| ITEMIZED PRICING SHEET | |
| CONTRACT: | PUMP AND MOTOR CONTINGENCY |
| CONTRACTOR: | |
| DELIVERY ORDER: | |
| SHIP: | USSS BOXER (LHD-4) |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| ITEMIZED PRICING 0001 | | | |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO MECHANICALLY AND ELECTRICALLY DISCONNECT AND REMOVE THE EXISTING NR-10 FIRE PUMP AND MOTOR UNIT FROM THE FOUNDATION AND ASSOCIATE PIPING. AFTER OVERHAUL, INSTALL THE PUMP AND MOTOR ONTO FOUNDATION AND CONNECT MECHANICALLY AND ELECTRICALLY IN ACCORDANCE WITH THE STATEMENT OF WORK.
(SEE NOTE 2) 1 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| ITEMIZED PRICING 0002 | | | |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR-10 FIRE PUMP IN ACCORDANCE WITH TECH MANUAL S6225-W6-MMA-010 TO INCLUDE REPLACEMENT OF THE SHAFT SLEEVES, BEARINGS, LUBRICATION FITTINGS, O-RINGS, GASKETS, SLINGERS, MECHANICAL SEAL, CASE AND WEARING RINGS. ACCOMPLISH THE OVERHAUL OF THE NR-12 FIRE PUMP AND MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTES 1 AND 2) 1 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| | ITEMIZED PRICING 0003 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (REMOVAL AND INSTALL) OF NR-10 FIRE PUMP AND MOTOR UNIT FROM THE FOUNDATION TO THE SHOP FOR OVERHAUL, AND BACK ONTO THE FOUNDATION AFTER OVERHAUL | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| | ITEMIZED PRICING 0004 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF OVERHAULING THE PUMP AND MOTOR. | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| ITEMIZED PRICING 0005 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP TEST AND SHIPBOARD OPERATIONAL TESTING OF THE OVERHAULED NR-10 FIRE PUMP AND MOTOR UNIT IN ACCORDANCE WITH THE TECH MANUAL S6225-W6-MMA-010, NAVSEA STANDARD ITEM 009-113 AND SWRMC ENGINEERING TEST MEMO FOR NAVY STANDARD TITANIUM FIRE PUMP MOTOR DRIVEN | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| | ITEMIZED PRICING 0006 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE OVERHAULED NR-10 FIRE PUMP AND MOTOR, ALIGNMENT AND ADJUSTMENTS PROCEDURE IN ACCORDANCE WITH THE TECH MANUAL S6225-W6-MMA-010 AND NAVSEA STANDARD ITEM 009-58. | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| | ITEMIZED PRICING 0007 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE NEW AND DISTURBED SURFACES IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-32 | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| | ITEMIZED PRICING 0008 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REMOVAL AND INSTALLATION OF PIPE LAGGING IN THE SUCTION SIDE OF NR-10 FIRE PUMP AND MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-11 | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE04-4540 | 5.5-99-0-E, NR-10 FIRE PUMP AND MOTOR | 1 | | |
| ITEMIZED PRICING 0009 | | | |
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 3) 1 $0.00
| EDWINJOEY MAGBUTAY SBS | |
| 17 NOV 2023 | TOTAL | $0.00 |
| OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order. | | ESTIMATED AMOUNT | UNIT OF ISSUE | FBLR for ELIN 0010. MATERIAL HANDLING RATE FOR ELIN 0011 | TOTAL |
| ITEMIZED PRICING 0010 | ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS | | | | |
ST Fully Burdened Labor Hour Rate $________
| NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 100 | HR | $0.00 |
| ITEMIZED PRICING 0011 | ADDITIONAL WORK - MATERIALS | |
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. | 60,000.00 | DOLLARS, US | 0% |
| MILESTONE EVENT | DATES |
| 1. Purchase Order Start Date | 19-Jan-24 |
| 2. Remove and transport to shop | 19 - 26 Jan 24 |
| 3. Overhaul and Shop Test | 26 Jan - 04 Mar 24 |
| 4. Delivery to Ship, install, align and Shipboard OPTEST | 05 - 13 Mar 24 |
| 5. Purchase Order End Date | 13-Mar-24 |
| NOTES: |
| 1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-113 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation. |
| 2. Refer to Technical Manual S6225-W6-MMA-010, Technical Manual for Navy Standard Titanium Centrifugal Pump 1000 GPM (NAVSEA Drawing No. 803-5773203) and NAVSEA Standard Item 009-113 for detailed procedures on the overhaul of the Fire Pump and Motor to include shop and shipboard operational testing in accordance with SWRMC ENGINEERING TEST MEMO for Navy Standard Titanium Fire Pump Motor Driven. |
| 3. Routing access for the Fire Pump and Motor Unit: From 5.5-99-0-E (Fire Pump Room) through the BERP plate overhead and then from Weapons Elevator to the Hangar Bay. |
| 4. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6225-W6-MMA-010, Technical Manual for Navy Standard Titanium Centrifugal Pump 1000 GPM (NAVSEA Drawing No. 803-5773203). |