ELINS_N5523620Q0013.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
COMMERCIAL INDUSTRIAL SERVICES (CIS) DRAIN AND DISPOSAL SERVICES CONTRACT
Solicitation number
N5523620Q0013
Issued by

About this file

ELINS

View the file

Other files

File Type Posted
N5523620Q0013_RFC.docx DOCX document
SF_18_N5523620Q0013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ELINS / SCOPE SHEET

CONTRACT:TANK AND BILGE CLEANING
CONTRACT NO:
CONTRACTOR:
SHIP:USS SOMERSET (LPD-25)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONEAUNIT PRICEEXT PRICE
ER01-L0083-158-1-Q, ELECTRICAL SHOP,
TANK # 6-180-2-W1BALLAST TANK AND INITIAL GAS FREE CERTIFICATION
ER01-L0093-183-2-Q, ELECTRICAL SERVICE SHOP, TANK # 6-180-2-W1
ELIN: 0001
PROVIDE SERVICES AND MATERIAL TO EMPTY, CLEAN AND MAKE GAS FREE BALLAST TANKS, TO INCLUDE AS "SAFE FOR WORKERS AND SAFE FOR HOT WORK " IN ACCORDANCE WITH THE STATEMENT OF WORK2
JSNLOCATIONGALUNIT PRICEEXT PRICE
ER01-L0083-158-1-Q, ELECTRICAL SHOP,
TANK # 6-180-2-W500BALLAST TANKS
ER01-L0093-183-2-Q, ELECTRICAL SERVICE SHOP, TANK # 6-180-2-W500
ELIN 0002
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE OFFLOAD, TRANSPORTATION AND DISPOSAL OF SOLIDS WASTE, LIQUID WASTE, HAZARDOUS WASTE, NON-HAZARDOUS WASTE, DUST AND DEBRIS GENERATED IN ACCORDANCE WITH THE STATEMENT OF WORK1,000
JSNLOCATIONDAYSUNIT PRICEEXT PRICE
ER01-L0083-158-1-Q, ELECTRICAL SHOP,
TANK # 6-180-2-W9MAINTAIN CERTIFICATION OF COMPARTMENT, GAS FREE CERTIFICATION
ER01-L0093-183-2-Q, ELECTRICAL SERVICE SHOP, TANK # 6-180-2-W9
ELIN: 0003
PROVIDE SERVICES TO MAINTAIN GAS FREE CERTIFICATION , TO INCLUDE AS "SAFE FOR WORKERS AND SAFE FOR HOT WORK" IN ACCORDANCE WITH THE STATEMENT OF WORK18

PAUL DAMIAN, SBS TOTAL: $0.00

NOTES:
1. Period of Performance:

Ballast Tanks:

12-18 November 2019 Clean & Gas Free.

Maintain Cert 19-27 November 2019

2. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the ELINS listed in the scope of work.
3. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aj), and the requirements of the ELINS listed in the scope of work.

Sheet2

Sheet3

File details come from the government source that posted it.