Government
Destination
Government
1003
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government
2002
Destination
Government
Destination
Government
2003
Destination
Government
Destination
Government
8000
N/A
N/A
N/A
N/A
9000
Destination
Government
Destination
Government
5252.246-9512INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by NAWCTSD (UIC N61340).
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9513INSPECTION AND ACCEPTANCE OF TRAINING DEVICES (NAVAIR) (OCT 2007)
Inspection of Device 2F174-1, 2F174-2, 2F190-1, 2F190-2, and 2F239 shall be accomplished in accordance with the Specification/Statement of Work entitled as shown in Attachments 2 and 1, respectively, and the Government approved Contract Data Requirements List (CDRL), DD Form 1423, data item entitled “Test Procedures and Test/Inspection Reports (TP and TIR).” Any Government inspection/acceptance to be conducted in the contractor’s facility, will be performed by the Administrative Contracting Officer’s quality assurance representative with support of NAWCTSD technical personnel. Final inspection to be performed at the device delivery site will be directed and witnessed by the technical representative of the Procuring Contracting Officer (PCO). Final acceptance of this Contract Line Item will be evidenced by signature of the PCO or his duly authorized representative on a DD Form 250, Material Inspection and Receiving Report.
5252.246-9514INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled “NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form.” The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
31-OCT-2025
1
NAWCTSD ISEO

MAX HOANG

8656 EDSON RD BLDG 8656, MCAS MIRAMAR

SAN DIEGO CA 92145

858-577-7838

N61340

0002
30-SEP-2024
1
(SAME AS PREVIOUS LOCATION)

N61340

0003
POP 01-NOV-2025 TO

30-APR-2026

N/A
(SAME AS PREVIOUS LOCATION)

N61340

1001
31-OCT-2025
1
(SAME AS PREVIOUS LOCATION)

N61340

1002
30-JUN-2025
1
N/A
1003
POP 01-NOV-2025 TO

30-APR-2026

N/A
NAWCTSD ISEO

MAX HOANG

8656 EDSON RD BLDG 8656, MCAS MIRAMAR

SAN DIEGO CA 92145

858-577-7838

N61340

2001
48 mths. AOE
1
MARINE AVIATION TRAINING SYSTEM SITE

DALE ERICKSON

MARINE CORPS RESERVE SIMULATOR FACILITY

3335 FLINT ROAD

JOINT BASE MCGUIRE-DIX-LAKEHURST

MDL NJ 08641

609-754-8258

M00893

2002
50 mths. AOE
1
CNRFC COMS

DALE ERICKSON

MATSS MDL, BLDG. 3335, RM122

JB MCGUIRE/DIX/LAKEHURST NJ 08641-5000

(609) 754-8258

N61340

2003
POP 01-JUN-2026 TO

30-NOV-2026

N/A
MARINE AVIATION TRAINING SYSTEM SITE

DALE ERICKSON

MARINE CORPS RESERVE SIMULATOR FACILITY

3335 FLINT ROAD

JOINT BASE MCGUIRE-DIX-LAKEHURST

MDL NJ 08641

609-754-8258

M00893

8000
N/A
N/A
N/A
N/A
9000
30-NOV-2026
1
N/A

5252.211-9506 PROVISIONED ITEMS (FEB 1995)

Provisioned items shall be delivered in accordance with individual Provisioned Items Orders (PIOs) issued pursuant to Clause 5252.217-9500. The Government may order provisioned items for a period of up to twelve (12) months following delivery of CLINS 0001, 1001, or 2001, whichever occurs later.

5252.247-9505TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, list in Section J, attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.

(1) PMA-205

(2) PMA-261

(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses:

Note: Unless otherwise provided, the following mailing address format applies to each contact named in the table immediately below:

Naval Air Warfare Center Training Systems Division Attn: [Insert Contact Name] 12211 Science Drive Orlando, FL 32826-3224

Identifier
Contact Information
NAWCTSD ENGR
Jorge Jordan-Ramos

Phone: (407) 380-8016 E-mail: jorge.jordan-ramos@navy.mil

NAWCTSD ISEO-SD

Max Hoang PO Box 452038 San Diego, CA 92145 Phone: (858) 307-7838 E-mail: max.hoang@navy.mil

NAWCTSD ISSM

John Rooks Phone: (252) 466-7740 E-mail: john.rooks@navy.mil

NAWCTSD PCO

Reagan Gill Phone: (407) 380-4145 E-mail: reagan.gill@navy.mil

NAWCTSD PJM

Lowell Baker Phone: (407) 208-3461 E-mail: lowell.t.baker@navy.mil

NAWCTSD SE ENGR

TBD

NAWCTSD SW ENGR

Ibrahim Akyol Phone: (407) 380-8307 E-mail: ibrahim.akyol@navy.mil

NAWCTSD VISUAL ENGR

Edward Nowlin Phone: (407) 380-8420 E-mail: edward.j.nowlin@navy.mil

NAWCTSD ILSM

Tamela Hall Phone: (407) 380-4575 E-mail: tamela.hall@navy.mil

NAWCTSD T&E
Alexandra Dyar

Phone: (407) 381-8844 E-mail: alexandra.dyar@navy.mil

PMA-205 DIPTL
Sonja Sacket

48187 Standley Road, Bldg 4010 Patuxent River, MD 20670 Phone: (301) 247-6842 E-mail: sonja.sacket@navy.mil

NAWCTSD PROV
Misty Hammond Mathison

Phone: (407) 380-4768 E-mail: misty.hammond-mathis@navy.mil

NAWCTSD TMSS TECH DATA
Ricky Pender

Phone: (407) 380-4206 E-mail: ricky.pender@navy.mil

DEVICE SITE COR SD
Michael Stuart

PO Box 452038 San Diego, CA 92145-2038 Email: Michael.j.stuart@usmc.mil Phone: 858-307-1572

DEVICE SITE COR FT DIX
Dale Erickson

Phone: (609) 562-8863 E-mail: dale.erickson@navy.mil

NAWCTSD FACR
Duy Bui

Phone: (407) 380-4468 E-mail: duy.bui@navy.mil

NAWCTSD OPSEC MGR
Luisa Santana

Phone: (407) 380-8249 E-mail: luisa.santana@navy.mil

Section G - Contract Administration Data

CLAUSES INCORPORATED BY REFERENCE

252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

· Invoice and Receiving Report (Combo)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
See the “PAYMENT WILL BE MADE BY” block on the face page of this instrument
Issue By DoDAAC
See the “ISSUED BY” block on the face page of this instrument
Admin DoDAAC**
See the “ADMINISTERED BY” block on the face page of this instrument
Inspect By DoDAAC
See Schedule
Ship To Code
See Schedule
Ship From Code
N/A
Mark For Code
N/A
Service Approver (DoDAAC)
N/A
Service Acceptor (DoDAAC)
N/A
Accept at Other DoDAAC
N/A
LPO DoDAAC
N/A
DCAA Auditor DoDAAC
N/A
Other DoDAAC(s)
N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

N/A but note the requirement in the box immediately below:

WAWF email notifications

The Contractor shall enter the email address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system.

Name (or Clause w/Name)
Email
Phone
Role

Tom Baker

Project Manager (PJM) - Acceptor

Sonja Sacket

PMA-205 DIPTL - Acceptor

See Contract Specialist under Clause A.2.

Contract Specialist – Issue by View Only

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

5252.201-9500 TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)

(a) The Technical Point of Contact (TPOC) for this contract is:

Jorge Jordan-Ramos

NAWCTSD

12211 Science Dr Orlando, FL 32826-3224 Phone: (407) 380-8016 Email: jorge.jordan-ramos@navy.mil

(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).
(c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires.
(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.

5252.242-9511 CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017)

(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.
(b) Special Instructions (see FAR 42.202(b) and (c)):
(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):
Functions Retained
Retained for Performance By:
FAR 42.302(a)(3)
PCO
FAR 42.302(a)(23)
PCO
FAR 42.302(a)(30)
TPOC
FAR 42.302(a)(31)
PCO/TPOC
FAR 42.302(a)(38)
PCO/TPOC
FAR 42.302(a)(40)
PCO/TPOC
FAR 42.302(a)(41)
PCO/TPOC
FAR 42.302(a)(42)
PCO/TPOC
FAR 42.302(a)(43)
PCO/TPOC
FAR 42.302(a)(44)
PCO/TPOC
FAR 42.302(a)(45)
PCO/TPOC
FAR 42.302(a)(46)
PCO/TPOC
FAR 42.302(a)(48)
PCO/TPOC
FAR 42.302(a)(67)
TPOC

(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):

Additional Functions
Retained for Performance By:
N/A
N/A

(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.

Section H - Special Contract Requirements

H.1.

H.1. GOVERNMENT-FURNISHED INFORMATION (GFI)

The Government shall furnish only the GFI identified under Attachment 3, included in Section J. Any use of the GFI by the contractor shall be subject to Clause 252.227-7025, Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends, and any other applicable laws.

5252.204-9505SYSTEM AUTHORIZATION ACCESS REQUEST NAVY (SAAR-N) REQUIREMENTS FOR INFORMATION TECHNOLOGY(IT) (NAVAIR)(NOV 2017)
(a) Contractor personnel assigned to perform work under this contract may require access to Navy Information Technology (IT) resources (e.g., computers, laptops, personal electronic devices/personal digital assistants (PEDs/PDAs), NMCI, RDT&E networks, websites such as MyNAVAIR, and Navy Web servers requiring Common Access Card (CAC) Public Key Infrastructure (PKI)). Contractor personnel (prime, subcontractor, consultants, and temporary employees) requiring access to Navy IT resources (including those personnel who previously signed SAAR DD Form 2875) shall submit a completed System Authorization Access Request Navy (SAAR-N), OPNAV 5239/14 (Jul 2008) form or latest version thereof, and have initiated the requisite background investigation (or provide proof of a current background investigation) prior to accessing any Navy IT resources. The form and instructions for processing the SAAR-N form are available at: https://www.public.navy.mil/fltfor/nctsnaples/Documents/Forms%20and%20Instructions/form01.pdf. Instruction Note: SAAR-N forms are required to be downloaded and then completed. The "E-MAIL SUBMIT" button on the SAAR-N form is not to be used.
(b) SAAR-N forms will be submitted to the Government Sponsor or Technical Point of Contact (TPOC) via the contractor's Facility Security Officer (FSO). The designated SAAR-N Government Sponsor or TPOC for contractor employees requiring IT access, identified in Clause 5252.201-9500, shall be responsible for signing and processing the SAAR-N forms. For those contractors that do not have a FSO, SAAR-N forms shall be submitted directly to the designated SAAR-N Government Sponsor or TPOC. Copies of the approved SAAR-N forms may be obtained through the designated SAAR-N Government Sponsor or TPOC. Requests for access should be routed through the NAVAIR_SAAR.fct@navy.mil mailbox.
(c) In order to maintain access to Navy IT resources, the contractor shall ensure completion of initial and annual IA training, monitor expiration of requisite background investigations, and initiate re-investigations as required. If requested, the contractor shall provide to the designated SAAR-N Government Sponsor or TPOC documentation sufficient to prove that it is monitoring/tracking the SAAR-N requirements for its employees who are accessing Navy IT resources. For those contractor personnel not in compliance with the requirements of this clause, access to Navy IT resources will be denied/revoked.
(d) The SAAR-N form remains valid throughout contractual performance, inclusive of performance extensions and option exercises where the contract number does not change. Contractor personnel are required to submit a new SAAR-N form only when they begin work on a new or different contract.
5252.217-9500ORDERING - PROVISIONED ITEMS (FIXED-PRICE)(NAVAIR) (OCT 2005)
(a) Contract Modification - Provisioned Items and Other Requirements to be Furnished When Ordered by the Government. The contractor shall furnish supplies or other requirements under the Item(s) set forth in this clause when a contract modification is issued by the Government in accordance with the procedures specified herein. The Government shall not be liable for any expenses incurred by the contractor under any Item set forth herein until a contract modification is issued by the Government.
(b) Contractor Qualifying Proposal - Requirements Being Ordered. When required by the PCO, the contractor shall submit a qualifying proposal for the requirements the Government contemplates ordering hereunder. Such proposal shall be supported by cost or pricing data as prescribed in FAR 15.403 and DFARS 215.403 unless such requirement has been waived for orders under the contract pursuant to FAR 15.403. Certification of the cost or pricing data shall be made upon agreement on price.
(c) Ordering Period and Terminal Date for Delivery or Performance. Contract modifications for supplies or other requirements may be issued during the period covered by this contract at any time prior to the delivery date of the last article under the applicable Item called for in Section B hereof for which the supplies or other requirements are being procured. Contract modifications issued in accordance with this clause shall provide that deliveries or performance shall be completed not later than fourteen (14) months after the delivery of the last article under the applicable Item called for in Section B hereof, for which the supplies or other requirements are being procured.
(d) Ordering. For the purposes of this contract, the PCO is the ordering activity. The PCO will issue contract modifications for supplies or other requirements to be furnished by the contractor in accordance with requirements specified by the cognizant provisioning or requiring activity designated in paragraph (q) below. Each contract modification issued in accordance with paragraph (e) or (f) below shall -
(1) be prepared on Standard Form 30 (Amendment of Solicitation/Modification of Contract);
(2) be numbered as a modification to this contract in accordance with DFARS 204.7106;
(3) state that the contract modification is issued in accordance with this clause;
(4) identify the Item number set forth in Section B of the Schedule under which the supplies or other requirements are being procured (new contract line item number(s) shall not be assigned in any contract modification issued by the ACO.
(5) set forth in full detail the supplies or other requirements and the quantities being procured (deliverable requirements shall be set forth in a contract exhibit (see paragraph (m) below));
(6) include as an Exhibit, DD Form 1423, Contract Data Requirements List, using the exhibit identifier designated in Section B for the Item number, whenever data is ordered under any contract line item number which does not refer to a contract exhibit attached to the contract;
(7) set forth packing and marking requirements for supplies being procured (see FAR 47.305-10 and DFARS 247.305-10);
(8) set forth consignment instructions for supplies being procured to the extent they are known at the time the contract modification is issued (see FAR 47.305-10 and DFARS 247.305-10);’
(9) set forth the negotiated delivery or performance dates;
(10) identify those items, if any, subject to the "Limitation of Liability - High-Value Items" clause, if included in this contract;
(11) obligate funds to cover priced orders issued under paragraph (e) below or ceiling priced orders issued under paragraph (f) below;
(12) set forth the applicable accounting and appropriation data (to be provided to the Cognizant Contracting Officer by the cognizant provisioning or requiring activity (see paragraph (q) below)); and
(13) be given the same distribution as this contract, except that distribution of voluminous contract exhibits shall be limited to: (i) the contractor; (ii) the contract administration office; (iii) the cognizant provisioning or requiring activity; (iv) the paying office, and (v) the accounting office.
(e) Issuance of Contract Modifications Covering Priced Orders. For each order placed pursuant to this clause, the Cognizant Contracting Officer will prepare a supplemental agreement to this contract in the form of a priced order when supplies or other requirements are to be furnished by the contractor unless otherwise provided for under paragraph (f) below. The supplies or other requirements being procured shall be clearly defined in the supplemental agreement. Such supplemental agreement shall be priced and otherwise definitive at the time of issuance and shall be signed by the contractor and the Cognizant Contracting Officer.
(f) Issuance of Contract Modifications Covering Ceiling Priced Orders. In those cases where it is not possible to price supplies or other requirements in accordance with paragraph (e) above due to urgency such as safety-of-flight or readiness impact, the Cognizant Contracting Officer will prepare a supplemental agreement to this contract in the form of a ceiling priced order. A ceiling priced order shall not be used to obtain contractor support services. Each ceiling priced order shall clearly define the supplies or other requirements being procured and shall set forth a not-to-exceed ceiling price and shall specify the total ceiling price for the DFARS Clause 252.217-7027, "Contract Definitization". The ceiling price set forth in any ceiling priced order shall not be used as a billing price for delivered items. Each ceiling priced order shall provide for total performance of the order for the specified ceiling price and such ceiling price shall bear a reasonable relationship to the work to be performed. A milestone schedule which culminates in a mutually agreed date upon which complete definitization will occur shall be included in each ceiling priced order. The milestone schedule established in the ceiling priced order concerned shall be within the period set forth in paragraph (h) below. Provisioned Items Orders shall comply with the applicable requirements set forth in DFARS 217.7602-2. Each supplemental agreement covering a ceiling priced order shall be signed by the contractor and the Cognizant Contracting Officer. Additional requirements or quantities shall not be added to any ceiling priced order issued hereunder.
(g) Limitation of Government Liability Under Ceiling Priced Orders. The firm price of each ceiling priced order shall not exceed the ceiling price as established in accordance with paragraph (h). The ceiling price shall be the maximum amount for which the Government shall be liable if the ceiling priced order is terminated before the firm price is established. If at any time the contractor has reason to believe that the total price to the Government for the supplies or other requirements called for in any ceiling priced order will be substantially less than the ceiling price specified therefore, the contractor shall promptly notify the Cognizant Contracting Officer, in writing, with a copy to the cognizant provisioning or requiring activity. The Cognizant Contracting Officer will, based upon such notification, decrease the ceiling price of the ceiling priced order concerned. A decrease in the ceiling price of any ceiling priced order shall be set forth in a supplemental agreement to this contract and shall be signed by the contractor and the Cognizant Contracting Officer.
(h) Establishment of Firm Prices of Ceiling Priced Orders. The contractor shall submit to the Cognizant Contracting Officer not later than 30 days after the issuance of each ceiling priced order a qualifying proposal for the supplies or other requirements ordered by the Government that shall include:
(1) a statement of costs incurred and an estimate of the costs expected to be incurred in the performance of the ceiling priced order together with sufficient data to support the accuracy and reliability of such estimate and
(2) supporting cost or pricing data (see paragraph (o) below), except that if a qualifying proposal including supporting cost or pricing data was submitted to the Cognizant Contracting Officer before the issuance of the ceiling priced order concerned, only revisions to such qualifying proposal and the supporting cost or pricing data are required to be submitted to the Cognizant Contracting Officer.
Upon submission of the contractor's qualifying proposal, or revisions thereto, the contractor and the Cognizant Contracting Officer shall promptly negotiate and establish a firm price for the supplies or other requirements called for in the ceiling priced order concerned. The firm price for the supplies or other requirements, as agreed upon by the contractor and the Cognizant Contracting Officer, shall be set forth in a supplemental agreement to this contract. The item identifications shown in the applicable ceiling priced order shall be set forth in such supplemental agreement. Except for ceiling priced orders issued against contract line items for initial spares identified in Section B, the firm price of each ceiling priced order shall be established within one hundred eighty (180) days after the issuance of the ceiling priced order, or the date on which the funds expended by the Government equal fifty (50%) percent of the ceiling price, whichever occurs earlier. The definitization schedule may be extended, but not exceed, one hundred eighty (180) days after submission of the contractor's qualifying proposal. The firm price of each ceiling priced order for initial spares shall be established at most within one hundred eighty (180) days after the issuance of the ceiling priced order. If agreement on a definitive supplemental agreement to establish the firm price of any ceiling priced order is not reached within the period specified above, the Cognizant Contracting Officer may unilaterally determine a reasonable price for the ceiling priced order concerned in accordance with FAR 15.4 and Part 31 subject to appeal by the contractor as provided in the "Disputes" clause of this contract.
(i) Identification of Costs of Ceiling Priced Orders. The contractor shall identify by order all incurred costs (less allocable credits) for work allocable to each ceiling priced order issued pursuant to paragraph (f) above. The requirement for the contractor to segregate the costs of each ceiling priced order shall continue until the firm price is established by a supplemental agreement to this contract.
(j) Progress Payments - Withholding or Suspension - Ceiling Priced Orders. Submission by the contractor of a qualifying proposal for each ceiling priced order issued hereunder is a material requirement of this contracting order that complete definitization will occur within the period specified in paragraph (h) above. Therefore, if the contractor fails to submit a qualifying proposal for any ceiling priced order, progress payments may be reduced or suspended for the order concerned as provided in paragraph (c)(1) of the Progress Payments clause of this contract unless such failure of the contractor is due to causes beyond its control and without its fault or negligence. Cognizant Contracting Officer will notify the contractor, in writing, as to any reduction or suspension of progress payments pursuant to FAR 32.503-6.
(k) Expenditure Limitation for Ceiling Priced Orders. (This paragraph (k) shall not apply to ceiling priced orders issued against contract line items for initial spares identified in Section B or orders under $25,000.) Pending the establishment of firm prices, progress payments, as well as total expenditures by the Government in the case of acceptance, shall be fifty (50%) percent of the ceiling price of each ceiling priced order for which the contractor has not submitted to the Cognizant Contracting Officer a qualifying proposal for definitization, or seventy-five (75%) percent of the ceiling price of each ceiling priced order for which a qualifying proposal has been submitted to the Cognizant Contracting Officer. The contractor shall identify in an attachment to Standard Form 1443, Contractor Request for Progress Payment, for each ceiling priced order, the progress payment amount requested for each ceiling priced order, and shall state the maximum expenditure limitation specified by this paragraph (k) for the ceiling priced order. In the event of acceptance, the Government shall identify any expenditure limitations specified in this paragraph (k).
(l) Qualifying Proposals for Priced Orders and Ceiling Priced Orders. The term "qualifying proposal", as used herein, means, at a minimum, a proposal which contains sufficient information to enable the Government to conduct complete and meaningful audits of the information contained in the proposal and of any other information which the Government is entitled to review in connection with any priced order issued under paragraph (e) above, or any ceiling priced order issued under paragraph (f) above, as determined by the Cognizant Contracting Officer.
(m) Contract Exhibits Covering Priced Orders and Ceiling Priced Orders. The contractor shall prepare a contract exhibit in accordance with DFARS 204.7105 covering the deliverable requirements (other than data), being procured under a priced order issued under paragraph (e) above or a ceiling priced order issued under paragraph (f) above. Each contract exhibit shall use the appropriate exhibit identifier assigned in Section B of the Schedule for the contract line item number under which deliverable requirements (other than data) are being procured. Each contract exhibit shall apply only to the contract line item number designated in Section B (or shall apply to one alpha suffix subline item number only if established within the designated contract line item number when the order is issued). The applicable contract line item number (or the applicable alpha suffice subline item number, if established) and the applicable exhibit identifier shall be cited on each contract exhibit. If all available exhibit line item numbers are used within each exhibit (identifier) assigned in Section B for the particular contract line item number(s), the contractor shall notify the Procuring Contracting Officer (PCO), in writing, and request that additional exhibit identifier(s) be assigned for the contract line item number(s) concerned. Any additional exhibit identifier(s) assigned for any contract line item number will be set forth in a unilateral modification to this contract signed by the PCO. This paragraph (m) does not apply to any contract line item number set forth in Section B that calls for data.
(n) Modifications to Priced Orders or Ceiling Priced Orders. Modifications to priced orders or to ceiling priced orders issued hereunder shall be effected in accordance with the procedures for issuing contract modifications specified in this clause. Modifications to ceiling priced orders issued pursuant to paragraph (f) above shall not include additional requirements or quantities. Any claim for charges resulting from a decrease in the supplies or other requirements ordered in any priced order or in any ceiling priced order shall be processed in accordance with the termination procedures of this contract. Items of supplies or other requirements set forth in modifications to priced orders and contract exhibits attached thereto shall be numbered in accordance with the applicable procedure set forth in DFARS 204.7106, except that new contract line item numbers shall not be assigned in contract modifications issued by the ACO. The applicable contract line item numbers (or alpha suffix subline item numbers, if any) or exhibit line item numbers cited in priced orders or in ceiling priced orders issued pursuant to this clause shall be cited in appropriate modifications to such orders.
(o) Cost or Pricing Data. Whenever cost or pricing data, as defined in FAR 15.403, are required in accordance with FAR 15.403 and DFARS 215.403, the Contractor shall submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408.
(p) Provisioning Document, Specifications, or Description of Work. The applicable provisioning document or specification or the description of the work is set forth below. To the extent of any inconsistency between any provisioning document or specification referred to below and the Schedule, the Schedule shall control.
Provisioning Document,
ItemSpecification or Description of Work
8000Attachment 1 under the heading “Buy Through The Prime (BTTP)”

(q) Provisioning or Requiring Activity. The cognizant provisioning or requiring activity designated below will determine appropriate requirements (see paragraph (d) above) to be set forth in priced orders issued under paragraph (e) above or in ceiling priced orders issued pursuant to paragraph (f) above. If the cognizant provisioning or requiring activity is a U.S. Navy activity, a signed Certification of Urgency shall be provided to the Cognizant Contracting Officer before the issuance of any ceiling priced order for requirements specified by such activity.

ItemRequiring Activity
8000NAWCTSD

Section I - Contract Clauses

52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-18
Commercial and Government Entity Code Maintenance
AUG 2020
52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.232-16 Alt I
Progress Payments (JUN 2020) - Alternate I
MAR 2000
252.223-7008
Prohibition of Hexavalent Chromium
JUN 2013
252.227-7014
Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation
FEB 2014
252.232-7004
DOD Progress Payment Rates
OCT 2014

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the timeframe(s) provided in the below table. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

CLIN
Option Exercise Period
Required Minimum Notice Days
0003
Expires 1 month before the scheduled delivery date for CLIN 0001
30
1003
Expires 1 month before the scheduled delivery date for CLIN 1001
30
2001
Expires 9 months after contract award
2002
Expires 9 months after contract award
2003
Expires 1 month before the scheduled delivery date for CLIN 2001
30
52.243-7NOTIFICATION OF CHANGES (JAN 2017)
(a) Definitions. "Contracting Officer," as used in this clause, does not include any representative of the Contracting Officer. "Specifically authorized representative (SAR)," as used in this clause, means any person the Contracting Officer has so designated by written notice (a copy of which shall be provided to the Contractor) which shall refer to this subparagraph and shall be issued to the designated representative before the SAR exercises such authority.
(b) Notice. The primary purpose of this clause is to obtain prompt reporting of Government conduct that the Contractor considers to constitute a change to this contract. Except for changes identified as such in writing and signed by the Contracting Officer, the Contractor shall notify the Administrative Contracting Officer in writing, within 30 calendar days from the date that the Contractor identifies any Government conduct (including actions, inactions, and written or oral communications) that the Contractor regards as a change to the contract terms and conditions. On the basis of the most accurate information available to the Contractor, the notice shall state--
(1) The date, nature, and circumstances of the conduct regarded as a change;
(2) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such conduct;
(3) The identification of any documents and the substance of any oral communication involved in such conduct;
(4) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose;
(5) The particular elements of contract performance for which the Contractor may seek an equitable adjustment under this clause, including--
(i) What line items have been or may be affected by the alleged change;
(ii) What labor or materials or both have been or may be added, deleted, or wasted by the alleged change;
(iii) To the extent practicable, what delay and disruption in the manner and sequence of performance and effect on continued performance have been or may be caused by the alleged change;
(iv) What adjustments to contract price, delivery schedule, and other provisions affected by the alleged change are estimated; and
(6) The Contractor's estimate of the time by which the Government must respond to the Contractor's notice to minimize cost, delay or disruption of performance.
(c) Continued performance. Following submission of the notice required by (b) above, the Contractor shall diligently continue performance of this contract to the maximum extent possible in accordance with its terms and conditions as construed by the Contractor, unless the notice reports a direction of the Contracting Officer or a communication from a SAR of the Contracting Officer, in either of which events the Contractor shall continue performance; provided, however, that if the Contractor regards the direction or communication as a change as described in (b) above, notice shall be given in the manner provided. All directions, communications, interpretations, orders and similar actions of the SAR shall be reduced to writing and copies furnished to the Contractor and to the Contracting Officer. The Contracting Officer shall countermand any action which exceeds the authority of the SAR.
(d) Government response. The Contracting Officer shall promptly, within calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer shall either--
(1) Confirm that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance;
(2) Countermand any communication regarded as a change;
(3) Deny that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance; or
(4) In the event the Contractor's notice information is inadequate to make a decision under (1), (2), or (3) above, advise the Contractor what additional information is required, and establish the date by which it should be furnished and the date thereafter by which the Government will respond.
(e) Equitable adjustments.
(1) If the Contracting Officer confirms that Government conduct effected a change as alleged by the Contractor, and the conduct causes an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, whether changed or not changed by such conduct, an equitable adjustment shall be made--
(i) In the contract price or delivery schedule or both; and
(ii) In such other provisions of the contract as may be affected.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .