DraftSOW-Mechanical-MSW-Cutters_08October2026_Redacted.pdf
PDF 2 MB Posted
- Solicitation number
- N6133127SNQ01
About this file
This is a Statement of Work (SOW) for the fabrication, testing, and delivery of Mechanical Minesweeping Cutter Assemblies and Elevating Fin Assemblies for a Republic of Korea Navy ship, dated 08 October 2026.
The contractor must fabricate and deliver 196 MK 14 Cutter Assemblies, 50 MK 14 Elevating Fin Assemblies, 10 MK 9 Cutter Assemblies, 64 MK 12 Cutter Assemblies, 64 MK 12 Elevating Fin Assemblies, and 11 MK 15 Cutter Assemblies. All hardware deliveries are due by 01 October 2027 to Naval Surface Warfare Center Panama City Division, 110 Vernon Avenue, Panama City, Florida 32407. The contractor must conduct in-factory fit and function testing for sample quantities of each assembly type with two weeks' notice to the government. Testing timelines range from 10 to 15 minutes per assembly depending on the assembly type. The contractor shall provide monthly status reports documenting accomplishments, estimated completion dates, and resource expenditures. All marking, packing, and shipping must comply with NAVSEA D-247-H005. The government will furnish all cutter and elevating fin assemblies as Government Furnished Equipment (GFE) within ten days after contract award. The contract includes an unclassified ordering period of five years from the date of award, and performance requires access to Controlled Unclassified Information (CUI). Detailed technical drawings for all four cutter assembly types (MK 14, MK 9, MK 12, and MK 15) are referenced and form part of the applicable documents. Data deliverables shall be submitted in accordance with DD Form 1423.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6133127SNQ01 Sources Sought - FMS Cutters.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .