A8 - Exhibit A CDRL.pdf
PDF 208 KB Posted
- Solicitation number
- N61331-24-T-JK09
About this file
This document contains two Contract Data Requirements Lists (CDRLs) related to Solicitation Number N61331-24-T-JK09, a small business set-aside for lightweight shock and type I vibration testing of Amphibious Assault Direction System equipment.
The first CDRL requires submission of a Data Accession List within 15 working days of test completion, with initial submission comments addressed within 3 working days. The second CDRL requires monthly Government Property Inventory Reports if the contractor has custody of government property, tailored to specific reporting requirements. Initial reports are due at task order kickoff and every six months thereafter, submitted electronically to NSWCPCD_PP&E@us.navy.mil. The solicitation is for the Department of the Navy Naval Sea Systems Command to test laptop/docking station/power supply, Ethernet switch, and video distribution amplifier equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A5 - Statement of Work USig.pdf | ||
| C12 - Service_GFP_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Shock and Vibe test for AADS equipment
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Data Accession List (DAL) RNA-SEQ Transcriptome Assembly data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SOW para. 3.3 NSWC PCD Code E24 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ONE/R SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Repro
16. REMARKS NSWC PCD Code E24 1 1 0
Blk 4: The DID is cited for guidance as to content only. Contractor format is acceptable.
Blks 8, 10, 12, 13: Initial submittal due 15 working days after completion of last test event. The Government will review the initial submittal for approval of technical content and will provide comments within 5 working days after receipt. Comments shall be addressed and the data resubmitted as final within 3 working days after receipt of comments.
Blk 9: Data shall be marked in accordance with SOW para. 8.0
Blk 14: MEDIA Requirements: Microsoft Office 2016 compatible files via e-mail. E-mail addresses will be provided at award.
LT ONLY
NSWC PCD Code 024
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
NSWC PCD Code E24
12/4/2023
A. Johns, NSWC PCD Code 02T
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Shock and Vibe test for AADS equipment
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Government Property Inventory Report Monthly GFP Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80441D SOW PARA 4.0
DFARS PGI 245.103 -73
NSWC PCD Code E24 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED MTHLY SEE BLK 16 b. COPIES
8. APP CODE SEE PWS 8.0 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A 0 SEE BLK 16 Reg Repro
16. REMARKS NSWC PCD, Code E24 1
Blk 4: If the Contractor has custody of GFP then this report shall be submitted. If the Contractor does not have custody of GFP no report is required. The DID is tailored as follows: (A) General. Delete any reference to Contractor Acquired Property.
Abbreviations are not allowed. Acronyms may be used if a term is defined on first usage., (B) Block 2.B. Change to read: "Manufacturer Commercial and Government Entity (CAGE) Code.” (C) Block 2.E. Delete. (D) Block 2.H. Delete. (E) Block 2.N. Delete. (F) Block 2.0. Delete. (G) Block 2.Q. Delete.
(H) Block 2.R. Delete. (I) Block 2.S. Delete. (J) Block 2. T. Delete. (K) Block 2.V.
Delete. (L) Block 2. W. Change to Read: "Condition of Property."
Blocks 10, 12, 13, & 14: Initial submittal shall be delivered and presented at the Task Order Kick-Off Meeting and every six months thereafter unless otherwise approved by the Government. Reproducible copy shall be submitted as Microsoft Word 2016 files via e-mail to: NSWCPCD_PP&E@us.navy.mil
NSWC PCD 1073 1
15. TOTAL 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
NSWC PCD Code E24 12/4/2023 A. Johns, NSWC PCD Code 02T
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 2 Pages
File details come from the government source that posted it. Updated .