Q0054_ELINs_Revised.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- N5523622Q0054
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q0054_SF18.pdf | ||
| Q0054_SOW.docx | DOCX document | |
| Q0054_ELINs.xlsx | XLSX spreadsheet | |
| Q0054_SF-18.pdf | ||
| Q0054_RFC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |
| CONTRACT: | PUMPS AND MOTORS CONTINGENCY |
| CONTRACTOR: | |
| SHIP: | USS ANCHORAGE (LPD-23) |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | ||
| ELIN 0001 |
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE EXISTING FAN MOTOR FROM THE HOUSING ASSEMBLY TO THE SHOP FOR REPAIR AND INSTALL IN THE NEW HOUSING ASSEMBLY AFTER REPAIR. PICK UP THE NEW GFM VANEAXIAL FAN ASSEMBLY FROM THE PIER TO THE SHOP, REMOVE NEW MOTOR AND INSTALL IN THE EXISTING HOUSING ASSEMBLY ONBOARD THE SHIP. DELIVER THE REPAIRED EXISTING FAN MOTOR WITH THE NEW HOUSING ASSEMBLY BACK TO THE SHIP IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 1) 1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | ||
| ELIN 0002 |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO MECHANICALLY AND ELECTRICALLY DISASSEMBLE THE VANEAXIAL FAN MOTOR ASSEMBLY, REMOVE EXISTING MOTOR FROM THE HOUSING ASSEMBLY AND INSTALL THE NEW GFM MOTOR IN THE EXISTING HOUSING ASSEMBLY IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 2)
1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | |||
| ELIN 0003 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE NEW GFM MOTOR AND THE WHEEL ASSEMBLY IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-15 | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | |||
| ELIN 0004 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHIPBOARD TEST OF THE NEW GFM MOTOR IN ACCORDANCE WITH THE CONTRACT AND THE STATEMENT OF WORK | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | |||
| ELIN 0005 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION IN ACCORDANCE WITH STANDARD ITEM 009-11 | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | |||
| ELIN 0006 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PRESERVATION OF NEW AND DISTURBED LAGGING AND SURFACES IN ACCORDANCE WITH STANDARD ITEM 009-32 | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | ||
| ELIN 0007 |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE EXISTING VENT FAN MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTES 1 AND 2) 1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | ||
| ELIN 0008 |
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 3) 1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | |||
| ELIN 0009 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE OVERHAULED MOTOR AND THE WHEEL ASSEMBLY IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-15 | 1 | $0.00 | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE | |
| EE02-2163 | 01-33-1-Q, FAN ROOM, SS-15 VANE AXIAL FAN | 1 | |||
| ELIN 0010 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP TEST OF THE OVERHAULED MOTOR IN ACCORDANCE WITH THE CONTRACT AND THE STATEMENT OF WORK | 1 | $0.00 | $0.00 |
TOTAL $0.00
| MILESTONE EVENT | DATE |
| 1. Delivery Order Start | 22 February 2022 |
| 2. Ventilation motor dissasembly, install new GFM Motor and Shipboard testing | 22 February - 07 March 2022 |
| 3. Deliver the repaired existing fan motor with the new housing assembly back to ship | 25 March 2022 |
| 3. Delivery Order End Date | 25 March 2022 |
| NOTES: |
| 1. Pick up the new GFM vent fan motor at Pier side. Remove and offload existing vent fan motor from ship to shop. |
| 2. Remove existing vent fan motor and replace with new GFM motor inside the Fan Room. Refer to technical manual S9512-DA-MMC-010 REV 01 FANS, VANEAXIAL A104A4W6 & A105A4W6 and NAVSEA Drawing No. 801629-594 for detailed procedures on the removal and installation of the vent motor to include shipboard operational testing. |
| 3. If machining hours is required other than the collector ring or keyway, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S9512-BX-MMC-010 Fan, Vaneaxial Standard Pressure, Operation and Maintenance and Manufacturer Drawing No. 801629594. |
| 4. Deliver the repaired existing fan motor with the housing assembly back to the ship and turn over to the POC (DCA Adam Scott). |
Over and Above
| OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order. | ESTIMATED AMOUNT | UNIT OF ISSUE | FBLR for ELIN 0011. MATERIAL HANDLING RATE FOR ELIN 0012 | TOTAL | |
| ELIN 0011 | ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS |
ST Fully Burdened Labor Hour Rate $________
| NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 100 | HR | $0.00 |
| ELIN 0012 | ADDITIONAL WORK - MATERIALS | ||
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. | 30,000.00 | DOLLARS, US | 0% |