This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Southwest Regional Maintenance Center (SWRMC), a Naval facility located in San Diego, California. Amendment 0002 is effective July 16, 2026, and amends solicitation N5523626Q0101 dated July 7, 2026. The amendment does not extend the offer receipt deadline but requires offerors to acknowledge receipt of this amendment prior to submission.

The amendment provides government responses to three contractor clarification questions regarding solicitation requirements. First, regarding power supply for two 220V shot blasters (60 amps total), the government clarified that while 110V and 480V are available around the Graving Dock, contractors must supply their own step-down transformer to convert 480V to 220V. Additionally, contractors should expect to supply their own power entirely, as all dock power is currently being used by a ship projected to remain in dock until March 2027. Second, concerning Quality Management System (QMS) requirements, the government prefers contractors to have an approved SWRMC QMS at the time of award, but an established internal QMS may be reviewed and approved prior to award and commencement of the Period of Performance (POP). Third, regarding coating system experience requirements, contractors must use a previously NAVSEA-approved coating system; comparable commercial marine coating experience alone is insufficient for technical acceptability. Previous SWRMC past performance is not required for technical acceptability but will be evaluated as a performance factor.

View the file

Other files

File Type Posted
26Q0101-SOW-REV2.pdf PDF
26Q0101-AMENDMENT-0003.pdf PDF
26Q0101-AMENDMENT-0001.pdf PDF
26Q0101-SOW-REV1.pdf PDF
26Q0101-RFC.docx DOCX document
26Q0101-COMSS.pdf PDF
26Q0101-SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1. CONTRACTOR ID CODE

PAGE

OF

PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

16 July 2026

4. REQUISITION/PURCHASE REQ. NO.

6. ISSUED BY:

SOUTHWEST REGIONAL MAINTENANCE

CENTER

CODE

N55236

7. ADMINISTERED BY (If other than Item 6)

CODE 410A

3755 BRINSER STREET STE 1

SAN DIEGO, CA 92136

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, State, & Zip Code)

(Ö)

X

9A. AMENDMENT OF SOLICITATION NO.

N5523626Q0101

9B. DATED (SEE ITEM 11)

07 July 2026

10A. MODIFICATION OF CONTRACT/ ORDER

NO.

10B. DATED (SEE ITEM 13)

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is changed, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation & this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN

ITEM 14.

A. THIS CHANGE ORDER ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT / ORDER NO. IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is, is not required to sign this document and return ___ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UFC section headings, including solicitation/contract subject matter where feasible.)

See continuation page(s).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)

15B. CONTRACTOR / OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

BY ______________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

PREVIOUS EDITIONS USABLE

30-105-01 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

N5523626Q0101

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The purpose of this Amendment is as follows:

a. Provide answers to the clarification questions:

Contractor Question: We are looking at running (2) Shot Blasters – 220V each, 30Amps each – total of 60Amps.

We were wondering if we could tap into shore power or do we have to supply our own power.

Government Answer: Around the Graving Dock we have 110V and 480V available, contractor would need to supply a step down transformer to hook up to a 480V circuit in order to get the requested 220V. Additionally, there is currently a ship in dock, therefore all power around the dock is being used to execute the current availability in the graving dock. Contractors should expect to supply their own power for execution. The current ship in dock is currently projected to be in dock until March 2027.

Contractor Question: The solicitation states that the contractor must have an approved SWRMC Quality Management System (QMS). Could you please clarify whether a contractor must already have an approved SWRMC Quality Management System prior to contract award, or if a contractor with an established internal Quality Management System may become compliant before the start of contract performance?

Government Answer: Preferred to have an approved SWRMC QMS in place at time of award, but an established internal QMS would need to be reviewed and approved prior to Award and start off Period of Performance (POP).

Contractor Question: Will comparable commercial marine coating, surface preparation, and non-skid coating experience be considered acceptable for Technical Acceptability, or is previous NAVSEA/SWRMC past performance required?

Government Answer: A previous NAVSEA approved coating system shall be used. Any deviation from previously approved NAVSEA coating systems will require large amounts of technical data and review cycles causing large delays that would yield the contractor unable to meet the POP. Previous SWRMC past performance is not required to be technically acceptable, however, performance is an evaluation factor for this acquisition.

16 July 2026