This is a pricing template spreadsheet (Exhibit A) detailing paint and coating requirements for the USS RUSSELL (DDG-59) hull preservation project. The document specifies various types of antifouling and underwater hull coatings including anticorrosive coats (MIL-PRF-24647 Type I or II), tie coats, and multiple layers of 12-year antifouling coatings with specific color requirements (red, gray, and black). The quantities are precisely calculated based on square footage (36,051 sq ft) with specified dry film thickness (DFT) requirements and 30% wastage allowance, totaling approximately 14,443 gallons of various coatings.
The template includes line items for technical services at the contractor's facility (to be determined), with provisions for 150 days of technical service with per diem and travel, plus 30 days of extension rate. The pricing structure is organized into CLIN 0001 for Supplies/Products, CLIN 0002 for Services, and CLIN 0003 for Contract Data Requirements List (NSP). The document includes spaces for unit pricing and total costs, though no actual prices are filled in.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 25Q0044_PWS_RUSSEL_Hull_Preserv.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT A -- USS RUSSELL (DDG-59) | ||||||||||
| Exhibit Line item | Paragraph | System/Nomenclature | Product Name/ | |||||||
| Description | Unit of Issue | % Volume | Sq.ft | DFT | ||||||
| Total mils | Quantity in Gallons (includes 30% wastage) | Unit Price | Total Price | |||||||
| Solid | ||||||||||
| Per ASTM D2697 | ||||||||||
| Antifouling/Underwater Hull | GAL | |||||||||
| A002 | 2.10.2.1 | Anticorrosive 1st Coat MIL-PRF-24647, Type I or II | Red | GAL | 68 | 36051 | 6 | 283 | $0.00 | |
| A003 | 2.10.2.1 | Anticorrosive 2nd Coat MIL-PRF-24647, Type I or II | Gray | GAL | 68 | 36051 | 6 | 283 | $0.00 | |
| A004 | 2.10.2.2 | Tie Coat (if applicable) | GAL | 1 |
Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA): Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA):
If Tie Coat is not applicable inset a 1 36051 2 6,422 Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA): Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA):
Change to 0 if Tie Coat is not applicable. $0.00
| A005 | 2.10.2.1 | MIL-PRF-24647 / 12 Year AF 3rd Coat/Boottop, Type II | Red | GAL | 56 | 36051 | 6 | 344 | $0.00 |
| A006 | 2.10.2.1 | MIL-PRF-24647 / 12 Year AF 4th Coat/Boottop, Type II | Black | GAL | 56 | 36051 | 6 | 344 | $0.00 |
| A007 | 2.10.2.1 | MIL-PRF-24647 / 12 Year AF 5th Coat (Boottop only), Type II | Black | GAL | 56 | 4025 | 6 | 38 | $0.00 |
| A008 | 2.10.2.1 | MIL-PRF-24647 / 12 Year AF 5th Coat, Type II | Red | GAL | 56 | 32026 | 6 | 306 | $0.00 |
| A009 | 2.10.2.2 | Tie Coat (if applicable) | GAL | 1 |
Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA): Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA):
If Tie Coat is not applicable inset a 1 36051 2 6,422 Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA): Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA):
| Change to 0 if Tie Coat is not applicable | $0.00 | |||||||||
| A010 | 2.10.3 | MIL-PRF-24635 Draft Markings | Lt.Gray | GAL | 90 | 200 | 7 | 1 | $0.00 |
SUBTOTAL 14443. gal $0.00
Technical Services Availability
| A011 | 5.2.1 | Contractor's Facility - (TO BE DETERMINED) | |||
| A012 | 5.2.2 | Technical Service with per diem and travel | Per Day | 150 | $0.00 |
| 5.2.2.1 | Daily Extension Rate: Technical Service with per diem and travel | Per Day | 30 | $0.00 |
SUBTOTAL $0.00
| Transportation Charges (based on | total estimated gallons | ||||
| A015 | 9.2 | Navy Product Support requirements | GAL | $0.00 |
Willis, Derek L CIV COMSC, N10: Willis, Derek L CIV COMSC, N10:
Total volume cost and paint plus the subtotal of cost and removal times by % times the unit price (I116+I196)* % * unit price)
Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA): Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA):
If Tie Coat is not applicable inset a 1 Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA): Alcantara, Raul R CIV USN SW RMC SAN DIEGO CA (USA):
Change to 0 if Tie Coat is not applicable. SUBTOTAL $0.00
| CLIN 0001 | Supplies/Products | 1 LOT | $0.00 |
| CLIN 0002 | Services | 1 LOT | $0.00 |
| CLIN 0003 | Contract Data Requirements List | NSP | NSP |
TOTAL EVALUATED PRICE $0.00