26Q0666_Amendment1.pdf

PDF 352 KB Posted

Attached to
SUZUKI OUTBOARD ENGINE PARTS & INSTALLATION
Solicitation number
N5523626Q0066
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Southwest Regional Maintenance Center (SWRMC), Code N55236, located at 3755 Brinser Street Suite 1, San Diego, CA 92136.

Amendment 0001 is effective 30 April 2026 and amends solicitation N5523626Q0066 dated 28 April 2026. The amendment provides government responses to two contractor questions regarding the scope of work for a boat engine repower project. The government clarified that SWRMC Divers will deliver the boat to the vendor's facility for complete repower, installation, and testing as part of the scope of work. Additionally, the government specified that the dual main harness kits should be 21 feet in length, the mechanical dual cable should be 16 feet in length, the 24-hour kit refers to labor for removal of old engines and installation of new engines (not an engine hours meter), and testing will be conducted at the vendor's shop prior to pickup with no sea trial required.

View the file

Other files

File Type Posted
26Q0066_RFC.docx DOCX document
26Q0066_SOW.pdf PDF
26Q0066_FAR_DFARS CLAUSES.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1. CONTRACTOR ID CODE

PAGE

OF

PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

30 APRIL 2026

4. REQUISITION/PURCHASE REQ. NO.

6. ISSUED BY:

SOUTHWEST REGIONAL MAINTENANCE

CENTER

CODE

N55236

7. ADMINISTERED BY (If other than Item 6)

CODE 410A

3755 BRINSER STREET STE 1

SAN DIEGO, CA 92136

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, State, & Zip Code)

X

9A. AMENDMENT OF SOLICITATION NO.

N5523626Q0066

9B. DATED (SEE ITEM 11)

28 APRIL 2026

10A. MODIFICATION OF CONTRACT/ ORDER

NO.

10B. DATED (SEE ITEM 13)

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is changed, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation & this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN

ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT / ORDER NO. IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is, is not required to sign this document and return ___ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UFC section headings, including solicitation/contract subject matter where feasible.)

See continuation page(s).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)

15B. CONTRACTOR / OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

BY ______________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

PREVIOUS EDITIONS USABLE

30-105-01 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

N5523626Q0066

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The purpose of this Amendment is as follows:

a. Provide answer to the following questions:

1) Contract Question:

Will SWRMC Divers will be delivering the boat to the vendor’s facility for complete repower, installation, and testing as part of the scope, or Will the requirement is for supply only (engines and accessories), with installation and testing to be performed by a Suzuki authorized mechanic at the Government facility.

Government Answer:

Yes SWRMC Divers will be delivering the boat to the vendor’s facility for complete repower, installation, and testing as part of the scope.

2) Contract Question:

2 EA KIT SUZ MECH DUAL MAIN HARNESS 2: What length? 16’, 21’, 26’?

4 EA KIT SUZ MECH DUAL 16” MACH-0 33C CABLE: 16’ correct?

24 HR KIT SUZ MECH DUAL HOURS OF WORK: Are you referring to an engine hours meter? Qnty needed?

Will the 'test' portion (outlined in 4. Features Required of the Statement of Work) include a Sea Trial?

Government Answer:

- 21 ft

- 16 ft

- Labor for removal of old engines and installation of new engines.

- Test will be conducted at the shop prior to pick up.

File details come from the government source that posted it. Updated .