N5523623Q0217_Amendment0001.pdf
PDF 329 KB Posted
- Solicitation number
- N5523623Q0217
About this file
This is a statement of work for a federal contract solicitation to provide commercial industrial services for cleaning and disposing of saltwater ballast tanks aboard the USS Comstock. The solicitation requires contractors to empty, clean, offload, transfer, transport, and dispose of approximately 8,000 gallons of liquid waste from one saltwater ballast tank. Contractors must follow all applicable regulations and use licensed and certified personnel and equipment. The statement of work provides milestones from September 13-20, 2023 to complete the task. Contractors will be responsible for proper handling and documentation of any hazardous waste in accordance with EPA and state requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23Q0217_Itemized_Pricing.xlsx | XLSX spreadsheet | |
| N5523623Q0217_SF18_Solicitation.pdf | ||
| 23Q0217_RFC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N5523623Q0217PR
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
REF: RFQ# N5523623Q0217; USS COMSTOCK (LSD-45) CIS TANK & DISPOSAL
1) The purpose of this amendment is to revise the Statement of Work in its entirety
2) All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N5523623Q0217
X 9B. DATED (SEE ITEM 11)
08-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2023
CODE
SOUTHWEST REGIONAL MAINTENANCE CENTER
CODE 410A 3755 BRINSER STREET, STE 1
SAN DIEGO CA 92136
N55236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
daniel.calleja.civ@us.navy.milEMAIL:(619)556-4734TEL:
DANIEL CALLEJA / CONTRACTING OFFICER
N5523623Q0217
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
SECTION C: DESCRIPTIONS AND SPECIFICATIONS
STATEMENT OF WORK:
COMMERCIAL INDUSTRIAL SERVICES (CIS) TANK CLEANING SERVICES CONTRACT IN
SUPPORT OF THE EMPTYING, CLEANING, OFFLOAD, TRANSFER, TRANSPORTATION, AND
DISPOSAL OF THE 3-129-1-W SALT WATER BALLAST TANK ONBOARD THE USS COMSTOCK (LSD-
45)
NEW MILESTONE EVENT DATE
PURCHASE ORDER START DATE 13-Sep-2023
PURCHASE ORDER END DATE 20-Sep-2023
PURPOSE:
The primary purpose of the Commercial Industrial Services (CIS) Tank Cleaning services contract is to provide labor, services, equipment, and materials for the emptying, cleaning, offload, transfer, transportation, and disposal of
3-129-1-W SALT WATER BALLAST TANK onboard U.S. Navy ships.
The effort required here under shall be performed in accordance with the statement of work contained in Section
C herein, attachments and in accordance with all other terms and conditions set forth herein.
C.1. REFERENCES:
C.1.1 The requirements of the following scope of work, references, and attachments shall be utilized in the execution of this contract unless otherwise stated herein. Whenever specifications, Naval Sea Systems Command
(NAVSEA) Standard Items (NSI), standards, drawings, publications or other documents undergo subsequent revisions, the contractor shall use the latest revised version during delivery order execution. If future revisions result in a change to the contractor’s price, the Contractor shall promptly notify the contract administration office of the revision details and the expected impact. The Administrative Contracting Officer (ACO) will then negotiate and incorporate the necessary changes via bilateral modification to the contract. When future revision result in no change to the contractor’s price, the Contractor shall utilize the latest version as soon as the change becomes known without a need for a contract modification.
(a) NAVSEA Standard Items
Category I NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and shall be invoked in this contract.
The following Category II NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and shall be invoked in this contract:
(b) OPNAVINST 5100.23G; Navy Safety and Occupational Health Program Manual
(c) Occupational Safety and Health Act (OSHA) of 1970
(d) Code of Federal Regulations (CFR) Title 29, Part 1910; Occupational Safety and Health Standards
(e) CFR Title 29, Part 1915; Occupational Safety and Health Standards for Shipyard Employment
(f) CFR Title 40, Part 63, Subpart II National Emission Standards for Shipbuilding and Ship Repair (Surface
Coating)
(g) CFR Title 40, Part 260 through 279; Protection of Environment
(h) CFR Title 49, Part 171 through 177; Transportation
(i) United States Code (USC) Title 10, Section 7311, Repair or Maintenance of Naval Vessels:
Handling of Hazardous Waste
(j) California Code of Regulations (CCR), Title 22, Div. 4.5, Environmental Health Standards for the Management of Hazardous Waste.
(k) National Fire Protection Association (NFPA) Standard 312, Standards for Fire Protection of Vessels During
Construction, Conversion, Repair and Lay-up.
(m) NFPA Standard 306, Standards for the Control of Gas Hazards on Vessels
(n) Resource Conservation and Recovery Act (RCRA)
(p) Commander Fleet Forces Command Instruction (COMFLTFORCOMINST) 4790.3 Work Authorization Form
(WAF)
(q) Commander Navy Region Southwest (CNRSW) Water Quality Program (Revised July 2012) Storm Water Best
Management Practices Policies and Procedures Manual Requirements for Working on Navy Piers, Wharves and
Quay Wall Areas
(r) CNRSW Storm Water Best Management Practices Manual
(s) NAVSEA Standard Work Template 077-001; Hazardous Waste Produced on Naval Vessels; control
(t) San Diego Regional Fuel Waste Transfer Manual. Regional Operations Manual for Fuel Waste Collection and
Treatment Facilities.
(u) Current Southwest Regional Maintenance Center (SWRMC) Approved Adhesive, Paint and Solvent Lists
(v) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-003. Transfer of
Fuel Waste from Vessel to the Pier Fuel Waster Riser or Ballast Tanker Truck.
(w) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-008. Procedure for Offloading Trucked Fuel Waste at Naval Base Coronado North Island and Naval Base San Diego and Fuel
Waste Treatment System.
(x) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-020. Waste
Acceptance Criteria for Ballast/Salt Water Ballast Tank and Fuel Waste Treatment Systems.
(y) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-022. Waste
Acceptance Form.
(z) S9086-T8-STM-010; Naval Ship’s Technical Manual (NSTM) Chapter 593; Pollutant Control.
(aa) S9086-SN-STM-010; NSTM Chapter 541; Ship Fuel and Fuel Systems
(ab) S9086-SP-STM-010; NSTM Chapter 542; Gasoline and JP-5 Fuel Systems.
(ac) NAVSEA 0900-LP-016-0010; MIL-HDBK-291; Military Handbook Cargo Ballast/Salt Water Ballast Tank
Cleaning.
(ad) S0570-AC-CCM-010, NAVSEA Technical Publication. Industrial Ship Safety Manual for Fire Prevention and
Response
(ae) NAVFAC P-307, Management of Weight Handling Equipment.
(af) Base Support Vehicles & Equipment (BSV&E) Standard Operating Procedure (SOP) #06-2, Naval Base
Coronado Contractor Crane Oversight Plan
(ag) BSV&E SOP #06-3, Naval Base San Diego Contractor Crane Oversight Plan.
(ah) BSV&E SOP #06-4, Naval Base Point Loma Contractor Crane Oversight Plan.
(ai) Suspension of Temporary Services, Drawing X-99471, Puget Sound Naval Shipyard.
(aj) Work Item 992-11-902, Temporary Services, installation and suspension.
C.1.2 If the contractor does not have copies of the statement of work, references, documents, technical manuals, military standards, procedures, and regulations etc., the Shipbuilding Specialist (SBS) must be notified so that copies can be disseminated.
C.2 GENERAL REQUIREMENTS:
C.2.1 The quality of all services rendered shall conform to the highest standard in the relevant profession, trade or field of endeavor. Without additional expense to the Government, the Contractor shall be responsible for obtaining any necessary insurance, licenses and permits, and for complying with all applicable laws, codes and regulations, in connection with the performance of the work. The Contractor is responsible for ensuring that proper safety and health precautions are taken to protect the workers and the property of others.
C.2.2 All work being performed in this contract shall be accomplished in accordance with (IAW) references C.1.1(a) through C.1.1(aj).
C.2.3 The Contractor shall provide all management, administrative services, labor, materials, tools, equipment, rigging services, crane services, Marine Chemist Gas Free Certification, scaffolding, transportation, disposal, utilities (i.e. air, water and electricity, etc.), and required services/support to accomplish the work specified in this contract.
C.2.3.1 For work on U.S. Navy ships and other Government vessels, the Contractor shall follow the requirements of references C.1.1(a) through C.1.1(aj) for the suspension of temporary services (piping, hoses, lines, etc.) in support of maintenance and modernization availabilities.
C.2.4 The Contractor shall provide all cranes necessary to accomplish the work under this contract, including floating cranes when required and cranes with a boom capacity great enough to reach ships berthed second ship out
IAW references C.1.1(a) through C.1.1(aj).
C.2.5 The Contractor may utilize government utilities (i.e. air, water, and electricity, etc.) available at the pier to accomplish the work specified in this contract. It is the Contractor’s responsibility to arrange for, coordinate with, meet the requirements of, and pay Naval Facilities Engineering Command, Southwest (NAVFAC-SW) for use of government utilities.
C.2.6 The Contractor shall comply with the Occupational Safety and Health Standard for Shipyard Employment
(CFR, Title 29, Part 1915) promulgated under Public Law A85-742, Amended Section 41 of the Longshoremen’s and Harbor Workers Compensation Act (33 U.S.C.942) and adopted by the Department of Labor as Occupational
Safety and Regulations, for all work being performed under this contract on the navigable waters of the United
States including any dry-dock or marine railway. Nothing contained in this contract shall be construed as relieving the Contractor from any obligation, which it may have for compliance with the aforesaid regulations IAW references
C.1.1(a) through C.1.1(aj).
C.2.7 The Contractor shall immediately notify and obtain acknowledgement by the Contracting Officer (KO) and the SBS verbally and in writing of difficulties that may jeopardize the completion of specified work.
C.2.8 The Government will not be responsible for work delays or stoppages caused by the Contractor’s failure to comply with registration and access requirements. Similarly, the Government shall monitor and take appropriate action against Contractor’s who repeatedly or egregiously violate access control requirements.
C.2.9 The Contractor shall complete the work requirement specified in this contract within the Milestone Events and
Dates provided which includes weekends and holidays. Work may be required outside normal working hours.
Normal working hours are defined as between 0500 and 1800, Sunday through Saturday.
C.2.10 The Contractor shall notify the Ship’s Authorized Representative (SAR) prior to start of work noting equipment and systems that require isolation so that “Tag Outs” can be accomplished as required. The Contractor shall ensure complete tag-out of the Primary System and Subsystems are accomplished prior to the execution of the disconnection, onsite manning and execution process of the Ballast Tank cleaning service.
C.2.11 The Contractor shall follow procedures for system tag-out IAW references C.1.1(a) through C.1.1(aj).
C.2.12 The Contractor shall notify the SAR immediately when all work required by the contract are completed and the system is ready for activation and removal of tags.
C.2.13 The Contractor shall coordinate schedules of work-affected areas with the other contractors and Ships
Authorized Representative (SAR) daily at the beginning of each shift.
C.2.14 The Contractor awarded this contract shall submit a Test and Inspection Plan (TIP) and a Production
Schedule specific to this contract. The TIP and Production Schedule shall be submitted to the SBS and the Quality
Assurance Specialist (QAS) electronically no later than one (1) day prior to the start of productive work under this
C.2.15 The Contractor is encouraged to attend ship checks as specified by the SBS to identify the work requirement, Milestone Events and Dates, and other pertinent information. The Contractor shall immediately notify the SBS if the Contractor will be delayed or will be unable to attend the ship check.
C.2.16 The Contractor shall be responsible for the removal of all interferences or equipment necessary to accomplish the work specified on this contract. The Contractor shall reinstall all previously removed interferences or equipment upon completion of the work specified on this contract IAW references C.1.1. (a) through C.1.1(aj).
C.2.17 The Contractor shall ensure required engineering controls to prevent environmental pollutant discharges from work areas and safety boundaries are in place prior to the start of the work required in this contract.
C.2.18 Nothing in this contract shall relieve the Contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including, but not limited to obtaining of licenses and permits, in connection with the use of hazardous material and the generation of hazardous waste in the performance of this
C.2.19 The Contractor shall comply with applicable federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
C.3 SCOPE OF WORK:
C.3.1 Within 24 hours of Milestone Events and Dates, the Contractor shall submit one legible copy, in hard copy or electronic media, a Condition Found Report (CFR) to the SBS identifying discrepancies associated with the equipment/areas specified in each delivery order. The Contractor shall be responsible for discrepancies or damages not noted in the initial CFR.
C.3.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of subsequent
CFR’s identifying discrepancies or damages associated with the description of work to the SBS within 4 hours of conditions found.
C.3.3 Within 24 hours after receipt of the awarded Purchase Order, the Contractor shall submit Pier Laydown request to the CIS SBS IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aj).
C.3.4 Prior to the start of work under this contract the Contractor shall ensure that the required Work Authorization
Form (WAF) is properly filled out and authorized IAW the ships WAF Program and references C.1.1.(a) through
C.1.1(p). The authorized WAF shall be posted at the primary and secondary entrances to the location of work. In the event the ship does not have an established WAF program, the Contractor will provide the necessary documents.
C.3.5 The Contractor shall be responsible for the cleanup of any spills and/or mitigation of hazards associated with the work being performed hereunder, from the ship and from the Naval Facility IAW all applicable regulations and references C.1.1(a) through C.1.1(aj).
C.3.6 The Contractor shall be responsible for the cleanliness of the work area. All waste created by the Contractor as a result of the drain and disposal services specified herein, shall be removed from the ship at the end of each shift.
C.3.7 The Contractor shall be responsible to gas free the space(s) IAW with references C.1.1(a) through C.1.1(aj).
The Contractor shall provide gas-free certification and maintain certification IAW 29 Code of Federal Regulations
Part 1915. The Contractor shall post the gas free certificate on the job site during the performance period.
C.3.8 The Contractor shall be responsible for the removal and disposal of existing fuel waste liquids, contaminated liquids, grease, fuel, oil and dirt liquids during the performance of the work required under this contract, from the ship and from the Naval Facility IAW all federal, state, and local laws, codes, ordinances, regulations and references
C.3.9 All waste generated that is deemed non-hazardous after laboratory testing shall be removed from the pier daily and shall not be allowed to accumulate. Waste generated deemed hazardous shall be removed from the pier no later than the last day of the assigned performance period. All waste shall be properly and legally disposed of in accordance with all applicable State, Local, and Federal Regulations and IAW references C.1.1.(a) through
C.1.1.(aj).
C.3.10 Prior to start of drain and disposal work, the Contractor shall ensure that required safety boundaries and engineering controls are in place to prevent environmental pollutant discharges from work areas.
C.3.11 The Contractor shall be responsible for the labor, equipment, services and materials required to accomplish the drain and disposal services contract in support of the emptying, offload, transfer, transportation, and disposal of fuel waste liquids, contaminated liquids, grease, fuel, oil and dirt required under this contract IAW references
C.3.12 The Contractor may utilize the NAVFAC-SW Bilge and Fuel Waste Treatment System (BOWTS) facilities located at Naval Base San Diego for disposal of the fuel waste liquids, contaminated liquids, grease, fuel, oil and dirty liquids in the performance of the work under this contract IAW references C.1.1(a) through C.1.1(aj). In the event the BOWTS is not available for use, the contractor is responsible for disposal of the fuel waste liquids, contaminated liquids, grease, fuel, oil and dirty liquids.
C.3.13 The Contractor shall comply with applicable federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
C.3.14 The Contractor shall provide covered containers, offload, transportation, and disposal of fuel waste liquids, contaminated liquids, grease, fuel, oil and dirt in the performance of the work under this contract, to meet Clean Air
Act, Clean Water Act and Hazardous Waste Regulations.
C.3.15 The Contractor shall identify all hazardous waste and extremely hazardous waste produced during the performance of this contract.
C.3.16 Trucks intended for hauling hazardous waste shall be state certified and licensed for transporting hazardous waste. Contractor will manifest all hazardous waste using site specific Environmental Protection Agency (EPA) generated Identification (ID) number.
C.3.17 The Contractor shall submit emission inventory, Hazardous Waste Manifest Form to SWRMC Code 106-B
Environmental Dept. upon completion of this contract.
C.3.18 All Contractor personnel and equipment must be licensed/registered/certified to operate/maintain/service all equipment involved in the performance of the requirements of this contract.
C.3.19 The Contractor shall submit all required permits to SWRMC Code 106-B for all Contractor owned or rental equipment prior to start of work.
C.3.20 The Contractor shall comply with Federal Emergency Planning Community Right to know Act (EPCRA) and permit conditions for all APCD permitted equipment during all drain and disposal evolutions. Submit one completed copy of each report to SWRMC Code 106-B, Environmental Department in accordance with C.1.1.(a) through C.1.1.(aj).
C.4 INSPECTION PROCEDURES:
C.4.1 (I) Inspections require verification and documentation by a separate individual, other than the person who has accomplished the work, who is qualified as an inspector and currently certified where required by the technical documents.
C.4.2 (V) Inspections require verification and documentation by the qualified tradesperson, trade supervisor, or inspector.
C.4.3 (Q) Inspections require verification and documentation by a qualified Technical Representative IAW reference
C.1.1(a) 009-90.
C.4.4 (G) A symbol inserted in a work item to establish a point in the sequence of accomplishment of work at which time the SBS shall be notified by the prime contractor in all cases to permit observation of a specific test or inspection (I) (V) (Q) by the government.
C.4.5 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the SBS of checkpoints via electronic method. Notification shall be at least two hours, but not more than one working day, prior to commencing the specific requirements in the paragraph annotated with the symbol (G). Notify the SBS not later than four hours before the end of the last preceding day shift when tests or inspections following a (G) checkpoint is scheduled after normal day shift working hours, on a weekend, or on a federal holiday. Normal working hours are defined as between 0500 and 1800, Sunday through Saturday.
C.4.6 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the SBS for cancellation of the scheduled test or inspection as soon as known, but no later than one hour prior to the scheduled check point.
C.4.7 For (G) checkpoints scheduled after normal working hours, on a weekend, or a federal holiday, the Contractor shall notify the SBS to cancel a scheduled test or inspection as soon as known, but no later than two hours prior to the scheduled check point.
C.5 SALT WATER BALLAST TANK: CLEANING, DRAIN, AND DISPOSAL
C.5.1 The Contractor shall conduct a preliminary inspection of the Salt Water Ballast Tank specified in this contract
(listed below) and the adjacent compartment(s) to determine readiness for gas free certification prior to call out of a certified Marine Chemist.
1. 3-129-1-W, SALT WATER BALLAST TANK
C.5.2 Provide labor, services, equipment and materials for the empty, disposal, offload, and transportation of solids waste, liquid waste, hazardous waste, non-hazardous waste, fuel, dust and debris generated in accordance with the statement of work.
1. 3-129-1-W, SALT WATER BALLAST TANK : 8,000 GALLONS
(I) (V) CHECK POINT (Marine Chemist Certification)
C.5.3 Certification of Compartments. Provide labor services, equipment and materials for a certified marine chemist to certify compartment(s) and/or piping system as "SAFE FOR WOKERS" and "SAFE FOR
HOTWORK" (when required) for the duration of the delivery dates on Naval vessels in accordance with references
C.1.1.a through C.1.1.(aj) and the Statement of Work.
1. 3-129-1-W, SALT WATER BALLAST TANK : 19,000 GALLONS capacity
C.5.4 The Contractor shall submit two legible copies of the “Marine Chemist Certificate” to the SBS and the SAR for each of SALT WATER BALLAST Tank certified within 24 hours after certification.
C.5.5 The Contractor shall notify the SBS if certification cannot be issued due to conditions beyond the Contractor control.
C.5.6 The Contractor shall coordinate with ships force (S/F) for the opening and closing of the Salt Water Ballast
Tank manhole and access covers.
C.5.7 The Contractor shall provide new gasket(s) for all of the tank(s) manhole and access cover(s) opened during this performance of this cleaning, drain and disposal services contract.
C.6 SALT WATER BALLAST TANK CLEANING:
(I) (G) CHECK POINT Cleanliness
C.6.1 The Contractor shall provide labor, services, equipment, and material to clean and wipe down the salt water ballast tank in accordance with the requirements of references C.1.1.a through C.1.1.(aj). The Salt Water Ballast
Tank area and surfaces shall be wiped clean by hand with lint-free rags and if necessary, solvent wipe to remove all residues of fuel waste liquids, contaminated liquids, grease, fuel, oil and dirt.
C.6.2 The Contractor shall clean the Salt Water Ballast Tank and associated piping (when required) in accordance with the requirements of references c.1.1.a through c.1.1.(aj). Associated piping is defined as an assembly of pipe, tubing, valves, fittings and related components forming a whole or a part of a system which starts or terminates inside the Salt Water Ballast Tank.
C.6.3 The Contractor shall provide to the Government a flowmeter reading for each Salt Water Ballast Tank of the actual volume of Salt Water Ballast Tank liquids removed (drained and disposed) for each locations listed in the contracts. The Contractor shall return to the Government the remaining amount of the Salt Water Ballast tank liquids not removed (drained and disposed) during the performance of this contract.
C.6.4 The Contractor shall coordinate with S/F for the disconnection of piping to allow contractor entry to piping systems when required.
C.6.5 The Contractor shall install blank flanges on associated piping at the first valve or flange outside of each Salt
Water Ballast Tank when required.
C.6.6 The Contractor shall submit two legible copies of the location of all installed blank flanges to the SAR for entry into the Engineering Tag-out Log. When work is completed, the Contractor shall ensure that all installed blank flanges are removed and associated piping is restored to an operational status. After removal of all installed blank flanges, notify the SAR for entry into the Engineering Tag-out Log.
C.6.7 The Contractor shall coordinate the drain and disposal services through the ship’s Damage Control Assistant
(DCA) via the SAR to maintain ships stability and prevent flooding.
C 6.8 Emptying of the Salt Water Ballast Tank shall include removal of all existing fuel waste, petroleum products, water, contaminated liquids, contaminated liquids, sludge and debris, foreign objects, and materials from the locations listed.
C.6.11 The Contractor shall ensure that harmful or offensive odors are controlled IAW references C.1.1(a) through
C.1.1(aj), and not allowed to escape into the interior of the vessel.
C.6.12 The Contractor shall ensure that isolated pockets located in and around foundations, piping, machinery, equipment, ships structures, and sumps have been pumped of fuel waste liquids, contaminated liquids, grease, fuel, oil and dirt.
C.6.13 The Contractor shall remove and dispose of the Salt Water Ballast Tank liquids in accordance with all federal, state, and local laws, codes, ordinances, and regulations. Fluids discovered as being hazardous shall be handled and disposed of IAW references C.1.1(a) through C.1.1(aj).
C.7 CONVEYANCE OF SALT WATER BALLAST SERVICE:
C.7.1 In the event the BOWTS piping system is not available, the Contractor shall provide an empty and clean conveyance to off load and transport materials and liquids removed. The conveyance shall be empty and free of all debris, foreign materials, and contaminants. Use of barges for conveyance is not authorized. Accomplish IAW all appropriate regulations and references C.1.1(a) through C.1.1(aj).
C.7.1.1 Each conveyance to be used by the contractor shall check-in at the NAVFAC-SW BOWTS Operating
Center, Bldg. 3588, Naval Station San Diego, prior to going to the work site. The BOWTS Operating Center normal working hours of operation is 8:00 AM – 4:00 PM, seven days a week. Phone number (619) 556-9688.
Between the hours of 4:00 PM and 8:00 AM, calls must be directed to the NAVFAC-SW Duty Desk at (619) 556-
7349.
C.7.2 Conveyance for off load and transport of hazardous waste to the BOWTS shall be accomplished IAW the requirements of references C.1.1(a) through C.1.1(aj).
C.7.3 The Contractor shall remove and dispose of fuel waste, petroleum products, water, contaminated liquids, contaminated liquids, sludge, and debris in accordance with all federal, state, and local laws, codes, ordinances, and regulations. Fluids discovered as being hazardous shall be handled and disposed of in accordance with references
C.1.1.d. through C.1.1.r.
(V) CHECK POINT (Empty and Clean Conveyance)
C.7.4 In the event the BOWTS piping system is not available, the Contractor shall provide an empty and clean conveyance to off load and transport materials and liquids removed. The conveyance shall be empty and free of all debris, foreign materials, and contaminants. Use of barges for conveyance is not authorized. Accomplish IAW all appropriate regulations and references C.1.1(a) through C.1.1(aj).
C.7.5 The Contractor shall measure and record the quantity and type of all liquid products removed by using the
Uniform Hazardous Waste Manifest and the Waste Acceptance Form.
Fill in each block that is appropriate for fluids removed.
(V) CHECK POINT (Verification of Quantity)
C.7.6 The Contractor shall inspect and document each conveyance prior to leaving work site to verify quantity of fluids contained in each conveyance corresponds to the Uniform Hazardous Waste Manifest and the Waste
Acceptance Form.
C.7.7 Each conveyance shall check-out at NAVFAC-SW BOWTS Operating Center within two hours after sealing of the conveyance and prior to departing Naval Facility to submit the Uniform Hazardous Waste Manifest and the
Waste Acceptance Form.
C.7.8 After normal working hours, the contractor shall submit the Uniform Hazardous Waste Manifest and the
Waste Acceptance Form to the NAVFAC-SW BOWTS Operating center no later than 9:00 AM the following day.
C.7.9 The Contractor shall deliver fuel waste or contaminated effluent to the nearest Department of Defense fuel or designated handling facility after checking out of the NAVFAC-SW BOWTS Operating Center.
C.7.10 If test results exceed limits specified in references C.1.1(v) through C.1.1(y), the Contractor shall assume responsibility as sole generator of the hazardous waste, complete a new manifest and dispose of fluids accordingly.
C.7.11 The Contractor shall submit a copy of the Uniform Hazardous Waste Manifest and the Waste Acceptance
Form to the SBS.
C.8 COMPLETION OF WORK
(V)(G) CHECK POINT: “Final Contamination/Damage Inspection”
C.8.1 The Contractor shall accomplish an inspection newly cleaned Salt Water Ballast Tank interior surfaces and associated piping for the locations and system identified in the contract IAW references C.1.1.(a) through C.1.1.(aj).
Associated piping is defined as an assembly of pipe, tubing, valves, fittings and related components forming a whole or a part of a system which starts or terminates inside the Salt Water Ballast Tank. Allowable defects: NONE
C.8.2 The inspection shall include adjacent compartments that maybe affected by the Salt Water Ballast Tank cleaning, draining and disposal for the locations and system identified in the contract IAW the requirements of the statement of work and references C.1.1(a) through C.1.1(aj). Allowable defects: NONE
C.8.3 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the results of the requirements of C.8.1 and C.8.2 to the SBS.
C.9 DELAYS AND DISRUPTIONS:
C.9.1 The Contractor shall coordinate his work efforts on a daily basis with the SAR to schedule his work to avoid delays and disruptions. More than one Contractor working in the same area is a normal condition encountered during ship repair periods. Delays caused by these events will be at no cost to the Government and proper notification shall be given to the SBS and to the ACO IAW paragraph C.2.7.
C.9.2 Drills, shifting of berths and piers, repositioning of the ship, inspections, serving of meals, official ceremonies, additional security requirements, operation of equipment, and scheduled meetings are to be considered normal evolutions to be encountered when working onboard naval installations and vessels rather than unusual occurrences.
Delays caused by these events will be at no cost to the Government and proper notification shall be given to the SBS
IAW paragraph C.2.7.
C.9.3 The Contractor shall be responsible for relocation of Contractor Furnished Equipment (CFE) and contracted utilities in the event of berth shifts, pier shifts, repositioning of the ship and outboard another vessel.
C.9.4 The Contractor shall be responsible for coordinating work efforts with other Contractors working in the same or adjacent areas on board naval vessels.
C.10 PROGRESS MEETINGS/REPORTS:
C.10.1 The Contractor shall participate in daily or weekly progress meeting(s) with the ship’s Maintenance Team as required. The Contractor shall be prepared to address all facets of the work including but not limited to schedule and/or problems with the ongoing work and the proposed actions to be taken to resolve these problems.
C.10.2 The Contractor shall provide a progress report of all active jobs to the SBS, on Monday or the first business day of each week, no later than 8:00 a.m.
C.10.2.1 The Contractor weekly progress report shall contain at the minimum the following information:
a. Location (Compartment Number, Frame Numbering)
b. Work Description for each location (Date WAF Opened, Date Started Drain and Disposal, Date Completed, Date WAF Closed)
c. Gallons Coverage per Location and Total amount – based on the contract
d. Gallons of liquid removed and disposed – Actual amount (flowmeter reading)
e. Total gallons of liquids remove and disposed – Actual Amount (flowmeter reading)
C.11 DELIVERY OF SERVICE:
C.11.1 The Contractor shall commence work on this contract and the awarded Purchase Order within 24 hours of the
Start Date. The Contractor shall complete the work requirement specified in the Milestone Events and Dates of the awarded Purchase Order, which includes weekends and holidays.
C.11.1.1 The Contractor must also be capable of performing multiple contracts at the same time.
C.11.2 The Contractor shall complete the work requirement specified in the Milestone Events and Dates of the awarded Purchase Order, which includes weekends and holidays, except that when the need of the Government permits, the Purchase Order may provide a longer time of delivery.
C.12 SECURITY REQUIREMENTS:
C.12.1 The Contractor shall submit a list providing security information to the SWRMC Security Management
Office via e-mail at swrmc.security.var.fct@navy.mil no later than five days after the contract award date. The data is to include the list of all Contractor personnel supporting the contract effort, social security numbers, addresses, citizenship, level of clearance and radiological controls indoctrination training documents (for CVN contracted work only). The Contractor shall submit a new list whenever there is any change in the security information listing.
C.12.2 The Contractor shall issue each employee an identification card containing the employee's picture, which shall be utilized for positive identification. The card shall be worn in a visible location when employee is on
Government property. For additional identification, the Contractor’s employee shall also display visible representation of the company name or logo.
C.12.3 For work on Aircraft Carriers, access will only be granted to employees who are United States citizens and have received radiological control indoctrination training prior to the issuance of the Purchase Order.
C.12.4 The contractor shall submit the DBIDS documents to the SWRMC Security Management Office via e-mail at swrmc.security.var.fct@navy.mil for review and forwarding to the Naval Base San Diego Pass and ID for processing and approval. The Contractor shall submit new DBIDS documents whenever there is any change in the information submitted.
C.13 HAZARDOUS WASTE:
C.13.1 All waste generated deemed non-hazardous shall be removed from the pier daily and will not be allowed to accumulate. Waste generated deemed as hazardous shall be removed from the pier no later than the last day of the assigned performance period.
mailto:swrmc.security.var.fct@navy.mil mailto:swrmc.security.var.fct@navy.mil
C.13.2 The Contractor shall submit a copy of all reports of chemical analysis or other documents evidencing identification of the hazardous waste to SWRMC Environmental Department Code 106B upon completion of this
C.13.3 The analysis of any waste requiring the services of a testing laboratory (e.g., liquids, used solvent material) shall be performed by a laboratory certified by the California Department of Public Health (CDPH) to be competent and equipped to conduct the specific type of analysis to be performed.
C.13.4 The Contractor shall comply with the requirements of NAVSEA Standard Work Template 077-001
Hazardous Waste Produced on Naval Vessels; control IAW references C.1.1.(a) through C.1.1.(aj).
C.13.5 The Contractor shall submit one legible copy, in hard copy or approved transferrable media of the hazardous waste manifest form signed by the owner or operator of the disposal facility to the supervisor within 48 hours of receipt from owner or operator of disposal facility IAW C.1.1.(a) and C.1.1(aj).
C.14 STANDARDS OF WORKMANSHIP:
C.14.1 The quality of all services rendered shall conform to the highest standard in the relevant profession, trade or field of endeavor. All services shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade, or field, and holding any licenses required by law.
C.14.2 None of the services required by this contract shall be subcontracted to or performed by persons other than the Contractor or the Contractor’s employees without the prior notification of the Contracting Officer.
C.15 BILLING/INVOICING:
C.15.1 At the time of billing/invoicing, the Contractor shall submit one hard copy and one electronic copy of the invoice package containing all of the information, documents, and reports, (i.e., Purchase Order, modifications, CFR’s, Production Schedule, TIP, WAF, check points, Gas Free Certificate, laboratory test results, hazardous waste reports, Uniform Hazardous Waste Manifest and the Waste Acceptance Form) compiled during the performance of the work for each Purchase Order.
C.15.2 The Contractor shall submit the invoice package no later than 14 days after completion of the work required under this contract.
C.16 CONTRACTOR FURNISHED EQUIPMENT:
C.16.1 The Contractor shall furnish all necessary labor, services, materials and equipment required to perform work requirements of this contract and awarded contract.
C.16.2 It shall be the Contractor’s responsibility to maintain all Contractor furnished equipment, it shall be properly calibrated, tested and in state of repair, that is ready for use, to the extent necessary to avoid impacting the performance requirements of this contract.
C.16.3 All Contractor furnished drain and disposal equipment such as hoses, valves, and filters shall be neatly routed out of walk ways and poses no trip hazards to ship’s force. Contractor shall furnish hose tree, to ensure equipment is out of the way.
C.17 NON-NAVY OWNED CRANES:
C.17.1 The Contractor shall adhere to and follow the requirements of references C.1.1.(a), C.1.1.(ae), C.1.1.(af), C.1.1.(ag), and C.1.1.(ah). The following is a list of minimum requirements that Contractors shall comply with for all Purchase Orders that may result in the use of a crane for the accomplishment of work.
C.17.2 The Contractor shall notify the Contracting officer, in advance, of the intent of bringing a non-Navy owned crane onto a Navy shore installation. All entries shall be through a prearranged entry point IAW references
C.1.1.(a), C.1.1.(ae), C.1.1.(af), C.1.1.(ag), and C.1.1.(ah).
C.17.3 The Contractor shall comply with the applicable American Society of Mechanical Engineers (ASME) standards (e.g., B30.5 for mobile cranes, B30.22 for articulating boom cranes, B30.3 for construction tower cranes, and B30.8 for floating cranes). For barge mounted mobile cranes, a load indicating device, a wind indicating device, and a marine type list indicator readable in one-half degree increments are required. In addition, the Contractor shall comply with specific naval crane safety and operation regulations/standards specifically required by the Navy shore installation and state or local Government.
C.17.4 The Contractor shall certify that the crane and rigging gear meets the requirements of OSHA 29 CFR Part
1915 – Occupational Safety and Health Standards for Shipyard Employment by providing a Certificate of
Compliance. The Certificate of Compliance shall comply with can be downloaded from the NAVFAC Naval Crane
Center website, https://www.navfac.navy.mil/navfac_worldwide/specialty_centers/ncc/about_us/resources/p307/p307_forms.html.
C.17.5 The Contractor shall also certify that all of its crane operators working in the naval activity have been trained not to bypass safety devices (e.g., anti-two block devices) during lifting operations. The Certification of
Compliance form shall be posted on the crane. For mobile cranes with original equipment manufacturer (OEM) rated capacities of 50,000 pounds or greater, the crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a Government agency, or an organization that tests and qualifies crane operators). Proof of current qualification shall be provided. The Contractor shall certify that the crane operator is qualified and trained for the operation of the crane to be used.
C.17.6 The Contractor shall provide a critical lift plan to NAVFAC for concurrence prior to the lift IAW references
C.1.1.(a), C.1.1.(ae), C.1.1.(af), C.1.1.(ag), and C.1.1.(ah). For each of the following lifts: lifts over 75 percent of the capacity of the crane or hoist (lifts over 50 percent of the capacity of a barge mounted mobile crane’s hoists) at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. The plan shall include the following as applicable:
C.17.6.1 The size and weight of the load to be lifted, including crane and rigging components that add to the weight.
The OEM's maximum load capacities for the entire range of the lift shall also be provided.
C.17.6.2 The lift geometry, including the crane position, boom length and angle, height of lift, and radius for the entire range of the lift. This applies to both single and tandem crane lifts.
C.17.6.3 A rigging plan, showing the lift points, rigging gear, and rigging procedures.
C.17.6.4 The environmental conditions under which lift operations are to be stopped.
C.17.6.5 For lifts of personnel, the plan shall demonstrate compliance with the requirements of
29 CFR 1926.550(g).
C.17.7 For barge mounted mobile cranes, barge stability calculations identifying barge list and trim based on anticipated loading; and load charts based on calculated lists and trim. The amount of list and trim shall be within the crane manufacturer’s requirements.
https://www.navfac.navy.mil/navfac_worldwide/specialty_centers/ncc/about_us/resources/p307/p307_forms.html
C.17.8 The Contractor shall notify the Contracting officer as soon as practicable, but no later than four hours after any weight handling equipment (WHE) accident. The Contractor shall investigate and report all accidents IAW references C.1.1.(a), C.1.1.(ae), C.1.1.(af), C.1.1.(ag), and C.1.1.(ah)
C.18 ORDERING ADDITIONAL WORK:
C.18.1 The following procedure will be used to order additional work, any work related to the cleaning, drain and disposal of the Salt Water Ballast Tank liquids that is not covered by a fixed price line item, which is necessary to satisfactorily complete the work delineated under the contract. Such work may be called for by the issuance of a contract/contract modification, by the Contracting Ordering (KO), during the term of the contract.
C.18.2 During the course of work under other fixed price contract line items, the contractor shall promptly recommend to the KO, in writing, additional work as he discovers the need for such work. Concurrently, the contractor shall quote a price and delivery time for the additional work. The KO shall promptly review the recommendation and may, after reaching agreement with the contractor, issue a contract/contract modification. The
Government has no obligation under this paragraph to issue any contract/contract modification.
C.18.3 The contractor shall not proceed with the additional work until a contract/contract modification has been issued. Whenever the KO determines that it is in the interest of the Government not to delay performance of the work while a price is being negotiated, the KO may specify in the contract/ contract modification that the contractor shall proceed with additional work. In every case, prior to completion of the work called for therein, the parties shall negotiate a price and delivery schedule as expeditiously as possible and modify the contract/ contract accordingly.
C.18.4 Government requirements for additional work shall be issued as contract/ contract modifications under this contract by the KO. The KO will negotiate a firm fixed amount of man-hours and material dollars with the contractor. The price of the contract modification for the additional work will be based on negotiated man hours multiplied by the hourly rate bid for additional work in Section B, plus negotiated material dollars.
a. In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials on undisclosed work shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under material items. Any material handling charges incurred by the contractor should be included as a factor in the hourly rate for additional work.
b. In negotiation a fixed number of man hours for additional work, the contractor’s proposal shall include quality assurance, engineering and supervision hours, in additions to trade hours required to accomplish the work as long as the hours proposed are not covered by a indirect cost pool under the contractor’s accounting system. All hours treated as indirect hours under the contractor’s accounting system must be accounted for as a factor included in the hourly rate. The Government will not agree to pay for separate indirect hours in the man hour negotiations.
C. 19 EXTENSION OF COMMERCIAL WARRANTY
Contractors shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that, such warranty is available at no additional cost to the Government.
Contractors shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government’s rights under the “Inspection” clause, nor does it limit the Government’s rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
In case any supplies or services furnished by the Contractor under this contract and awarded Purchase Orders for any vessel, or the equipment thereof, shall within ninety (90) days of delivery of the supplies or services to the
Government, or the date of final acceptance, whichever occurs first, prove defective or deficient, such defects or deficiencies shall, as required by the Government, be corrected or repaired by the Contractor to the satisfaction of the KO and the SBS; provided, however, that with respect to any individual work item which is incomplete or deficient at the time of delivery or acceptance, the Contractor's obligation under this requirement to correct or repair such deficiency shall extend ninety (90) days from the date of such correction or repair, whichever occurs first.
(a) “Acceptance,” as used in this clause, means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .